Intangibility, measurement difficulty and irreversibility, which are the characteristics of service, have such problems as obscurity and uncertainty in quality evaluation. Technical entrepreneurship education, a sort of public service, also contains such characteristics of service. To objectively evaluate the service quality of technical entrepreneurship education, this paper drew up factors as hierarchical structure, centered on FAHP technique, and conducted pre-processing, inputted those factors into triangular fuzzy number fuzzy judgement matrix, and calculated their weights. In this manner, this paper proposed a TESE system, through which an analysis can be conducted by drawing relative importance and priorities of the factors. The proposed system can efficiently evaluate the qualitative technical start-up education service quality factors quantitatively in the diversely changing technical start-up environment in view of the highest result quality (41%), which means performance in the relative importance of major factors. Namely, this paper confirmed that clear decision making can be made through an experiment.
Korean Journal of Construction Engineering and Management
/
v.5
no.5
s.21
/
pp.143-150
/
2004
Nowaday, The tendency of complexity and extension of construction fields increase the need for efficient works managements like a construction management. Consequently, by the introduction of Decision-Making Theories, researches for improving construction field's efficiencies are actively performed. Fuzzy Analytical Hierarchy Process method is invented, so that describes a decision maker's ambiguous linguistic judgment with fuzzy numbers. but most of researches on Fuzzy-AHP use symmetric triangular fuzzy function for estimating each evaluation item with the consequence that exact judgments are impossible. those limits are caused by the point that employed fuzzy ranking methods can not support dissymmetric fuzzy numbers. In this research, we aims to overcome this problem with R.P.R(Relative Preference Ratio) method and suggest improved Fuzzy-AHP method which can use dissymmetric fuzzy triangular numbers.
Han Seung-Heon;Lee Young;Kim Hyung-Jin;Ock Jong-Ho
Korean Journal of Construction Engineering and Management
/
v.2
no.2
s.6
/
pp.68-80
/
2001
While opportunities for international construction firms have been growing with globalization, the risk of international construction projects is significantly increasing in severity and complexity. However, the traditional risk management approach in the construction industry has maintained a profit focus. In addition, this approach has not considered the overall risk at the corporate level, but rather has focused only on the risk of individuals at the project level. Corporate risk management should be implemented from the initial stages of new project selection. This paper suggests the Multi-criteria Integrated Systematic Analysis as a strategic decision-making tool for international construction contractors. The model integrates the multi-criteria of risk, return, and efficiency to choose the optimal set of new portfolios at the corporate level. This model also introduces the Value at Risk (VaR) concept to the international construction industry to present the total risk at the corporate level. To validate this model, this paper tested an experimental case study using the historical data of a global general contractor.
Traffic volume data have been used for the plan, the design, and the operation of highway. Since 1955, traffic survey has been nation- widely carried out at national highway and the regular survey in national highway has been conducted at the intersections of highways. However, it is critical issue to select the priority of the regular survey because it is almost impossible to conduct regular survey at all intersections of national highways. In this study, MCDM(Multiple Criteria Decision Making) using AHP(Analytic Hierarchy Process) was applied to decide the priority of the regular survey. The following standard variables for determining the priority was selected the highway plan variables[AADT, VKT, Peak Hourly Volume, Location of highway from Urban], the highway design variables[Volume(pcu), Directional Traffic Volume, Heavy Vehicle Rate], and the highway operation variables[Speed, Density, V/C]. The standard variables were quantified and normalized. Using the Eigen vector method, the weighted values of each hierarchy based on the pair-wise comparison values from the questionnaire survey were calculated. The selection of the priority of regular survey was dependent on the size of the product of the weighted values for each hierarchy and the normalized values for the standard variables. Finally, the priority of regular survey of the intersections of national highways was determined according to the order in the size of the product of two values.
Recently, the flood inundation caused by heavy rainfall in urban area is increasing due to global warming. The variability of climate change is described in the IPCC 5th report (2014). The precipitation pattern and hydrological system is varied by climate change. Since the heavy rainfall surpassed the design capacity of the pipeline, it caused great damage in metropolitan cities such as Seoul and Busan. Inundation in urban area is primarily caused by insufficient sewer capacity and surplus overflow of river. Inundation in urban area with concentrated population is more dangerous than rural and mountains areas, because it is accompanied by human casualties as well as socio-economic damage to recover destruction of roads, brides and underground spaces. In addition, various factors such as an increase in impervious area, a short time of concentration to outlet, and a shortage of sewer capacity's lack increase flooding damage. In this study, flood inundation analysis was conducted for vulnerable areas using XP-SWMM. Also, three structural flood prevention measures such as drainage pipeline construction, detention reservoir construction, and flood pumping station construction are applied as flood damage prevention alternatives. The flood data for each alternative were extracted by dividing the basin by grid. The Spatial Compromise Programming are applied using flood assessment criteria, such as maximum inundation depth, inundation time, and construction cost. The purpose of this study is to reflect the preference of alternatives according to geographical condition even in the same watershed and to select flood defense alternative considering regional characteristics.
