• Title/Summary/Keyword: 공사관리시스템

Search Result 946, Processing Time 0.032 seconds

A Study on the Actual Construction Database Modeling and Application for Commercial Buildings (상업건축물의 공사칠적 데이터베이스(DB) 모델구축 밑 응용방안)

  • Kim Sun-Kuk;Lee Sung-Ho;Kim Tae-Hui;Joo Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.83-90
    • /
    • 2002
  • Actual construction data are unsystematically handled and uselessly hoarded after completion of the project although actual construction data can be applied to the various works of the future projects. Many researches have been carried out by several engineers and scholars of construction firms and research institutes, but the level of the application is not plausible yet. The objective of this paper is to propose a web-based data model and application system for commercial buildings in order to enhance the usability of the actual construction data on line. The principal factors of commercial building project data and the user$^{\circ}{\phi}s$ requirements in various areas, such as planning, design, procurement and construction and so on are analyzed to implement the database structure of the proposed system. The application of resource Information focused on cost, manpower, equipment is included in the system, which is expected to enhances the usability of actual database application system compared with other researches proposed so far.

Engineering based on Simulation Technique for Overseas Power Plant Projects (시뮬레이션 기술 적용 해외발전사업 엔지니어링)

  • Baek, Sehyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.63-67
    • /
    • 2021
  • 해외 발전사업의 기술 경쟁력 우위 선점을 위해서는 발전시스템에 대한 최적설계기술 및 발전소 운영 기간 중 최소 비용으로 높은 신뢰도의 설비 관리, 최적 성능 유지를 할 수 있는 O&M 관리 기술이 필요하다. 전력연구원은 해외발전사업 전주기 기술지원을 위한 연구개발을 수행하고 있다.

Flood forecasting system of agricultural reservoirs based on the RAWRIS realtime data (RAWRIS 실측자료 기반 농업용저수지 홍수예측시스템)

  • Jaekyoung Noh;Jaenam Lee;Minseok Kang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.366-366
    • /
    • 2023
  • 우리나라 농촌 지역의 농업용저수지는 유역면적이 작고 홍수 도달시간이 짧아 홍수 대응에 어려움이 있으며, 대부분의 농업용저수지는 용수공급 목적으로 건설되어 홍수 대응능력이 부족한 실정이다. 한국농어촌공사는 수자원, 재난재해 등 농촌용수 관련된 다양한 정보의 통합관리를 위한RAWRIS(Rural Agricultural Water Resource Information System)을 운영하고 있으나, 소하천 및 농촌 지역의 홍수 피해 저감에 대한 관리와 노력은 도시 지역의 대하천 유역과 비교하여 여전히 부족한 실정이다. 이에 본 연구에서는 농촌지역의 과학적 재해관리를 위해 RAWRIS의 홍수량 산정기술을 개선하고, 저수지 홍수예경보에 필요한 기상청 초단기 강우예측자료의 활용성을 검토하고자 하였다. 이를 위해 농어촌공사에서 관리하는 농업용저수지 중 홍수배제시설인 레디얼게이트가 설치된 농업용저수지 30개소를 대상으로 해당 저수지의 수위계측 정보, 수문 방류 정보 등 저수지 홍수관리 현황을 조사하였다. 다음으로 농어촌공사가 운영 중인 RAWRIS의 홍수량 산정과정을 검토하여, 기존 RAWRIS에 CN값이 미설정된 저수지 유역의 CN값을 설정하였으며, 유역의 강우량 및 유효우량 산정 알고리즘 개선하고 저수지 유역별 강우-유출모형의 대표 매개변수를 제시하였다. 마지막으로 기상청에서 제공하고 있는 초단기 강우예측자료의 활용성 평가를 위해 기상청 강우예측자료와 저수지 유역의 면적평균강우를 비교하였으며, 예측 및 관측강우에 의한 홍수유입량을 산정하여 그 결과를 비교하였다. RAWRIS 홍수량 산정기술의 개선 효과를 검토한 결과, 예당저수지의 경우에는 첨두유량백분율 오차가 최대 50 % 이상, 결정계수(R2)가 최대 0.6 이상 개선된 것으로 나타났다. 다음으로 초단기 강우예측자료의 활용성을 평가하기 위해 RAWRIS에 제공되는 기상청 강우예측자료와 관측강우자료을 비교한 결과, 초단기 예측강우자료는 정량적, 정성적 신뢰도의 문제가 있어, 농업용저수지 홍수예측시스템에 그대로 적용하는데에는 무리가 있는 것으로 나타났다.

  • PDF

Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase (착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안)

  • Ryu, Han-Guk;Kim, Sun-Kuk;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.5 s.27
    • /
    • pp.119-127
    • /
    • 2005
  • According to the recent systemic changes such as construction market reduction, five days per week system, introduction of construction duration reduction bidding system and post-construction sale system, the bidding competition have been enhanced. However, there are many construction schedule risks which could delay construction completion. Without the proper identification of construction schedule risks and the structured construction schedule risk management, the competitive advantages of construction project could not be made. Previous researches to solve the problem have been focused on the construction schedule categorization, construction schedule management, and the system development to manage the construction schedule risk. Therefore, this study selected the reinforeced concrete construction as the studied work due to the major impact characteristics on the total construction duration and the quite accident rate, and then proposed the real construction schedule risks of reinforced concrete construction and the construction risk management method based on the previous studies, many times of expert interviews and brainstorming.

