• Title/Summary/Keyword: 공사현장정보관리

Search Result 255, Processing Time 0.027 seconds

Development of Construction Site Monitoring System Using UAV Data for Civil Engineering Project (UAV를 활용한 토목공사 현장 모니터링 시스템 개발에 관한 연구)

  • Jeong, Juseok;Han, Seonju;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.41-49
    • /
    • 2017
  • The ordering organizations of civil engineering project manage the construction site indirectly because the construction site is mostly located at a remote location and the public official also manages many sites. Since the civil engineering project has a wide working area, it is not easy to know the status of the whole project quickly by the indirect management method by report of the field practitioner. In order to solve these problems, the field management system between the ordering organization and the field office is changing from offline to online. This study suggests an advanced construction site management system that obtains site-related 3D information with the use of UAV and shares the information between the construction site in remote locations and their supervising authorities. To develop an UAV application system, the problems of field management in many actual sites were analyzed and derived necessary functions such as status reporting and online information management. The developed system was applied to actual field to verify its usability and compared the efficiency improvement with existing field management method.

Automation of Construction Management System for Bridge Construction Site (교량 건설현장의 시공관리 자동화 기술 연구)

  • Lee, Kee Sei;Choi, Jun Ho;Jiang, Meiling;Kang, Young Jong
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.164-164
    • /
    • 2011
  • 최근들어 교량 건설 프로젝트는 그 규모가 방대해 졌을 뿐만아니라, 건설에 사용되는 장비 및 자재, 인력의 종류 또한 다양해 지고 있다. 이에 따라 종래 구조적 안전만을 추구하던 건설현장은 이러한 제반 요소들을 효율적으로 관리하여 경제성뿐만 아니라 시공의 효율성 까지 고려할 수밖에 없게 되었다. 따라서 건설 현장의 진도 및 자재, 인력관리는 현대 건설 산업의 주요 과제라 할 수 있다. 이에 따라 본 연구에서는 현장의 시공정보를 무선으로 송신할 수 있는 단말기 및 RFID를 이용하여 종래에 시행되던 작업을 자동화함으로써 작업의 편리성을 도모하고 이를 통하여 시간과 인력의 낭비를 줄일 수 있는 시공관리 시스템에 대한 모듈을 제안 하였다. 제안된 시스템은 3D모델을 기반으로 하여 진도 및 공비를 한눈에 알아볼 수 있는 방안을 제시한다. 사용자는 현재 진행되고 있는 공정을 3차원 모델에서 확인할 수 있으며, 현재까지 사용된 비용 및 공정률을 손쉽게 확인할 수 있다. 3D모델은 공사 시작 전 공정에 맞추어 분절된 형태로 제작되어 현장에서 송신한 위치정보가 통합관리 시스템에서 수신되면 해당 새그가 화면에 나타나게 된다. 3D모델은 공정시각화의 역할을 할 뿐만 아니라 각 새그에는 사용된 자재의 종류나 수량등이 DB화 되어 있어, 실시간으로 공사에 사용된 물량을 산출 할수 있도록 한다. 시공정보의 수신은 각 자재에 부착한 RFID태그를 직접 읽어서 송신하거나, 작업자가 시공상황을 단말기를 통하여 직점 송신함으로써 이루어지게 된다. 수집된 시공정보는 3D모델과 연계됨과 동시에 통합관리 시스템에 내장된 DB와 연결되어 사용 자재 및 물량에 대한 비용산출에 중요한 역할을 하게 된다. 현재 우리나라의 교량 시공 현장에서는 기성청구시 내역서를 기준으로 비용을 산정하게 되는데, 시공관리 통합 프로그램에서는 각 공정이 DB화된 내역서와 연계되어 3D모델에서 얻어진 물량으로 공비를 산출하는 과정이 자동으로 이루어지게 된다. 이러한 과정은 단일 현장뿐만 아니라, 공구 내의 여러 교량 현장에 대하여도 적용이 가능하므로, 방대한 현장의 공사관리에 소요되던 시간과 노력을 절감 할 수 있다. 본 연구를 통하여 현장에서 이루어지는 공사관리 작업에 대해 IT기술을 접목하여 자동화 할 수 있는 방법에 대한 알고리즘을 제시하였다. 이는 모바일 오피스 및 단말기를 이용하여 현 공정까지 사용된 물량, 인력, 장비 정보를 관리하는 한편, 현재까지 진행된 공사 내용을 3D모델을 통하여 한눈에 알아볼수 있는 교량 건설현장 통합관리 시스템의 모듈을 제공한다. 이에따라 공무 작업에 소모되는 인력 및 시간을 크게 절약 할 수 있을 것이라 판단된다.

