• Title/Summary/Keyword: 공정 리스크

Search Result 80, Processing Time 0.031 seconds

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

A Study on the Risk Evaluation of Apartment Development Project based on VE (VE기반 공동주택 개발사업 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Shin, Seog-Bae;Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.14-25
    • /
    • 2009
  • Development work of apartment houses is a complex medium-and long-term project requiring grand resources and work force. Since in combination inner and outer project variables relate to project output, uncertainties caused by not only a given site condition but also politic, economy and social sectors are generated during the project. These risks influence output of the project as important factors, and ultimately as management variables in priority giving an effect on earnings and the financial structure of enterprises they should be manageable with the risk reduction plan. In this point of view, this study focused on development work of apartment houses among construction project. Risky factors were deduced, analyzed and evaluated based on Value Engineering from planning to designing to executing to maintaining. Eventually, this study showed the foundation guaranteeing competitive power of public and private construction sectors.

Risk Factors Analysis and Quantitative Risk Assessment Model for Plant Construction Project (플랜트 건설 리스크 분석 및 리스크 정량화 모델 개발에 관한 연구)

  • Ahn, Sung-Jin;Kim, Tae-Hui;Nam, Kyung-Yong;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2019
  • Due to the increasing demand for and complexity of plant construction projects, unpredictable risk factors are on the consequent increase. For that reason, the quantitative risk analysis is being called for, in order for the development of a risk assessment model using risk indicators for the plant construction projects. This study used the claim payout data collected at a global insurance company to reflect the actual financial losses in plant construction projects as dependent variables in the risk assessment model. In terms of independent variables, the geographic information, i. e., landform, and the construction information including test-run, schedule rate, total cost and duration are adopted. In addition, this study suggests that the regression model containing such independent variables that are statistically significant can be applied to as a foundational guideline for the plant construction project risk analysis during the phase of construction and commissioning.

Development of Cost Estimation Model Considering Process Risk for Asbestos Dismantling Work (석면해체 공사의 공정 리스크를 고려한 비용 산정 모델 개발 )

  • Noh, Jae-Yun;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.49-50
    • /
    • 2023
  • Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.

  • PDF

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

Removal of pharmaceuticals in biologically treated sewage with $O_3$ and advanced oxidation processes (오존 및 고도산화처리에 의한 하수 2차 처리수중의 의약품류 제거)

  • Kim, Il-Ho;Tanaka, Hiroaki;Song, Ho-Myeon;Joo, Jin-Chul;Ahn, Chang-Hyuk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.137-137
    • /
    • 2011
  • 급격한 세계인구의 증가에 의해 물 부족지역이 세계 각지로 확산되고 있다. 이에 따라, 건전한 수자원으로써 하수처리수의 재이용이 주목을 받고 있다. 하수처리수의 재이용시에는 특히, 재이용수의 미생물학적 안전성과 더불어 화학물질 등으로부터 기인할 수 있는 인체 및 생태계에의 리스크를 고려해야 한다. 미국 EPA는 병원성 미생물 뿐만 아니라 화학물질에 대한 안전성을 확보 차원에자외선/과산화수소 등의 고도산화처리법을 검토하였다. 1일 $10m^3$ 처리규모의 연속실험장치를 이용, 검토된 공정별 실제 하수 2차 처리수중에 존재하는 의약품류의 제거효과, 에너지 소비량 및 생태리스크 저감효과 등을 비교, 평가하였다. 에너지 소비량에 있어서는 공정별로 다소 차이가 있었으나, 본 실험동안 검출된 38종의 의약품류 제거에는 각 공정 모두 매우 효과적이었다. 에너지 소비측면에서는 오존 단독공정이 가장 적은 에너지 소비량에서 타 공정과 동일한 수준의 의약품류 서 막처리나 자외선 처리 등의 고도처리시설에 대한 정보를 재이용수 가이드라인에 제시하고 있는 반면, 우리나라에서는 재이용수중에 일정농도 이상의 염소가 잔류하도록 함으로써, 재이용수의 미생물학적 안전성 확보만을 고려하고 있다. 최근, 수환경분야에서는 의약품류라는 화학물질이 유럽, 미국 및 일본 등지를 중심으로 주목을 받아오고 있으며, 이들은 ng/L-${\mu}g$/L 수준으로 수환경중에서 검출되고 있다. 이들의 주요 발생원으로 하수처리시설이 지목되고 있으며, 따라서 하수처리수의 재이용시 잔류 의약품류에 의한 리스크 발생 가능성이 우려되고 있다. 이를 배경으로, 하수처리시설에서 의약품류를 효과적으로 제거할 수 있는 공정으로 오존 및 오존/자외선, 제거효과가 얻어졌다. 한편, 오존처리시 발암성 물질인 브로메이트($BrO_3^-$) 등과 같은 부생성물 생성 가능성을 고려하면, 오존 단독공정보다 상대적으로 많은 에너지를 소비하는 오존/자외선, 자외선/과산화수소 등의 고도산화처리법이 높은 적용성을 갖는 것으로 나타났다. 향후, 수자원 부족문제로 재이용수의 용도가 훨씬 다양해 질 것으로 예상된다. 그에 따라, 재이용수의 안전성 확보를 위해 보다 폭넓은 검토가 예상되지만, 현 단계에서는 오존을 포함, 다소 많은 에너지 소비가 예상되는 자외선을 이용한 고도산화처리법이 다양한 미량 화학물질의 제거에 유효한 공정으로 판단된다.

  • PDF

Analysis of Potential Construction Risk Types in Formal Documents Using Text Mining (텍스트 마이닝을 통한 건설공사 공문 잠재적 리스크 유형 분석)

  • Eom, Sae Ho;Cha, Gichun;Park, Sun Kyu;Park, Seunghee;Park, Jongho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.91-98
    • /
    • 2023
  • Since risks occurring in construction projects can have a significant impact on schedules and costs, there have been many studies on this topic. However, risk analysis is often limited to only certain construction situations,and experience-dependent decision-making is therefore mainly performed. Data-based analyses have only been partially applied to safety and contract documents. Therefore, in this study, cluster analysis and a Word2Vec algorithm were applied to formal documents that contain important elements for contractors or clients. An initial classification of document content into six types was performed through cluster analysis, and 157 occurrence types were subdivided through application of the Word2Vec algorithm. The derived terms were re-classified into five categories and reviewed as to whether the terms could develop into potential construction risk factors. Identifying potential construction risk factors will be helpful as basic data for process management in the construction industry.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.