A study on the Human Resource Management through Application of Daily Scheduling Check System (일일 공정 Check System을 활용한 인력관리 사례 연구)

  • Park Chan-Jeong;Park Hong-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.124-132
    • /
    • 2004
  • A human resource management of the general contractors is to mostly deal with daily input by each subcontractor in construction fields. However, this way has some limitations; the identification of proper human-input and productivity, preventive activities or efforts for minimizing schedule delay. The reason why these limitations are that few systematic efforts through a coordinated field administration with the construction schedule planning and human resources. Therefore, on the basis of the construction schedule planning, human resource management of subcontractors is necessary to make for an improvement in construction schedule control. Daily Scheduling Check System(DSCS), as the linked human resources on an existed CPM scheduling software, was developed and this paper then verified validity and effectiveness of using the DSCS for the framework of some actual apartment construction projects

Distributed Coordination of Project Schedule Changes: An Agent-Based Compensatory Negotiation Approach (건설공사 공정변경의 분산조정 : 에이전트기반의 보상협의 방식)

  • Kim Kee-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.74-81
    • /
    • 2003
  • In the construction industry, projects are becoming increasingly large and complex, involving multiple subcontractors. Traditional centralized coordination techniques used by the general contractors become less effective as subcontractors perform most wok and provide their own resources. When subcontractors cannot provide enough resources, they hinder their own performance as well as that of other subconractors and ultimately the entire project Thus, construction projects need a new distributed coordination approach wherein all of the concerned subcontractors can reschedule a project dynamically. To enable the distributed coordination framework of project schedule changes, the author developed an agent-based compensatory negotiation methodology, which allows intelligent software agents to simulate negotiations on behalf of their human subcontractors. In addition to this theoretical work, 1 designed and implemented a prototype to demonstrate the effectiveness of the framework. Thus, this research formalizes the necessary steps that would help construction project participants to increase the efficiency of their resource use, which in turn will enhance successful completions of whole projects.

Development of the Construction Post-evaluation System in Public Construction Projects (공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구)

  • Ok, Hyun;Yang, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7364-7371
    • /
    • 2014
  • Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.

Design and Implementation of Construction site Safety management System using Smart Helmet and BLE Beacons (스마트 안전모와 비콘을 이용한 건설현장 안전관리 시스템 설계 및 구현)

  • Seo, Kwi-Bin;Min, Se Dong;Lee, Seung-Hyun;Hong, Min
    • Journal of Internet Computing and Services
    • /
    • v.20 no.3
    • /
    • pp.61-68
    • /
    • 2019
  • The goal of the construction work in the past was to improve the efficiency through cost reduction and shortening the construction period. However, the importance of safety management has recently been emphasized, and the Ministry of Employment and Labor has set a goal of reducing the number of deaths caused by industrial accidents by half. As a result, institutional and legal improvements are pursued and the need for safety is emphasized. However, most construction companies, except for some large construction companies, are lacking in safety management. So, In this paper, we design and implement a safety management system for construction site using smart helmets and beacons.

Establishment of AI-based composite sensor pre-verification system for energy management and composite sensor verification in water purification plant (정수장에서의 에너지 관리 및 복합센서 검증을 위한 AI 기반 복합센서 사전검증시스템 구축)

  • Kim, Kuk-Il;Sung, Min-Seok;An, Sang-Byung;Hong, Sung-Taek
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.43-46
    • /
    • 2022
  • The optimal operation of the water purification plant can be carried out only when the required flow rate is supplied in a timely manner using the minimum electrical energy by accurately predicting the pattern and amount of tap water used in the consumer. In order to ensure the stability of tap water production and supply, a system that can be pre-verified before applying AI-based composite sensors to the water purification plant was established to derive complementary matters through the pre-verification model for each composite sensor and improve the quality and operation stability of the composite sensor data.

  • PDF

Comparative Analysis on Productivity Data and Cost Estimate System of Road Bridge Construction in Korea and China (한국 및 중국 도로교량공사의 생산성자료 및 예정가격 산정시스템 비교분석)

  • Chang, Cheng;Huh, Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.39-47
    • /
    • 2020
  • There are two kinds of cost estimate system in construction in china. Quota valuation model is a traditional cost estimate system under the unity of quantity and price, which is easier and has been used for decades. But the Quota valuation model becomes increasingly unsuited to the needs of society with the development of market economy. To meet the needs of China's market economy development and construction works in the field of international cooperation, the Bill of Quantities valuation model was introduced in 2003. However, there are still many shortcomings and deficiencies in the course of implementation of Bill of Quantities valuation model. In addition, interest in the Chinese construction market continues to increase in Korea due to the recent new North Korean policy and China's the Belt and Road policy. This paper aims to examine the cost estimate system of public construction works in China, and to provide basic data for deriving future improvement plans by comparing and analyzing it with standard cost estimate system in Korea.