• Title/Summary/Keyword: 건축물 품질관리

Search Result 115, Processing Time 0.026 seconds

Construction Supervision Improvement Methodology of Public Installment Buildings (분양건축물에 대한 감리제도 개선 방안)

  • Bu Seung-Hyon;Ryu Han-Guk;Lee Hyon-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.365-368
    • /
    • 2003
  • The supervision system due to the Building Law was introduced in 1963. As the building came to be more various from the side of use, efficiency and the size, it came to be complicated. Construction Technical Managemen Law started in 1994. and it introduced a responsibility supervision system. And Residential Building Promotion Law improved quality of Buildings. But these facts are limited in part in the supervision objective building, and supervision system is restricted. This research investigates the current problem of supervision system, and the improvement program will go far toward solving the problem.

  • PDF

A Study on the Status and Actual Condition of Suspended Buildings in Gangwon (강원도 공사중단 건축물의 현황 및 실태 조사 연구)

  • Suhr, Myong-Suk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.2
    • /
    • pp.138-144
    • /
    • 2019
  • To analyze the present state of buildings suspended in Gangwon and estimate the compressive strength by visual inspection and Schmidt hammer method in order to analyze durability etc.. In this study, we analyzed the problems that existed in the location where construction is suspended and efficient management method. Expected construction restoration of construction will be restarted, and important parts of the construction site should be given the best protection measures so that the quality can be maintained thoroughly. The construction of the suspended construction is exposed to the freezing and thawing damage over time. Therefore, it is necessary to take measures such as maintenance, and take protective measures by establishing a plan to improve the durability of buildings that are under construction.

Improvement and Expected Effect of Construction Supervision System for Mix-Use Residential Building (주상복합건물의 감리제도 개선방안과 기대효과)

  • Son, Bo-Sik;Bu, Seung-Hyon;Kim, Kyung-Whal;Lee, Hyun-Soo;Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.62-70
    • /
    • 2006
  • As buildings are changing variously from the side of use, efficiency and size, the construction qualities are more importantly recognized. Supervision system was enacted in the Residential Building Law in 1990 and responsibility supervision system in the Construction Engineering Management Law in 1994, respectively. However, recently revised supervision system in 2003 has some limitations: the present problems of appointing supervisor, disposing the supervisors, supervisor's works. Therefore, the aim of this study is to improve the present supervision system for mix-use residential building. By implementing the proposed revised supervision system, it will be able to expect quality improvement, confidence of the owner and the user, development of construction technology, and increase international competitiveness of supervision company.

The Voluntary Assurance of Quality by Contractors in the Construction Phase (건설 공사단계에서 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.292-300
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.

The Improvement Plan of Quality and Organization Management through the Survey of Actual Condition in Construction Work (건설공사 실태분석을 통한 품질 및 조직관리 개선방안)

  • Choi, Byung-Ju;Choi, Seok-Woo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.213-218
    • /
    • 2007
  • Domestic by opening of world construction market with recent FTA should be achieved systematic action that of exoteric surrounding construction environment to inculcate this because consciousness structure unpreparedness of legation fields about quality is expose for hindrance factor for QI in construction spot by quality and organization management official important thing for building company's QI because conquest is possible through QI of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of change and good quality rapidly, organization's CEO determination must become side improvement the formation government official enemy, and when inspect by each process, responsible persons participate cooperation enterprise space-time. To improve this because complete charge department for quality control appears that organization management need complete charge department being expose by greatly unprepared misgovernment in heavy hydrogen building company, expense that CEO under direct control histiocyte modeling air with AHP analysis is economical will be cost, but is construed can bring excellent effect in operation management side of quality and organization such as cost-cutting effect in maintenance side and I should do so that can occupy competitive power high position with tissue at active quality complete charge deputy.

  • PDF

A Study on Concrete Curing Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance (서중(暑中) 환경에서 현장 콘크리트 시험을 통한 양생 품질관리 방안)

  • Park, Shin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.71-80
    • /
    • 2006
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of quality problem under hot and cold weather. Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Dae-gu is fumed out to be the longest area after investigating application period and days focused on 8 cities weather information about t relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the curing construction processing in the region and found out the problem of quality management. Then figure out the way of solution. Moreover, we integrated curing quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make curing construction standard guide and plan under hot weather.

A Study on the Properties of Ready Mixed Concrete Quality in Site by Statistical Analysis (통계분석에 의한 현장 타설 콘크리트의 품질 특성에 관한 연구)

  • Ji, Suk-Won;Jung, Si-Jin;Seo, Chee-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.5
    • /
    • pp.171-180
    • /
    • 2007
  • The quality of ready-mixed concrete(henceforth abbreviated remicon) is influenced by various factors such as ingredient of material, difference of property, mixing ratio, mixing time, mixing error, conditioning of construction, method of curing and temperature, humidity time in transportation. These factors make it hard to confirm the quality of remicon till placing in site. As the quality control in field is very important to ensure the quality of building. Moreover in modern building production, the more important the inquiry of performance improvement, the more important the manufacture and the quality control of remicon. In this study, to examine and analyze the quality of remicon we used slump, air content and compressive strength in 7, 28 days as to remicon which placed during on year. As a result, we found that the slump and air content were satisfied with reference code and the compressive strength was more than the design standard strength so we concluded that the quality control of remicon was to be agreeable.

An Analysis and Improvement of Free Form Building's Construction Productivity - Focused on Exposed Concrete Work - (비정형 건축물 공사의 생산성 분석 및 향상방안 - 노출콘크리트 공사를 중심으로 -)

  • Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.38-46
    • /
    • 2014
  • The Global's top five Design Firms selected from BauNetz a German architectural magazine in 2007 designed free form building design which was 25% of the overall design by 2006-2010. Free form building is a landmark of the city and the country so its social and economic impacts are very large. In case of Korea, free form buildings such as Tribowl in Incheon, KINTEX Exhibition hall 2 and Dongdaemun Design Plaza have increased. However, those the increase in design trends and, the needs due to the lack of free form building design and construction management experience, free form building projects can't be expected to profitability and have a number of problems after completion. Especially, there are many excessive quality problems and the rising cost due to design changes frequently and lack of experience and data. Thus an initial plan regardless of considering of free form building's characteristics can be a huge risk because of the difference with the plan and actual projects, yet there aren't free form building project's performance data and case studies related to productivity. In this study, through selection of low-construction productivity works and an analysis of the work process and productivity data, hope to propose an actual field productivity of free form building and the ways to improve productivity.

Deployment of Appropriate Architectural Construction Engineers to Solve Quality and Safety Problems at Construction Sites (건설현장의 품질·안전문제 해결을 위한 적정 건축시공기술자의 배치 관련 연구)

  • Kim, Hyunjun;Kim, Jin-Dong;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.15-23
    • /
    • 2024
  • Recently, quality problems, such as the collapse of apartment structures under construction, has emerged as a social issue. Although there are various causes of quality problem and the impact of each problem may be different, the problems from the perspective of construction engineer of construction company are investigated. Therefore, this study aim to investigate the adequacy of construction engineer's experience, number of field engineer, timing of engineer deployment at construction sites, etc. in order to resolve quality and safety problems. In this study, a questionnaire survey was conducted targeting construction managers to obtain objective opinions. The results showed that the number of construction engineers in construction companies should be increased and that intermediate construction engineers should be increased to enable practical site management for resolving quality and safety problems. In addition, it was found that there was a need to reduce the number of non-regular employed field construction engineers in construction site and at the same time systematically regulate the number of on-site construction engineers, similar to safety managers and quality managers.