• Title/Summary/Keyword: 공정-내역 연계

Search Result 7, Processing Time 0.02 seconds

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

Development of Supporting tool for WBS-based cost (작업분류체계 기반 공사비 작성을 위한 지원도구 개발)

  • Yoon, Hoi-Su;Moon, Jin-Suk;Kim, Seong-Jin;Han, Chung-Han
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1430-1432
    • /
    • 2011
  • 공사비정보와 일정정보는 사업을 관리하는데 있어 매우 중요한 정보로 이들이 연계활용되어야 공정공사비 관리를 원활하게 진행할 수 있다. 그러나 국내의 실정은 공사비가 내역체계 기반으로 관리됨에 따라 설계사에서 작성되어 시설, 부위, 공간 등의 정보를 갖고 있던 수량정보가 내역체계 기반으로 전환되면서 정보들을 상실하고 시공사에서는 다시 물량분개라는 작업을 통해 다시 시설, 부위, 공간 등의 정보를 부여하는 작업이 발생하고 있다. 이에 도로분야 사업을 대상으로 작업분류체계(WBS)를 그 연계방안으로 제시하고 작업분류체계 기반 공사비 작성을 통해 설계사에서 작성된 정보를 시공사에서까지 활용할 수 있도록 하고자 한다. 본 사업에서는 이러한 작업분류체계 공사비 작성을 위한 지원도구 개발을 위해 업무 프로세스 검토, 지원도구 활용 공사비 작성, 시험적용을 통한 지원도구 검증을 수행할 계획이다. 이를 통해 내역정보와 공정정보의 연계가 실현되고, 효율적인 공사비 관리의 기반을 제공할 수 있다.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.