• Title/Summary/Keyword: 리스크 관리계획

Search Result 85, Processing Time 0.031 seconds

A study on the application of water safety plans for the hazard risk management of tap water (수돗물 위해요소 리스크 관리를 위한 물안전계획 적용 연구)

  • Kim, Jinkeun;Kim, Dooil
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.33 no.4
    • /
    • pp.259-268
    • /
    • 2019
  • One of the most effective methods to consistently ensure the safety of a tap water supply can be achieved by application of a comprehensive risk assessment and risk management approach for drinking water supply systems. This approach can be termed water safety plans(WSP) which recommended by WHO(world health organization) and IWA(international water association). For the introduction of WSP into Korea, 150 hazards were identified all steps in drinking water supply from catchment to consumer and risk assessment tool based on frequency and consequence of hazards were developed. Then, developed risk assessment tool by this research was implemented at a water treatment plant($Q=25,000m^3/d$) to verify its applicability, and several amendments were recommended; classification of water source should be changed from groundwater to stream to strengthen water quality monitoring contaminants and frequencies; installation of aquarium to monitor intrusion of toxic substances into raw water; relocation or new installation on-line water quality analyzers for efficient water quality monitoring; change of chlorination chemical from solid phase($Ca(OCl)_2$) to liquid phase(NaOCl) to improve soundness of chlorination. It was also meaningful to propose hazards and risk assessment tool appropriate for Korea drinking water supply systems through this research which has been inconsistent among water treatment authorities.

A Study on the Work Management Method Considering Risks in Nuclear Power Plants (원자력발전소에서 리스크를 고려한 작업관리 방법)

  • Song, Tae-Young
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.10 no.1
    • /
    • pp.37-43
    • /
    • 2014
  • Nuclear power plants(NPPs) are consisted of power production functions and safety functions preventing leakage of radiation. Operators working in NPPs shall maintain these functions during an operation period through various activities such as improvement & modification, corrective maintenance, preventive maintenance and surveillance test. According to the performance of these work activities, there are configuration changes in NPPs systems. Its changes cause the increase of safety risks(CDF) and plant trip risks. Recently, the importance of risk management is increasing gradually in the operation process of NPPs. Therefore, this paper presents the work management methods using the various risk monitoring systems during power operation and overhaul period. Also this paper suggests the optimum application ways of risk systems for work management.

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

Performance-based Pragmatic Fire Protection Technology by the Control of Fire Triangle at Nuclear Power Plants (화재요인 제어를 통한 원전 성능기반 화재방호 실용화 기술)

  • Jee, Moon-Hak
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2011.11a
    • /
    • pp.248-252
    • /
    • 2011
  • 화재가 지속되기 위해서는 화재 3요소 또는 4요소가 충족되어야 하지만 역으로 한 개 이상의 화재 요소를 제어하거나 통제할 경우 화재를 진압할 수 있다. 원자력발전소에서는 화재방호계획에 의해 방화지역마다 화재 요인인 점화원, 가연성물질, 산소 등 지연성가스를 분석하고 연속적인 연소반응을 억제할 수 있도록 화재위험 요인을 관리하고 있다. 최근에는 정량화된 화재위험 분석도구인 화재모델을 활용한 성능기반 화재방호 기술이 원자력발전소의 화재리스크 관리를 위해 도입되고 있다. 성능기반 화재위험 분석 방법은 일반 산업계에서도 사용되고 있으나 원자력발전소의 경우 화재로 유발될 수 있는 원자로 손상 가능성을 수치화하고 통제하기 위하여 위험도정보 활용기술과 성능기반 기술을 통합하여 사용하고 있다. 본 논문에서는 원자력발전소의 화재요인 관리 방법을 위험도정보 활용기술과 성능기반 화재방호 기술에 의거하여 분석하는 방법을 제시하였다. 이 분석의 목적은 원자력발전소의 화재위험 관리 방법을 산업계의 화재방호 전문가들이 공유하고 산업계의 특화된 방법과 원자력발전소의 전문화된 분석기술을 실용화하여 화재리스크를 효과적으로 관리할 수 있는 방법을 마련하기 위한 것이다.

  • PDF

An Analysis of a Construction Project Risk through Execution Plan (실행분석을 통한 건설 프로젝트 시공단계에서의 리스크 요인 도출)

  • Kim, Gi-Yeong
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.33
    • /
    • pp.62-75
    • /
    • 2005
  • 건설 프로젝트 관리의 주요한 목표는 계획된 시간 내에, 정해진 예산으로 규정된 목표(명세 또는 품질)를 확보하는 것이다. 국내 건설 산업은 타 산업 분야에 비하여 생산성이 매우 낮은 편이다. 이는 60년대 이후 급속한 개발 정책에 따른 부작용의 하나로, 하드웨어의 급속한 성장에 비하여 이를 관리하기 위한 소프트웨어의 개발이 부족했기 때문으로 풀이할 수 있다. 이에 본 연구에서는 건설 프로젝트의 생산성을 향상시키기 위한 노력의 일환으로 계획 단계에서의 실행과 완성 단계에서의 실행을 비교하여 이를 작업일보, 감독일지 등의 진도관리 자료를 활용하여 분석하여 건설 프로젝트의 실제적인 생산성 저하 요인을 도출하였다. 따라서 본 연구 결과는 현행 국내의 건설 프로젝트에 대한 사례분석을 통하여 실제적인 생산성 저하 요인을 분석한 것인 만큼 향후 건설 관리 기술의 향상에 많은 도움을 줄 수 있을 것으로 기대된다.

