A Real-Time Loading Strategy of Batch Processing Machines for Average Tardiness Minimization (평균납기지연 최소화를 위한 배치생산공정의 실시간 로딩전략)

  • Koo, Pyung-Hoi
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.2
    • /
    • pp.215-222
    • /
    • 2014
  • This paper provides a real-time loading strategy for batch processing machines in which a number of jobs are simultaneously processed as a batch. The batch processing machines can be seen in both manufacturing industries (e.g., semiconductor, automobile and metal working) and service industries (transportation vehicles, mail shipment and theme park). This paper focuses on batch processing machines in semiconductor manufacturing. We present a look-ahead loading strategy for tardiness minimization where future arrivals and due dates are taken into consideration. Simulation tests are performed on the presented strategy and some existing loading heuristics under various production settings with different traffic intensities and forecasting errors. Experimental results show that our strategy provides the performance of good quality.

Study on Dispatching for Quality and Productivity with estimated completion time (품질과 생산성을 위한 작업완료시간 예측을 통한 작업투입방법)

  • Ko, Hyo-Heon;Baek, Jong-Kwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.3
    • /
    • pp.1095-1100
    • /
    • 2010
  • Customer satisfaction is a main issue in the modern competitive industrial environment. So quality and productivity are the most important requisites. This paper presents a method for effective real time dispatching for parallel machines with multi product that minimizes mean tardiness and maximizes the quality of the product. In this paper, the effectiveness of the method has been examined in the simulation and compared with other dispatching methods. Using this method presented in this paper, companies can improve customer satisfaction.

A Hybrid Genetic Algorithm for the Identical Parallel Machine Total Tardiness Problem (동종 병렬기계에서 납기지연 최소화를 위한 혼합형 유전 알고리즘의 개발)

  • Choe, Hong-Jin;Lee, Jong-Yeong;Park, Mun-Won
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.624-627
    • /
    • 2004
  • 본 연구는 동일한 병렬기계에서의 총 납기지연의 합을 최소화하는 일정계획 문제에 대해 다룬다. 이 문제는 Lenstra et al. (1977)에 의해 NP-hard로 알려져 있으며, 작업의 수와 기계의 수가 큰 현실적 문제에 대해 적절한 시간 내에 최적해를 찾는다는 것은 사실상 불가능하다. 따라서 본 연구에서는 이 문제를 해결하기 위하여 혼합형 유전 알고리즘(hybrid genetic algorithm)을 제안한다. 혼합형 유전 알고리즘에서는 임의로 발생시킨 모집단에 대해 먼저 유전 알고리즘(genetic algorithm)이 세대를 진행하며 해를 개선한다. 유전 알고리즘이 일정기간동안 더 이상 해를 개선하지 못하면, 부분탐색 알고리즘(local-search algorithm))이 유전 알고리즘의 모집단의 개체들에 대해 해의 개선을 시도한다. 즉, 부분 탐색 알고리즘은 모집단 속의 각각의 개체를 초기해로 하여 모집단 내의 개체 수만큼의 부분 최적해(local optimum)들을 구한다. 이렇게 구한 부분 최적해들로 새로운 모집단을 구성하면 다시 유전 알고리즘이 진행된다. 이 과정을 종료조건에 이를 때까지 번갈아가며 반복 수행한다. 본 연구에서 제안한 유전 알고리즘에서는 Bean(1994)이 제안한 Random key 방법으로 개체를 표현하였으며 Park(2000)이 제안한 3가지 교차 연산자들을 채용하였다. 부분탐색 알고리즘을 위해서는 쌍대교환(pair-wise interchange) 방법을 통해 이웃해를 생성하였다. 선행실험을 통하여 제안한 혼합형 유전알고리즘에서 사용하는 다양한 모수(parameter)값들을 최적화하였으며 알고리즘의 성능을 비교하기 위하여 기존의 알고리즘과도 비교실험을 수행하였다.복적인 지표가 채택되는 경우를 포함하고 있다. 셋째는 추상적이며 측정이 어려운 지표를 채택하고 있는 경우이다. 여기에는 지표에 대한 정확한 정의가 이루어져 있지 않아 피 평가자가 불필요하거나 과다한 평가 자료를 준비해야 하거나 평가자로 하여금 평가 시 혼돈을 유발할 가능성이 있거나, 또는 상위개념의 평가항목과 하위개념의 평가항목이 혼재되어 구분이 모호한 경우를 포함하고 있다. 바탕으로 '생태적 합리성'이라는 체계적인 지식교육을 거쳐서, '환경정의' 의식의 제고로 이어가고, 굵직한 '환경갈등'의 상황에서 뚜렷한 정치적 태도와 실천을 할 수 있는 '생태적 인간상'의 육성으로 나아갈 수 있어야 한다는 것이 필자의 생각이다. 이를 위해서는 어찌되었건 체험학습 영역에서는 환경현안에 대한 사회적 실천을 '교육 소재'로 삼을 수 있어야 하며, 교과학습 영역에서는 한국사회의 환경현안에 대한 정치경제적 접근을 외면하지 말고 교과서 저작의 소재로 삼을 수 있어야 하며, 이는 '환경관리주의'와 '녹색소비'에 머물러 있는 '환경 지식교육'과 실천을 한단계 진전시키는 작업으로 이어질 것이다. 이후 10년의 환경교육은 바로 '생태적 합리성'과 '환경정의'라는 두 '화두'에 터하여 세워져야 한다.배액에서 약해를 보였으나, 25% 야자지방산의 경우 50 ${\sim}$ 100배액 어디에서도 액해를 보이지 않았다. 별도로 적용한 시험에서, 토마토의 경우에도 25% 야자지방산 비누 50 ${\sim}$ 100배액 모두 약해를 발생하지 않았으나, 오이에서는 25% 야자지방산 비누 100배액에도 약해를 나타내었다. 12. 이상의 결과, 천연지방산을 이용하여 유기농업에 허용되는 각종의 살충비누를 제조할 수 있었으

