Deducting the Critical Enhancement Task of Green Remodeling based on IPA Method (IPA 기법 기반 그린리모델링 중점 강화 업무 도출에 관한 연구)

  • Kwon, Young-In;Hwang, Doo-Won;Jung, Sung-Ho;Lee, Ki-Seok;Park, Jong-Il;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.58-69
    • /
    • 2016
  • As issue of global environment, Korea government sets the specific goal to reduce CO2 emission by 26.9% in construction industry up to 2020. Korea government is encouraging Greenremodeling and progressing the pilot to establish the guideline and instruction. However, There is a lack of the study on establishing process, tasks of Greenremodeling, and Greenremodeling guidelines and instructions are also insufficient, so the vitalization of Greenremodeling is difficult. Therefore, the purpose of this study is deducting Greenremodeling process and the critical enhancement task of Greenremodeling. For that, deducting the Greenremodeling tasks through analyzing of previous research and taking counsel from experts, and drawing the critical enhancement tasks of Greenremodeling using IPA method. From now on, It is conducted in Greenremodeling business and expected to contribute Greenremodeling market.

A Case Study on the Process of Deteriorated Apartment Remodeling (노후 공동주택 리모델링 추진현황에 관한 사례 연구)

  • Song, Min-Jung;Kim, Soo-Jeong;Yoon, Chung-Sook
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2004.11a
    • /
    • pp.375-380
    • /
    • 2004
  • Restricting reconstruction, demand of remodeling has increased in deteriorated apartment. But remodeling process and steps are not taken, it is difficult to advance smoothly. Therefore, this study indicates improvement plans and understands the problems In advancing remodeling. In the result of the investigation the problems are the resident of agreements and legal approval. The goverment must complete laws about remodeling. Also, residents and an association need plans for conversation.

  • PDF

Decision Criterion in Military Apartment Remodeling Project (군인아파트 리모델링에 있어서 항목별 우선순위 결정에 관한 연구)

  • Ryu Kuk-Mu;Kim Gil-Su;Shin Chang-Hyun;Jung Yong- Sik;Chun Jae-You
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.277-280
    • /
    • 2004
  • Since the beginning of our military history, we are continuously interested in supplying apartment for military officers. So we possessed 72,361 households and used in 2002 however, $18\%$ of those are over 20years and need to be remodeled Department of Military has taken this fact seriously To solve the problems, they built more new buildings, rent public buildings and remodeled the old one But, The procedure of present military apartment remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. I've reviewed the study of military apartment business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priority in various groups' decision.

  • PDF

Decision Support Process Model for Energy Efficient Remodeling Projects focused on Building Envelope and Renewable-energy Systems (에너지절감형 리모델링을 위한 적정 대안 선정 프로세스 모델 - 건축물 외피 및 신재생에너지 시스템을 중심으로 -)

  • Shin, Young-su;Cho, Kyuman;Kim, Jae-youn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.91-100
    • /
    • 2015
  • An increase in energy such as natural gas, coal, oil, has occurred to a large amounts of environment impact emissions, it is necessary to reduce in the construction industry for the energy consumption. To encourage remodeling project in developed countries of the majority, on the basis of this, remodeling project in the construction industry has grown to a large amount. Results of analysis of the research related to the advanced remodeling, analysis of the economic validity in accordance with the production and process and building elapsed years of selection alternative of remodeling there has been a problem that has not been properly reflected. In this study, a decision support model that can simultaneously choose the most cost-effective and energy-efficiency alternative. Developed process model, generates a "Remodeling Solution" that combines the renewable energy equipment and envelope system, energy performance evaluation of the application of international standards(ISO-13790, DIN V 18599), perform the economic evaluation through LCCA(Life Cycle Cost Analysis) technique, circulated evaluation and configured to output the optimal Remodeling Solution. The results of applying the model developed in the case, it was confirmed that it is possible to select a choice of cost-effective energy-saving alternative. Then, developed model through this study, it is expected to be able to help highly effective remodeling alternative to selecting by decision-makers.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis (생산성 분석에 기초한 친환경 리모델링 철거공사 기간 산출 방안)

  • Woo, Joong-Pyung;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.124-132
    • /
    • 2013
  • An influx of the population to the city has soared due to industrialization. As times go by, cities become densely populated so Korean government started to construct a number of buildings including apartment housings. Because they have become functionally, structurally, esthetically deteriorated over the past two decades. some improvements are needed. There are mainly two ways to improve old buildings: remodeling and reconstruction. Between the two, the first one is more popular as it is less time-consuming and more eco-friendly. Demolition work comes first for both of them and it should not give negative effects since it is regarded as a CP(Critical path) in the overall process. For this reason, a thorough construction management must be done. The reality, however, demolition is managed by the construction manager's experiences and decisions. If the key factor of demolition which is the planning of manpower and machine equipment, is determined by unscientific and subjective judgments, its period and risk also will increase. In particular, eco-friendly demolition can be more risky because it's been rarely conducted. Therefore, scientific and objective ways of demolition management are needed. In this context, this paper aims at analyzing productivity in each process of demolition focusing on manpower and machinery equipment which are the main parts of demolition assuming that the demands of eco-friendly remodeling demolition projects will be increasing. At the same time, by estimating working period through the output, this paper would be helpful to set up the plans for overall project in earlier stage.

A Measure for Standardization of Old Aged Apartment Remodeling through Application of BIM (BIM 적용을 통한 노후공동주택 리모델링 공사 표준화 방안)

  • Han, Ju-Yeoun;Cha, Hee-Sung;Lee, Dong-Gun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.53-61
    • /
    • 2009
  • With the Government's policy of increasing the supply of residential houses in 1970s, the number of apartments have increased dramatically, and as the result, the number of old aged apartment are increasing too. Therefore remodeling is being executed to improve the residential environment. The rate of remodeling is increasing instead of rebuilding because rebuilding takes more resource and because of the realestate issue. There are many uncertainties in construction progress of remodeling such as communication between personnel, demolition and repair work. There are no standard for remodeling construction so such problems have been causing more problems. It has been found that BIM (Building Information Modeling) may be effective for resolving issues of standardization of remodeling construction. Therefore this study wishes to develop a standard process for remodeling work through BIM to estimate the possibility of its use at remodeling sites. Based on this, I wish to contribute to the issue of achieving construction efficiency pursued by BIM.

Selection process of the optimal structural-reinforcement method in remodeling construction works (리모델링 프로젝트의 최적 구조보강방법 선정 프로세스)

  • Kim, Dong-Pil;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

Improving Remodeling Process of Plant Dormitory Based on User Demand (사용자 요구기반 공장기숙사 리모델링 프로세스 개선)

  • Koo, Kyo-Jin;Park, Sang-Hun;Park, Hyung-Jin;Kim, Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.321-322
    • /
    • 2012
  • Since 1980, rapid social and economic development due to increased plant construction has led to a plant dormitory in a short period. In recent years, by the advent of the durability of dormitory remodeling is a critical need. However, user requirements due to the lack of owner's budget do not reflected. As a result, users have complained about the scope of construction, and construction stakeholder in accordance with the budget efficiency of the complaints have decreased. In this study the remodeling requirements in the planning stages is proposed for the remodeling process. In addition work type and element can select a range of construction worksheet are proposal.