Performance Index Analysis of Schedule Introducing EVMS (EVMS를 도입한 공정의 성과지수 분석)

  • Kim Young;Lee Young-Dae;Kim Sung-Hwan;Kim Jung-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.456-459
    • /
    • 2002
  • It is lately issued studies on EVMS(Earned Value Management System) throughout construction industry, which is management system integrating cost and schedule effectively. So identifying importance and circumstance of introducing EVMS, CPI(Cost Performance Index) and SPI(Schedule Performance Index), which are critical components on schedule introducing EVMS, calculate and it intends to analyze the trend and problem of cost and time throughout project management, applying various statistical data analysis method.

  • PDF

A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk (비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발)

  • Kim, Seon-Gyoo;Park, Kyoo-Young;Yu, Young-Jeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 2009
  • Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

On the asymptotic correlationship for some process capability indices Ĉp, Ĉpk and Ĉpm (공정능력지수 Ĉp, Ĉpk와 Ĉpm를 위한 점근적 상관성에 관한 연구)

  • Cho, Joong-Jae;Yu, Hye-Kyung
    • Journal of the Korean Data and Information Science Society
    • /
    • v.24 no.3
    • /
    • pp.465-475
    • /
    • 2013
  • Higher quality level is generally perceived by customers as improved performance by assigning a correspondingly higher satisfaction score. Usually, the quality level is measured by process capability indices. The index is used to determine whether a production process is capable of producing items within a specified tolerance. Some useful process capability indices $C_p$, $C_{pk}$ and $C_{pm}$ have been widely used in six sigma industries to assess process performance. Most evaluations on process capability indices focus on point estimates, which may result in unreliable assessments of process performance. It is necessary to investigate their asymptotic correlationship among process capability indices $\hat{C}_p$, $\hat{C}_{pk}$ and $\hat{C}_{pm}$. In this paper, we study their asymptotic correlationship for some process capability indices $\hat{C}_p$, $\hat{C}_{pk}$ and $\hat{C}_{pm}$ under the normal process.

A Study On the Predicting Method of the EAC according to the Performance Index of Construction Projects (건설공사 수행에 따른 최종공사비 예측방법에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.105-112
    • /
    • 2002
  • The EVMS(Earned Value Management System) comes from C/SCSC which was first released by the United States Department of Defense in December 1967, and preyed very powerful and efficient project management tool from a lot of practices. Although it is an excellent tool, we can not be succeed appling foreign system due to the differences of construction culture and law between the Korean and US construction industries. EAC(Estimate at Completion) is one of the most important functions in the EVMS. The purpose of this study is to propose the improved EAC method according to the performance indices better than old that and to prove from examples. In advance, the improved EAC method is to estimate more exactly costs and to promote efficiency in construction projects.

The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project (공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법)

  • Lee, Youn-Mi;Lee, Man-Hee;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.274-277
    • /
    • 2006
  • The EAC(Estimate at Completion) among existing methods, which estimate cost and time effectively, help managers anticipate changeable several results at the point of $15{\sim}30%$ in the project progress. However, this method may cause such some problems as not to consider the periodically changing circumstances caused by construction risks or uncertainties which can affect the cost and time in the project, and to regard collected and accumulated data only as a single value when predicting the results on the progress. Accordingly, it is very difficult to accept the even small range of variability based on the anticipation of EAC. Consequently, the study focuses on the possibility methodology to anticipate time and cost accurately on the way to utilize EVMS(Earned Value Management System), and also suggest the way to perform the right estimation of EAC as considering various risks and uncertainties in construction projects.

  • PDF

A Study of Learning Organization Model of Construction Organization based the CoP(Community of Practice) (Community of Practice(CoP)를 기반으로 하는 건설조직의 학습조직 모델에 관한 연구)

  • Lee Tai Sik;Lee Won Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.479-482
    • /
    • 2001
  • Construction industry included speciality compare with others industry. Systemically approach and enterprise cultural approach is required in order to perform Knowledge Management in construction industry. But, most of construction enterprise immersed in system approach to perform Knowledge Management, in this reason caused failure of Knowledge Management. To resolve the structural contradiction, Learning organization based the Community of Practice(CoP) is studied in this paper.

  • PDF

Calculating the h-index and Its Variants Considering the Number of Authors in a Paper (공저자 수를 고려한 h-지수 산출)

  • Lee, Jae Yun
    • Journal of the Korean Society for information Management
    • /
    • v.33 no.3
    • /
    • pp.7-29
    • /
    • 2016
  • The h-index is a popular bibliometric indicator for evaluating individual researchers. However, it has been criticized for its inconsistency with reflecting increased number of citations and disregarding the number of co-authors in a paper. In order to overcome these problems, we examined the g-index and other Hirsch-type indices considering the number of co-authors. Test data collection was extracted from Korean Citation Index database published from 2004 to 2013. The results of this study are as follows: First, g-index is more reliable indicator than h-index with consistency. Second, number of co-authors must be considered to maintain the h-index as an complex indicator applying the quality and the quantity of research performance. Finally, hc-index and gc-index, with fractionalised counting of the papers, can fairly measure the research performance of humanities researchers, and successfully prevent specific disciplines or institutions occupying majority of top rankings.

A Study for Verification of the Performance Index Model of EVMS in Credible Interval (신뢰구간상에서 EVMS 성과지수모델의 검정에 관한 연구)

  • Kang Byung-Wook;Lee Young-Dai;Park Hyuk;Chun Yong-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.478-481
    • /
    • 2002
  • In these days, Cost and Scheduling was managed effectively because of introduction of EVMS to construction project. However the EVMS is appropriate methods to advanced country, so it is difficult to apply into domestic construction project. in this paper weighted value n, m was used of compositive index(CI) to forecast Estimate At Completion (EAC) using statistical analysis in credible interval the objective of this paper is to verify compositive index(CI) and to forecast Estimate At Completion (EAC).

  • PDF

A Study of the Best Performance Index for Estimate at Completion Forecasting Model on the Earned Value Management System(EVMS) (EVMS 최종공사비 예측 모델 최적성과지수에 대한 고찰)

  • Kim Seon-Gyoo;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.101-107
    • /
    • 2000
  • On 1 July, 2000, the Ministry of Construction and Transportation announced the Earned Value Management System(EVMS) will be applied in public sector soon. However the arguments over the EVMS applied to our unique construction environment still exist and create strong concerns and worries among some experts it would be another mistakes proposed by the government. We do know the EVMS comes from C/SCSC which was first released by the United States Department of Defense in December 1967, and proved very powerful and efficient project management tool from a lot of practices. Although it is an excellent tool, we can not ignore our many experienced failures appling foreign system due to the differences of construction culture and law between the Korean and US construction industries. The purpose of the EVMS's success in Korea, therefore, this paper tests and proves the EVMS's adaptability and credibility to our construction environment by EAC model, that is one of the most important functions in the EVMS, using very scare EV data of the Korean construction projects.

  • PDF