  • PDF

Development of Relocation Method for Construction Materials using FP-Growth (FP-Growth 기법을 활용한 건자재 재고 재배치 기법 개발)

  • Lee, Hyo-Jun;Kim, Jae-Won;Shin, Kwang Sup
    • The Journal of Bigdata
    • /
    • v.2 no.1
    • /
    • pp.49-58
    • /
    • 2017
  • The inventory location is the mos important factor which decide the efficiency of picking orders. According to the inventory location, it is possible to optimize the route for picking order, and then it makes us to expect the cost reduction and efficiency improvement. However, it is practical situation to make decisions where to keep the products based on manager's intuition and experience, not based on the systematical or analytical approach. In this research, with the practical order data of cropper product and layout for the storage yard, the association rules have found, and then the new methodology has been devised to make the decision where to keep the inventory. By utilizing the practical order data for a year, it has been proved that the proposed approach can reduce the total distance of the all routes for picking order and solve the problem of delayed delivery.

  • PDF

A Scheduling Problem to Minimize Total Tardiness in the Two-stage Assembly-type Flowshop (총 납기지연시간 최소화를 위한 두 단계 조립시스템에서의 일정계획에 관한 연구)

  • Ha, Gui-Ryong;Lee, Ik-Sun;Yoon, Sang-Hum
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.33 no.3
    • /
    • pp.1-16
    • /
    • 2008
  • This paper considers a scheduling problem to minimize the total tardiness in the two-stage assembly-type flowshop. The system is composed of multiple fabrication machines in the first stage and a final-assembly machine in the second stage. Each job consists of multiple tasks, each task is performed on the fabrication machine specified in advance. After all the tasks of a job are finished, the assembly task can be started on the final-assembly machine. The completion time of a job is the time that the assembly task for the job is completed. The objective of this paper is to find the optimal schedule minimizing the total tardiness of a group of jobs. In the problem analysis, we first derive three solution properties to determine the sequence between two consecutive jobs. Moreover, two lower objective bounds are derived and tested along with the derived properties within a branch-and-bound scheme. Two efficient heuristic algorithms are also developed. The overall performances of the proposed properties, branch-and-bound and heuristic algorithms are evaluated through numerical experiments.

A Study on Introduction of Critical Chain Project Management(CCPM) to Construction Projects (건설 프로젝트에서의 CCPM 도입에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Im Hye-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.427-431
    • /
    • 2002
  • Nowadays in Korea, there has been extreme competition due to market reduction in the domestic construction industry. As a result every company try to change rapidly to secure competitive power, Although it isn't betterment for the way of construction project management then there has many problem such as a delay of the appointed date of delivery and go over the budget. In this study, we suggest an introduction of CCPM which is based on TOC to construction projects.

  • PDF

Development of Scheduler Based on Simulation for Phone Camera Lens Module Manufacturing System (폰카메라 렌즈모듈 제조시스템을 위한 시뮬레이션 기반의 스케줄러 개발)

  • Kim, Jae Hoon;Lee, Seung Woo;Lee, Dae Ryoung;Park, Chul Soon;Song, Jun Yeob;Moon, Dug Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.23 no.4
    • /
    • pp.131-142
    • /
    • 2014
  • Phone camera lens module is assembled with a barrel, multiple lenses, multiple spacers and a shield. The major processes of manufacturing system are injection molding, coating and assembly processes, and each process has multiple machines. In this paper, we introduce a scheduler based on simulation model which can be used for frequent rescheduling problem caused by urgent orders, breaking down of molds and failures of machines. The scheduling algorithm uses heuristic Backward-Forward method, and the objective is to minimize the number of tardy orders.

