Korean Journal of Construction Engineering and Management
/
v.3
no.1
s.9
/
pp.83-90
/
2002
Actual construction data are unsystematically handled and uselessly hoarded after completion of the project although actual construction data can be applied to the various works of the future projects. Many researches have been carried out by several engineers and scholars of construction firms and research institutes, but the level of the application is not plausible yet. The objective of this paper is to propose a web-based data model and application system for commercial buildings in order to enhance the usability of the actual construction data on line. The principal factors of commercial building project data and the user$^{\circ}{\phi}s$ requirements in various areas, such as planning, design, procurement and construction and so on are analyzed to implement the database structure of the proposed system. The application of resource Information focused on cost, manpower, equipment is included in the system, which is expected to enhances the usability of actual database application system compared with other researches proposed so far.
해외 발전사업의 기술 경쟁력 우위 선점을 위해서는 발전시스템에 대한 최적설계기술 및 발전소 운영 기간 중 최소 비용으로 높은 신뢰도의 설비 관리, 최적 성능 유지를 할 수 있는 O&M 관리 기술이 필요하다. 전력연구원은 해외발전사업 전주기 기술지원을 위한 연구개발을 수행하고 있다.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.366-366
/
2023
우리나라 농촌 지역의 농업용저수지는 유역면적이 작고 홍수 도달시간이 짧아 홍수 대응에 어려움이 있으며, 대부분의 농업용저수지는 용수공급 목적으로 건설되어 홍수 대응능력이 부족한 실정이다. 한국농어촌공사는 수자원, 재난재해 등 농촌용수 관련된 다양한 정보의 통합관리를 위한RAWRIS(Rural Agricultural Water Resource Information System)을 운영하고 있으나, 소하천 및 농촌 지역의 홍수 피해 저감에 대한 관리와 노력은 도시 지역의 대하천 유역과 비교하여 여전히 부족한 실정이다. 이에 본 연구에서는 농촌지역의 과학적 재해관리를 위해 RAWRIS의 홍수량 산정기술을 개선하고, 저수지 홍수예경보에 필요한 기상청 초단기 강우예측자료의 활용성을 검토하고자 하였다. 이를 위해 농어촌공사에서 관리하는 농업용저수지 중 홍수배제시설인 레디얼게이트가 설치된 농업용저수지 30개소를 대상으로 해당 저수지의 수위계측 정보, 수문 방류 정보 등 저수지 홍수관리 현황을 조사하였다. 다음으로 농어촌공사가 운영 중인 RAWRIS의 홍수량 산정과정을 검토하여, 기존 RAWRIS에 CN값이 미설정된 저수지 유역의 CN값을 설정하였으며, 유역의 강우량 및 유효우량 산정 알고리즘 개선하고 저수지 유역별 강우-유출모형의 대표 매개변수를 제시하였다. 마지막으로 기상청에서 제공하고 있는 초단기 강우예측자료의 활용성 평가를 위해 기상청 강우예측자료와 저수지 유역의 면적평균강우를 비교하였으며, 예측 및 관측강우에 의한 홍수유입량을 산정하여 그 결과를 비교하였다. RAWRIS 홍수량 산정기술의 개선 효과를 검토한 결과, 예당저수지의 경우에는 첨두유량백분율 오차가 최대 50 % 이상, 결정계수(R2)가 최대 0.6 이상 개선된 것으로 나타났다. 다음으로 초단기 강우예측자료의 활용성을 평가하기 위해 RAWRIS에 제공되는 기상청 강우예측자료와 관측강우자료을 비교한 결과, 초단기 예측강우자료는 정량적, 정성적 신뢰도의 문제가 있어, 농업용저수지 홍수예측시스템에 그대로 적용하는데에는 무리가 있는 것으로 나타났다.
Korean Journal of Construction Engineering and Management
/
v.6
no.5
s.27
/
pp.119-127
/
2005
According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.
Korean Journal of Construction Engineering and Management
/
v.5
no.1
s.17
/
pp.124-132
/
2004
A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects
Korean Journal of Construction Engineering and Management
/
v.4
no.2
s.14
/
pp.74-81
/
2003
In the construction industry, projects are becoming increasingly large and complex, involving multiple subcontractors. Traditional centralized coordination techniques used by the general contractors become less effective as subcontractors perform most wok and provide their own resources. When subcontractors cannot provide enough resources, they hinder their own performance as well as that of other subconractors and ultimately the entire project Thus, construction projects need a new distributed coordination approach wherein all of the concerned subcontractors can reschedule a project dynamically. To enable the distributed coordination framework of project schedule changes, the author developed an agent-based compensatory negotiation methodology, which allows intelligent software agents to simulate negotiations on behalf of their human subcontractors. In addition to this theoretical work, 1 designed and implemented a prototype to demonstrate the effectiveness of the framework. Thus, this research formalizes the necessary steps that would help construction project participants to increase the efficiency of their resource use, which in turn will enhance successful completions of whole projects.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.12
/
pp.7364-7371
/
2014
Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.
Seo, Kwi-Bin;Min, Se Dong;Lee, Seung-Hyun;Hong, Min
Journal of Internet Computing and Services
/
v.20
no.3
/
pp.61-68
/
2019
The goal of the construction work in the past was to improve the efficiency through cost reduction and shortening the construction period. However, the importance of safety management has recently been emphasized, and the Ministry of Employment and Labor has set a goal of reducing the number of deaths caused by industrial accidents by half. As a result, institutional and legal improvements are pursued and the need for safety is emphasized. However, most construction companies, except for some large construction companies, are lacking in safety management. So, In this paper, we design and implement a safety management system for construction site using smart helmets and beacons.
Kim, Kuk-Il;Sung, Min-Seok;An, Sang-Byung;Hong, Sung-Taek
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2022.10a
/
pp.43-46
/
2022
The optimal operation of the water purification plant can be carried out only when the required flow rate is supplied in a timely manner using the minimum electrical energy by accurately predicting the pattern and amount of tap water used in the consumer. In order to ensure the stability of tap water production and supply, a system that can be pre-verified before applying AI-based composite sensors to the water purification plant was established to derive complementary matters through the pre-verification model for each composite sensor and improve the quality and operation stability of the composite sensor data.
Korean Journal of Construction Engineering and Management
/
v.21
no.3
/
pp.39-47
/
2020
There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.