Korean Journal of Construction Engineering and Management
/
v.20
no.6
/
pp.98-106
/
2019
Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.
Global warming has increased interest in reducing greenhouse gas emissions. And a policy has effort to reduce energy consumption as a greenhouse gas reduction plan. In Korea, 25% of total energy is consumed in the building sector. In order to reduce energy consumption of buildings, it is possible to expand the utilization of wood as a structural material or thermal insulation materials with low thermal conductivity. It is also reported that when used as an interior finishing material, the energy consumption of the building is reduced by up to 7% by insulation performance. In this study, the heat transfer characteristics and the heat capacity were compared according to the three type of finishing materials(cement, paulownia coreana, medium density fiberboard) normally used as indoor finish materials. Through this study, most of the heat transfer volumes are transferred in the form of radiant heat, and the result was derived from the highest amount of energy and heat transfer in the use of paulownia coreana. When indoor finishing materials are used as wood, it is deemed that energy efficiency inside the building will be improved.
Journal of the Korean Institute of Landscape Architecture
/
v.47
no.2
/
pp.117-132
/
2019
The study examines the significance and limits of modern park planning by analyzing major planning documents of Gyeongseong in the Japanese colonial era. Among seven selected documents from 1925 to 1940, which show the contents related with park planning, documents of 1930 and 1940 presented the official park plan of Gyeongseong. By the 1920s, the park plan was not a major concern in urban planning of Gyeongseong; however, as the planning law as enacted in 1934, the park plan legally became a part of the official master planning process in the 1930s. In 1940, the most comprehensive park plan for Gyeongseong was published. In the beginning of modern urban planning, a park was mainly perceived as a sanitation utility. From the 1920s to the 1930s, the park planning system was significantly improved including systemic classification of parks, guideline development considering spatial planning, and introduction of a concept of infra-structural green space. Despite of the improvement in the park planning, the actual quantity of the overall green spaces barely changed and there was a huge discrepancy between the planning ideal and the reality. The Gyeongseong stadium was the only facility newly built in the 1920s, and only two parks were constructed in the 1930s. The plan to build 38 new parks in the 1930, and 140 in the 1940 was barely realized. However, there were efforts to improve parks and green spaces of Gyeongseong: Such as appropriating natural forest as parks, designating royal palaces as parks, and focusing on constructing smaller scale children's parks. Even though the ideal plan could not be fully implemented due to the war time situation and tight budget, the park system of Gyeongseong provided the framework of park planning of Seoul after the independence.
Journal of the Korean Institute of Traditional Landscape Architecture
/
v.36
no.4
/
pp.58-69
/
2018
The purpose of this study was to present specific standards for landscape planning and construction applicable to landscaping areas in various historical sites. The results are as follows: First, the types of historical sites are classified according to their preservation status and processing techniques, and the classification according to their status is divided into those that have been buried underground, such as those that have been exposed to the ground, such as buildings and structures, and those that have a reputation or a record of the sites. The classification according to the wartime processing technique was classified by such techniques as closures that isolate the site, penetration that can be seen on the site, and overlays where a separate protection facility is installed on the site. Second, the principles of landscape planning for display of historical sites are divided into the items that make up the historical site, surface treatment of the sites, tree planting, and installation of facilities. If the site is not a circular space, the area separating the space by different materials between the components is required. In the event that preservation of the historical site is required, it is deemed desirable to use the soil, and to do so, the use of grasses and shrubs is effectively considered to be effective. The introduction of plants and plants should be considered according to the nature of the space. Depending on the area and nature of the monument, the facility is required to take a cautious approach by reviewing its influence on the landscape and the additional excavation of the monument. Third, the readjustment method derived as a result of looking at the landscaping principle in the historical site space was classified as conservation of status, installation of protection facilities, burial, restoration, relocation, and reproduction. Preservation of the status quo is essential for limited landscape planning and should not affect the prototype of existing relics. The protection facility shall be installed where necessary to protect the relics, and when the soil is formed, the surface treatment shall be required to remove trees that could damage the site and prevent soil and soil oil from being lost after the site. The restoration shall establish a landscaping plan according to the circular preservation based on the clues to the circle. The transfer requires a landscaping plan to create an environment similar to the outer space of an existing site and should be able to highlight the value or location of the original site. The reenactment should have a landscaping plan to revive the landscape and atmosphere of the past for the now-defunct remains. Fourth, landscaping can simultaneously satisfy the preservation of excavation sites and the increase in exhibition effects. In order to protect the traces of the past and vitalize the site of the ruins today, specific measures are required, the creation of a park for historical sites that preserve the functions and value of the relics, and the formation of a shape of linked contents can be suggested as alternatives.