  • PDF

Study on Risk Priority for TBM Tunnel Collapse based on Bayes Theorem through Case Study (사례분석을 통한 베이즈 정리 기반 TBM 터널 붕괴 리스크 우선순위 도출 연구)

  • Kwon, Kibeom;Kang, Minkyu;Hwang, Byeonghyun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.785-791
    • /
    • 2023
  • Risk management is essential for preventing accidents arising from uncertainties in TBM tunnel projects, especially concerning managing the risk of TBM tunnel collapse, which can cause extensive damage from the tunnel face to the ground surface. In addition, prioritizing risks is necessary to allocate resources efficiently within time and cost constraints. Therefore, this study aimed to establish a TBM risk database through case studies of TBM accidents and determine a risk priority for TBM tunnel collapse using the Bayes theorem. The database consisted of 87 cases, dealing with three accidents and five geological sources. Applying the Bayes theorem to the database, it was found that fault zones and weak ground significantly increased the probability of tunnel collapse, while the other sources showed low correlations with collapse. Therefore, the risk priority for TBM tunnel collapse, considering geological sources, is as follows: 1) Fault zone, 2) Weak ground, 3) Mixed ground, 4) High in-situ stress, and 5) Expansive ground. In practice, the derived risk priority can serve as a valuable reference for risk management, enhancing the safety and efficiency of TBM construction. It provides guidance for developing appropriate countermeasure plans and allocating resources effectively to mitigate the risk of TBM tunnel collapse.

UAV-borne, LiDAR-based Elevation Data : Facilitating Risk Knowledge Sharing for Green and Sustainable Communities (LiDAR 활용 : 지식교류를 통한 지속가능한 녹색도시 실현에 관한 연구)

  • Lee Han Gul;Yoon Hong Sic
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.111-112
    • /
    • 2022
  • 모든 도시가 발전하고 번창하기 위해서는 핵심기반시설의 재난 및 안전이 선제적으로 확보되어야 한다. 본 논문에서는 환경핵심기반시설을 중심으로 지역사회가 지속 가능한 녹색도시로 거듭나기 위해 재난준비태세 증진에 실제 활용 가능한 위험지도를 드론에 장착한 LiDAR 센서를 통해 수집한 고도 데이터를 바탕으로 제작하였다. 나아가 지진과 같은 재난 발생 시 시설에서부터 확산하는 관리 오염물의 경로 및 범위를 시범 모의하여, 기능 연속성 계획 및 재난대응 가이드와 연계를 하는 방안을 제시함으로 지자체 중심의 통합적 지역사회의 노력이 발현될 수 있도록 기초적 연구를 진행하고, 전략적 활성화 방안을 제시하였다. 본 연구는 끊임없는 성장과 거듭되는 개발로 인해 변화하는 도시의 형상에 따라 리스크를 최신화하여 대응력을 높이고, 이해관계자들에게 시각화된 재난 범위 모의를 제시함으로써 지역사회와 지자체 역량에 따른 협력적 재난대응태세에 필요한 프레임워크 도출 및 계획수립을 가능하게 한다는 점에서 큰 의의를 지닌다. 또한, 각 영역별 전문가들의 자문을 통하여 본 논문에서 제시된 확산 모의의 방법론이 타당함을 확인하였다. 무엇보다 모호한 "가능한 신속한 자원관리"와 같은 추상적인 대응계획이 아닌, 객관적인 재난자원관리계획을 수립할 수 있게 함으로써 추후 국가적 재난 및 안전역량을 계량화시킬 수 있을 것으로 사료된다.

  • PDF

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

An Algorithm for Hoisting Time Calculation in Super-tall Building Construction (건설 리프트 가감속 능력을 고려한 양중시간 산정 알고리즘 개발)

  • Cho, Chang-Yeon;Shin, Yoon-Seok;Won, Seo-Kyung;Kim, Jung-Yeol;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.120-129
    • /
    • 2011
  • An installation of the construction lift has a few limitations by many constrains and these have influences on labor productivity, that can be changed by vertical-transportation management. In the super-tall building construction, a management of construction lift operation is one of the most important factor, but existing methodologies depend on skilled practitioners' experiences. And it is true that the expertise resulted by the experiences does not transfer to the next generation. This study is a part of lifting-management simulation development which aims at the optimal construction lift management. A proposed algorithm is focus on lifting time calculation considering an acceleration capability. This research evaluates the result accuracy using comparative analysis on simulation result and field measuring time.

An Structural-relationship Study on the Effect of Venture Start-up's Technological Capability on Possibility of Insolvency (벤처창업기업의 기술사업 역량이 부실화리스크에 미치는 영향에 관한 구조관계 분석)

  • Lee, Yong-hoon;Yang, Dong-woo
    • Journal of Technology Innovation
    • /
    • v.25 no.1
    • /
    • pp.35-60
    • /
    • 2017
  • In this study, the effects of Venture Start-up's Technological Capabilities on Financial Stability and Possibility of Insolvency was investigated by use of SEM(Structural Equation Model). Technological Business Capabilities include CEO's Technological Capability, Management Specialization and the Feasibility of the Investment plan. The empirical data for this study were taken from the technology assessment data of Korea Technology Guarantee Fund(KTGF) on 1,419 Venture Start-ups from 2011 until 2012 and the financial data of the following 2 years of the sample. Venture Start-ups established within 7 years, were selected for this study's sample from viewpoint of their 'High-Risk High-Return' characteristic. The results are as follows : Manpower including CEO's Technology-related Knowledge and Experience, Management Organization's Technological Specialization and Cooperativeness, Reasonable Investment and Financing Planning etc. were proved to improve Financial Stability, and therefore reduce Possibility of Insolvency.