A review of using Function Point for the successful project (성공적인 프로젝트 수행을 위한 FP의 활용방안 검토)

  • Hwang, In-Soo;Oh, Eun-Sung;Kim, Heung-Shik
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2002.06a
    • /
    • pp.165-172
    • /
    • 2002
  • 전통적으로 소프트웨어 프로젝트는 납기지연, 예산초과, 높은 결함율 등으로 타 산업분야의 프로젝트에 비해 매우 높은 실패율을 기록하고 있는 것으로 알려져 있다. 이 같은 소프트웨어 프로젝트의 실패원인에 대한 많은 연구결과는 소프트웨어가 갖고 있는 범위와 요구사항 정의의 어려움, 비가시성으로 인한 초기견적의 부정확성, 역시 가시성의 부족으로 진행상황파악의 어려움에 따른 진척관리의 애로, 더욱 큰 문제는 변경의 용이성과 변경에 대한 추적의 어려움 등을 지적하고 있다. 실패한 프로젝트들의 내용을 보면 대부분 계획의 부정확성이나 위험에 대한 대처의 부족 또는 진행 중 발생하는 변경에 대한 통제의 실패에서 찾아 볼 수 있다. 정확한 예측과 위험 예방 그리고 효과적인 통제대책이 소프트웨어 프로젝트를 성공으로 이끄는 3두 마차라는 지적이다. 정확한 예측의 핵은 프로젝트 산출물인 제품에 대한 정확한 규모측정에 있고, 위험 예방은 복잡도가 높거나 불확실성이 높은 컴포넌트의 자원소요에 대한 예측과 이에 대한 준비의 소홀에서 찾을 수 있으며, 효과적인 통제대책은 프로젝트 관리 프레임워크가 튼튼하지 못하거나 이의 준수를 위한 노력의 결핍에서 찾을 수 있을 것이다. 본 논문에서는 이 3두 마차 중 가장 근간이 되고 시발점이 되는 제품의 규모에 대한 예측에 초점을 맞추어 규모측정에 가장 합리적이고 객관적이며 실용성이 높다고 현재 국제적으로 높은 평가를 받고 있는 기능점수를 프로젝트 관리에 어떻게 활용해야 프로젝트를 성공시킬 수 있을 지의 방법에 대한 검토 결과를 제시고자 한다.

  • PDF

Process Improvements for Elevating Pre-outfitting Rate of FPSO (FPSO의 선행의장률 향상을 위한 생산관리 및 공법개선 사례연구)

  • Shin, Sung-Chul;Cho, Jong-Burm;Shin, Ki-Young;Kim, Soo-Young
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.46 no.3
    • /
    • pp.325-334
    • /
    • 2009
  • Generally, functional design of FPSO has been done by the engineering firm designated by ship owner. Main equipment such as topside facility is imported from abroad. But sometimes, OFE (Owner Furnished Equipment) does not satisfy the PND (Product Need Date) of each production stage because the delivery date of OFE is not scheduled to satisfy the PND. And sometimes many loose items and equipment are complex from engineering which does not consider pre-outfitting. Main objective of this study is process improvements by maximizing pre-outfitting rate in the stage of equipping STP (Submerged Turret Production), one of main equipment on FPSO. In this study, we analyzed the factors which obstructed pre-equipping STP using the past records of FPSO projects.

Surrogate Objective based Search Heuristics to Minimize the Number of Tardy Jobs for Multi-Stage Hybrid Flow Shop Scheduling (다 단계 혼합흐름공정 일정계획에서 납기지연 작업 수의 최소화를 위한 대체 목적함수 기반 탐색기법)

  • Choi, Hyun-Seon;Kim, Hyung-Won;Lee, Dong-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.257-265
    • /
    • 2009
  • This paper considers the hybrid flow shop scheduling problem for the objective of minimizing the number of tardy jobs. In hybrid flow shops, each job is processed through multiple production stages in series, each of which has multiple identical parallel machines. The problem is to determine the allocation of jobs to the parallel machines at each stage as well as the sequence of the jobs assigned to each machine. Due to the complexity of the problem, we suggest search heuristics, tabu search and simulated annealing algorithms with a new method to generate neighborhood solutions. In particular, to evaluate and select neighborhood solutions, three surrogate objectives are additionally suggested because not much difference in the number of tardy jobs can be found among the neighborhoods. To test the performances of the surrogate objective based search heuristics, computational experiments were performed on a number of test instances and the results show that the surrogate objective based search heuristics were better than the original ones. Also, they gave the optimal solutions for most small-size test instances.