  • PDF

An Elective Multi-Project Management for the Small and Medium-sized Construction Companies - Focused on the Planning and Scheduling - (중소건설업체의 다중현장관리를 위한 공사관리업무의 효율화 방안 - 공정관리업무를 중심으로 -)

  • Choi Kwang-Hee;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-510
    • /
    • 2002
  • As the Scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened at site and reported to the head office. To simultaneously control the individual or large number of sites in large number of construction information, the necessity of making extract the important point of the information and the board of director's making a suitable decision to support the fields is increased. Also, as driving the construction industry to be informative, efficiently aggregating the information created in fields, efficiently making decision and controlling the construction work is increased the importance of the company's competitiveness factor. To simultaneously control multi-construction sites in the small and medium size construction firms define the fundamental and core information factor which needed in the head office and suggest the appling method.

  • PDF

Development of a Demolition Construction Risk Assessment Manual (해체공사 위험성평가 매뉴얼 개발 연구)

  • Hyung, Sung-Han;Jang, Won-Jun;Lee, Moon-Bae;Moon, Yoo-Mi
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.93-94
    • /
    • 2023
  • 해체공사는 작업의 특성상 단기간에 이루어지며, 해체공사 현장에 투입되는 근로자는 일용직 근로자가 대부분으로 안전사고의 비율이 높다. 사업장 위험성 평가에 관한 지침에는 위험성 평가시 근로자를 참여토록 하고 있으나 해체현장의 특성상 근로자가 참여한다고 하여도 위험요소를 파악할 역량이 부족할 따름이다. 또한 기존의 해체공사 안전관리 매뉴얼은 구조안전성 확보를 위한 매뉴얼로 해체 근로자의 안전을 위한 매뉴얼은 없는 실정으로, 근로자의 안전을 확보하기 위한 위험성 평가 매뉴얼이 요구되고 있다. 이에 본 연구에서는 건설공사 안전관리 종합정보망(CSI)의 해체 및 철거공사의 사고사례를 분석하였으며, 해체 및 철거 사고시 발생한 주요 위험요소를 도출하여 작업 공종별로 유해·위험요인의 파악을 손 쉽게 할 수 있도록 하였다. 또한 해체 현장 규모에 따라 대규모 현장은 빈도·강도법, 중·소규모 현장은 체크리스트법을 활용하여 위험성을 결정하고 감소대책을 수립할 수 있도록 매뉴얼을 구성하였다. 잔여 위험에 대해서는 관리카드를 만들어 해체공사 완료시까지 관리하도록 하였다.

  • PDF

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.

  • PDF

Implementation of Ubiquitous-Based Construction Site Management System (유비쿼터스 기반 건설현장 관리시스템의 구현)

  • Yeon, Sang-Ho;Lee, Young-Wook
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.2
    • /
    • pp.239-244
    • /
    • 2013
  • A ubiquitous-based construction site management system coupled with construction processing status of a 3-D spatial information and sensor network for construction site management is implemented. The service of such management system is able to save efforts and times to check the processing status of construction sites and more the related construction staff in charge can receive the real time information of construction field or the related information can be transmitted to the office where the construction staffs in charge are. Especially we can provide on a mobile smart phone of real time processing status at construction field and environmental information of such temperature, humidity, information of GPS, etc. which are able to affect the construction status. In addition, construction processing and design modification etc. as well as necessary informations are able to be helped and provided at any time and to any place.

Construction Information Management Using Information Technology (IT기술을 이용한 건설 정보관리 효율화 방안)

  • Ha Yong-Ho;Yu Seung-Hoon;Youn Hak-Joong;Lee Se-Jun;Kim Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.513-518
    • /
    • 2001
  • In recent years, construction information management systems using Information Technology(IT) have been developed in the construction industry. Construction information management plays a significant role in successful project implementation and completion. However, there have been a number of problems in current practice that manually collects and utilizes construction information generated in site. This paper mainly describes a new approach which is able to gather, manage, and accumulate the construction information in real-time using IT tools such as PDA, barcode, RFID, biometrics identification and digital camera. It first reviews the existing applications and their limitations, and potential IT tools for construction data collection and management. It then proposes a utilization method of IT tools for an effective information management in domestic construction site. Conclusions and future research works are also made in this paper,

  • PDF

Building Underground Facility Management System of Power Transmission and Power Distribution using GIS (지리정보체계를 이용한 송배전 지하시설물관리시스템 구축)

  • Jang, Yong-Gu;Kang, In-Joon;Kim, Sang-Seok;Yang, Seung-Tae
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.7 no.2
    • /
    • pp.69-77
    • /
    • 2004
  • Now, there are some problems to manage underground facilities in domestic. Specially, in the case of KEPCO(Korea Electric Power Corporation), it is so difficult to manage electronic line more stably and detailedly because the geographic information and attribute information being built is not easy to be updated in the field. KEPCO officials who are accompanying management and supervision in earthwork do not have sufficient knowledge and information about GIS but they grasp the information of geography and property which coincide with the field. Therefore they have to refer their business analysis contents sufficiently for more efficient lines management in the KEPCO, but it is problem that the existing information of electronic lines management system is not. In this study, we constructed power transmission and power distribution underground facility management system for the user to manage and maintain underground facilities more easily and safely using the information of geography and property about power transmission and power distribution underground facility which have been built by KEPCO.

  • PDF