Recently, due to global warming and climate change in Korea, local heavy storm occurs frequently. In this study, the risky areas for flooding in urban areas are analyzed for flood inundation based on two-dimensional urban flood runoff model (XP-SWMM) focusing on coastal high flood-risk urban areas. In addition, the MCDM (Multi-Criteria Decision Making) technique is utilized in order to establish the flood defense structural measures. The alternative flood reduction method are compared and the optimum flood defense measures are selected. A simulation model was used with three structural flood prevention measures (drainage pipe construction, water detention, flood pumping station). In order to decrease the flooding area, flood assessment criteria are suggested (flooded area, maximum inundation depth, damaged residential area, construction cost). Priorities of alternatives are determined by using compromise programming. As a result, the optimal flood defence alternative suggested for Janghang Zone 1 is flood pumping station and for Janghang Zone 2, 3 are drainage pipe construction.
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.3
/
pp.381-395
/
2023
This paper presents a GIS-based site suitability analysis for a smart hydrogen energy plant in the Gangwon-Do region, South Korea. A GIS-based multi-criteria decision analysis (MCDA) was implemented in this study to identify the most suitable sites for the development of smart hydrogen energy plants. The study utilizes various spatial data layers, including hydrogen generation potential and climatic conditions, environmental and topographic conditions, and natural catastrophic conditions, to evaluate the suitability of potential sites for the hydrogen energy plant. The spatial data layers were then used to rank and prioritize the sites based on suitability. The findings revealed that 4.26% of the study area, or 712.14 km2, was suitable for constructing smart hydrogen energy plants. Some regions of Cheorwon-gun, Chuncheon-si, Wonju-si, Yanggu-gun, Gangneung-si, Hoengseong-gun, and near the coastal region along the east coast were found to be suitable for solar and wind energy utilization. The proposed MCDA provides a valuable tool for decision-makers and stakeholders to make informed decisions on the location of smart hydrogen energy plants and supports the transition to a sustainable and low-carbon energy system. Decision-makers can use the results of this study to select suitable sites for constructing smart hydrogen energy plants.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.620-624
/
2004
The Construction Industry become to large. So, construction management is needed. In Korea, an organic law about construction industry was made in 1996. And CM was introduced, too. But CM is not activated with institutional inertia. A reason Is a perpetual friction between CM and Gamri. And it is not thoroughgoing enough about supply of CM's effect with Chf Best Practice checklist and Key Performance Index. This study will develop the CM Best Practice checklist with CM's work and technique in project-dimensional. The CM Best Practice checklist will guide to have a good result.
Journal of Korean Institute of Industrial Engineers
/
v.24
no.4
/
pp.627-638
/
1998
For any hazardous operation or risky project to be carried out safely and economically, it is of the utmost importance to formulate proper risk management policies based on the rational assessment of the risk levels of various potential hazards. In this paper, a Fuzzy Multi-Criteria Decision Making(FMCDM) method for risk assessment is proposed. The method evaluates, on the basis of fuzzy set theory, the risk level of a risky situation by aggregating the assessed levels of risk factors and their subjective weights. The method also allows some flexibility for the future users in the sense that, first, the relative importance weights for the three risk factors can be adjusted according to the nature of projects or systems and, second, the users have the choice between the two types of risk assessment results, that is, the assessed risk levels or the ranks of the risk situations. A numerical example for the proposed FMCDM method is provided to illustrate the computational procedure. To see how the suggested FMCDM method describes well people's perceived risk level, we compared the risk values derived from the suggested method with the subjective risk evaluations for ten risky situations.
Journal of the Korean Society for Marine Environment & Energy
/
v.13
no.2
/
pp.75-82
/
2010
The economical efficiency and easy ship building have enabled to spread FRP ships in the shipbuilding field. As waste FRP ships have been thrown away at a river or within a harbour, this matter has become issues. For the improvement of this matter, the melting technique and system of waste FRP ships was developed. But, Decision making was required for a location plan of the melting system of waste FRP ships. It's recognized that the location decision of this system is difficult due to the dependence on technical, economical, environmental factors. In this paper, we survey the primary factors of location-economic, life-environment, infrastructure and make up a question for the experts. We also calculate the important weight and related weight using Fuzzy AHP, Limiting probability method and discuss on the calculation results on the proposed sites.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.