• Title/Summary/Keyword: 공학전문가

Search Result 857, Processing Time 0.024 seconds

The Construction and Internal Validation of Lifelong Education ISD Model (평생교육 교수체제설계 모형 개발 및 내적 타당화)

  • Yun, Gyuwon;Kim, Moon-Seup;Kim, Jin-Sook
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.213-219
    • /
    • 2022
  • The purpose of this study is the construction and internal validation of DT ISD model that incorporates Design Thinking process into Instructional Systems Design. The study proceeded in 3 steps. Firstly, literature review was conducted to examine the process and components of Instructional Systems Design model such as ADDIE. Design Thinking models were also reviewed to determine the probability of integrating Design Thinking with ISD. Secondly, DT ISD model was constructed by adopting 3 principles of Design Thinking to ISD process. Thirdly, the internal validation research was conducted through 3 rounds delphi study and DT ISD model was finally validated by experts of instructional technology and lifelong education. DT ISD model is based upon constructionism in learning theory rather than behavioral or cognitive learning theory such as ADDIE. Hence, DT ISD model is an effective instructional design model for adult lifelong education program. It is suggested that action research is necessary to examine the external validation of DT ISD model.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

Risk-based Profit Prediction Model for International Construction Projects (해외건설공사의 리스크 분석에 기초한 수익성 예측모델에 관한 연구)

  • Han, Seung-Heon;Kim, Du-Yon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.635-647
    • /
    • 2006
  • Korean construction companies first advanced to the international markets in 1960's and so far have brought more than 4,900 projects which account for 193 billion dollars approximately. With the large increase of national employment and income being followed by the achievement, Korea's construction industry has made an enormous contribution to the improvement of domestic economy for the last 40 years. However, recently the increased risk in international markets as well as the sharpening competition with foreign companies promising in terms of advanced technologies and low labor cost have been driving Korean construction away from the market shares. According to ENR (Engineering News Record, 1994~2003), it is revealed that 15.1% of top 225 global contractors are suffering from loss in international construction markets. This phenomenon is largely due to the highly uncertain characteristics of international projects, which are inherently exposed to various and complicated risky situations. Furthermore, especially for Korean construction companies, it is often the case that the failure in an international construction project cannot be offset by even a sufficient number of successful domestic achievements. Therefore, not only the selective screening among the nominated projects which have strong possibility of collapse but the systematic strategies for controlling potential risk factors are also considered indispensable in international construction portfolio management. The purpose of this study is to first analyze the causal relationships of the profit-influencing variables and the project success, and develop the profitability forecasting model in international construction projects.

Analysis of Efficiency of Suction Board Drain Method by Step Vacuum Pressure (단계석션압 조건에 따른 석션보드드레인 공법의 효율 분석)

  • Kim, Ki-Nyun;Han, Sang-Jae;Kim, Soo-Sam
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6C
    • /
    • pp.321-329
    • /
    • 2008
  • In this study, a series of column test as a way in order to make up for the weakness point of the conventional acceleration method were conducted to both propose the suction board drain method and grapes the specific improvement character of this method as a result of a sort of plastic drain board and a phase of vacuum pressure conditions. On this occasion, the study focused on computing the effective factors of the fittest Suction board drain method affected by each condition through confirming the settlement generated during the test, the water content reduction and stress increase effect occurred arising from the test, and the ratio of consolidation related to the improvement period. In accordance with the shape of core and that whether the core is attached to the filter(pocket or adhesion), the castle type of adhesion and the column type of pocket are more efficient than the others as a consequence of the test to find out the improvement effect depending on each drainage such as a castle type, coil type, harmonica type, column type of pocket and a castle of the adhesion. In case of the step suction pressure, the shorter the period of $-0.8\;kg/cm^2$ as a final step of the suction pressure is, the better the improvement is. In addition, the correlation between degree of consolidation per each suction pressure level and duration of application was drawn as a curve and the point of inflection on this curve was provided to determine the duration period to maximize the consolidation.

Appropriate Roles of Project Participants for Public Partnership Projects of Railways through the Organizational Behavior Theory (조직행동론을 통해서 본 민간철도 투자사업의 참여자간 갈등유형 및 역할정립 방안에 관한 사례연구)

  • Kim, Byungil;Yun, Sungmin;Han, Seung Heon;Kim, Hyung Hwe
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.839-847
    • /
    • 2008
  • No proper system exists for private investment projects, and efficient project management is not being achieved due to entanglements of management. Recognizing these circumstances, this paper has diagnosed the hard facts that project management organizations and systems are facing, and presented solutions to the factors that are obstructing the establishment of efficient project management system. This paper carried out focus group interviews on the experts who had participated in the Incheon International Airport Railway construction project, using the methodology of an exploratory case study. The results were systematically analyzed according to organizational behavior and causes corresponding to each of the problems were deduced. Private investment projects were divided into task environments and project organizations based on social science methodology and analyzed, and a final improvement plan for each participating organization was presented. An improvement plan was presented, and it was compared with the case study of Incheon bridge construction project, which is recognized as a model of successful project management, and its appropriateness evaluated.

A Study on Ways to Improve Hub-Airport Competitiveness Through Forming Economy Zone: Focus on the Incheon International Airport (공항 경제권 형성을 통한 허브 경쟁력 향상 방안에 대한 연구: 인천국제공항을 중심으로)

  • Seungju Nam;Junhwan Kim;Solsaem Choi;Yung Jun Yu;Jin Ki Kim
    • Information Systems Review
    • /
    • v.24 no.2
    • /
    • pp.21-40
    • /
    • 2022
  • The purpose of this study is to find factors that Incheon International Airport should focus on and improve in order to have hub-competitiveness through economic zone centered on airport. Text analytics was conducted on online review written by passengers who used world class transit airport to derive environmental factors. After that, we select 15 major factors among the derived environmental factors based on the previous studies. This study used IPA analysis for experts in aviation field to investigate the importance and performance of the factors. Results showed that performance was evaluated to be lower than importance in all factors, and accessibility(convenience, diversity, cost and time), free economic zone and various shopping facilities were top 3 factors to be specifically improved. This study is meaningful in that it can understand passengers' perceptions by using the advantages of text analysis and surveys method. The result of study can be used to establish policy and strategic directions to solidify the position of hub airports in the future.

A Study on the Verification of Sales Price Factors in Residential Building Development by Using Correlation Analysis (상관분석을 통한 공동주택 개발사업의 분양가 산정 요인 도출연구)

  • Son, Seunghyun;Lee, Jaehyeon;Son, Kiyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.45-52
    • /
    • 2024
  • Estimating the sales price of a residential building development project is difficult because of it has many complex variables such as location, environment, and economic conditions. Many previous studies related to influence factors of the sales price is to identify by survey of experts and it is few studies by comparing with actual sales price. Accordingly, the purpose of this study is to identify the factors influenced on the projects by using correlation analysis from collected actual data in this study. For the purpose, first, the factors such as economy, location, housing, financial environmental factors were identified from previous studies. Second, data were collected on actual sale prices and selected factors. Finally, the actual sales price and factors were compared and analyzed by using correlation analysis. As a result, the R2 values of economy, location, housing and financial environmental factors were over 0.5 respectively. Therefore, it was confirmed that these factors were significantly correlated with actual sales price. The results of this study are expected to be utilized as basic data for research and development of a new sale prices prediction model.

A Study on Criteria for the Credit Approval of Nationally Authorized Civil Qualifications (국가공인 민간자격 학점인정 기준에 관한 방안 연구)

  • Shin Myong-Hoon;Park Jong-Sung
    • Journal of Engineering Education Research
    • /
    • v.7 no.2
    • /
    • pp.5-21
    • /
    • 2004
  • The study aims to propose plans to give credit approval to those who obtain authorized civil qualifications, in accordance with the enforcement regulations under the Clause 7, Article 4 of $\ulcorner$the law on credit approval and others$\lrcorner$. Preceding studies on the grounds and principles of credit approval, analyses on the related references and materials, and surveys asking the managers of authorized civil qualifications their opinion over giving credit approval to authorized civil qualifications were conducted as the methodology of this study. Besides, a conference inviting experts from the relevant fields was held to specifically overview the contents and levels to be examined by qualification items, to conduct a face-to-face survey on directions to take in the credit approval of authorized civil qualifications, and to analyze the level and the degree of the difficulty of questions in the examinations of authorized civil qualifications. The contents and the level of credit approval in this study are as follows. For the authorized civil qualification items unable to formulate criteria in accordance with the principles of credit approval taken in the national technique qualification and other national qualifications, two factors were put under consideration for setting the level of the credit approval. First, the level and scope of work were investigated. Second, the content of qualification was compared with the course work of college. The degree of difficulty in the scope and performance of work was reviewed by specialized qualification and general qualification, respectively. Specialized qualification indicates whether or not the required knowledge and technique are acquired for performing duty in specific work fields. It falls into service fields and qualification items except qualification items on general clerical work of the national technique qualification and other national qualifications. To the contrary, general qualification is to prove the degree of acquisition of knowledge and technique for improving the basic competencies throughout diverse types of occupations. It includes competencies to verify language proficiency, mathematical and statistical capacity, problem settlement, negotiation and communication skills. When the authorized civil qualification came under the specialized qualification, the level of qualification was determined in comparison with the level of work of national qualifications. In the case of the general qualification, the credit to be approved was settled by conducting a comparative analysis on the course work of college.

A study on applying specialized vocational high schools program and development of Gyeonggi innovative education project (경기 혁신교육지구 사업의 발전방향과 특성화(전문계)고 프로그램적용 방안연구)

  • Chang, Eun-Young;You, Hyung-Jin
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.3 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • In this paper, as a new educational cooperation model, seeking the problems and the directions of progress on GPOE(Gyeonggi Provincial Office of Education)'s innovational education district project, recognizing the various points of issue of SVHS(specialized vocational high schools) faced now, suggesting the contents and standards of the program as measures of enhancing competitiveness of SVHS, analyzing the strengths and weaknesses of project of innovational education district and finding the plans for progress. According to the result of the advanced study and analysis, it shows that the aid as well as the supporting object of helping the SVHS's students find a job don't reach a certain level. As the aid supports across the general elementary and secondary schools, it tends to show much more emotional software-based support required by elementary school, middle school and general high school as universal education welfare rather than hardware-based support required by SVHS. Despite the competent evaluation on the survey about the supporting method from SVHS's parents teachers and students, the survey includes that teachers who ask the balancing support are increasing, some students suspect its effect of education and some parents as a residential position ask the regional growth rather than education So there are a lot of confusions among the teachers, students and parents yet. To overcome these problems, we ensure the internal stability of local education community and GPOE and local government get out large scale constructions with trust and belief to make a revolution of public education in supporting the administrative task and finance and to accomplish the program that best suits our SVHS's state to be supported without dividing educational software and hardware, should reflect the demand of field by for expert group being built and attended when build the local revolution community. Also plan to make full use of local human and property infrastructure should be added. To this end, as programs to build a pool of guest lecturers are provided to teachers who carry out innovative education programs, we seek the reformations to give students opportunities to widen participation in other school programs.

  • PDF

A Study on Measures to Strengthen National Authorized Qualification (국가공인 민간자격 활용성 강화 방안 연구)

  • Kim, Sang-Jin;Park, Jong-Sung;Jung, Hyang-Jin
    • Journal of Engineering Education Research
    • /
    • v.12 no.1
    • /
    • pp.3-16
    • /
    • 2009
  • The purpose of this study is to prepare diverse measures to enhance the utilization of national authorized qualification. The detail objectives of this study are first, to re-establish the utilization scope and range of national authorized qualification through analysis of advance research and theory in various fields of learning on the function of qualification; and second, to set the direction to strengthen the utilization of national authorized qualification. Based on discussions on the various fields of learning on the function of qualification, this study divided the utilization scope of qualification into personal utilization for the benefit of the qualification acquirer him or herself and public utilization for the social and economic benefits. And according to this distinction, we prepared measures to strengthen the utilization of national authorized qualification. First of all, as a way to strengthen personal utilization of the national authorized qualification, we prepared measures to enhance accessibility and facilitate further improvement. As a means to enhance accessibility, we proposed restriction on setting the application condition, diversification of qualification authorization method, facilitation of partial qualification system and minimization of expense required to acquire qualification. Also for the further improvement, we proposed creation of job-level centered grade system and development of job-level centered qualification item by stage. For strengthening the public utilization of national authorized qualification, we come up with ways of strengthening flexibility, transparency, public trust and compatibility. As a way to strengthen flexibility, we proposed establishment of qualification demand monitoring system, expansion of direct participation of users on qualification management, establishment of qualification expiration period and its renewal. For the strengthening of transparency, we proposed to build general qualification information system and to utilize qualification recommendation system. To strengthen public trust, we proposed to strengthen the management of qualification management regulation, secure independency, establish internal audit system and strengthen post management of national authorized qualification. And lastly, we suggested that compatibility comparison standard between qualification and qualification level standard be developed for the strengthening of compatibility.