The Installation, Maintence, and Safety Control of Fire-fighting Systems Act of South Korea regulates that over 30-storey high-rise buildings including underground spaces should vitally perform the Performance-based Design to minimize property damage and personal injury as a fire risk assessment in advance. Therefore a PBD designer such as a fire safety professional engineer evaluate occupant's life safety by a scientific methodology. In order to evaluate the life safety, fire safety designers calculate the Required Safety Egress Time (RSET) which does not have the legal criteria regarding the standard method of calculation yet. So this way has been showing different results depending upon the designer's choice, knowledges and experiences. In this study, RSET calculation methods by six designers respectively were analysed from the thirteen reports of real performance based design projects conducted in Busan for a last five years. In particular, the Response Time calculation methods which have the most powerful effect for figuring the RSET are compared with the other designer's to deduce an error value.
Journal of the Korea institute for structural maintenance and inspection
/
v.27
no.2
/
pp.25-32
/
2023
In this study, a double wall system is introduced, which was invented to simplify the complicated manufacturing process of the existing precast concrete (PC) double wall systems and to remove defects such as laitance that may occur during the production of concrete panels. An experimental study was conducted to investigate the tensile resisting capacity of the steel tube which is embedded in the precast concrete panel to keep the spacing between PC panels and to prevent damage of the PC panels during transportation and casting concrete onsite. The experiment was planned to determine the detail of effective steel tube connection considering the steel plate treatment method according to the formation of the opening, the presence of embedded concrete, and the reinforcement welding for additional dowel action as key variables. As a result, the ultimate tensile strength increased by 20-30% compared to the control specimen (ST) except for the steel tube specimen (ST_CP) which has steel plates bent inward at the end part of the steel tube. Since the specimen (ST_CON) filled with concrete inside the control specimen has no additional process and cost for the steel tube connections compared to the control specimen during the production of the developed double wall system, it is determined to be the appropriate detail of steel tube connection.
The purpose of this research is to evaluate an accurate biotope area ratio model with efficiency and convenience of database management through promoting sustainable development to provide people amenities in a new town. In particular, the biotope area ratio is used not only in the environment impact assessment but Green building certification criteria. But now there is no any index map of biotope. So it is very hard to implement with data for supplement results. In this research, we suggest the model of integrated attributable information. The evaluation of biotope area ratio is to include a basic land use planning map and a building coverage area which is a wall of greening surface and roof. In case of non building coverage area, the evaluation of biotope area ratio is to include water space, artificial ground, natural ground and pervious gap-pave. A weighted value on the spatial information is combined into the information. And then the merged one is given a land use planning information in a block. In the weighted value on the space type information, it is possible to in its circumstances. Therefore, it can be substituted a correspondence of numerical change for various values elastically in this model.
Journal of the Korean Institute of Landscape Architecture
/
v.47
no.6
/
pp.45-52
/
2019
As international criteria and standards are required in the fields of design and construction, landscape performance must also be considered not only for the value of the landscape but also for providing quality assurance and sustainability. Given the lack of research on landscape performance, the present research was purposed to analyze the importance of potential assessment categories and items using an analytical network process. A list of assessment items, which is composed of 20 items and 6 categories, was derived through a literature review and a preliminary survey of 11 landscape professionals. An ANP model was established and a survey was conducted among 30 landscape practitioners to determine the weight of priorities considering the criteria. The results of ANP showed that the categories of site selection, preservation and health, and convenience had high priorities while materials had the lowest importance score. For the assessment items, a monitoring plan was the highest importance, followed by cultural/ historic preservation, management cost reduction, and natural ground areas. Despite the difficulties in quantifying landscape achievements, most respondents agreed that there needs to be an evaluation system for landscape performance in order to assure the quality and sustainability of landscape development. More research and discussion are needed to develop an assessment system for landscape performance that is applicable to Korean context.
The postpartum care center is a facility which made its debut only about 10 years ago but has now changed the nation's postpartum care culture. Women delivered of a child use the postpartum care center at this time since the low rate of childbirth has become a social phenomenon. However, while the postpartum care center is not supported legally and systematically, anybody can run it after they only file a report on businessman status with the tax office. So there are disordered wave of postpartum care startups which do not have basic facilities. Thus, this study is intended to suggest an interior environment plan considering an efficient space and users' benefits of a postpartum care center which has a characteristic difference from that of ordinary facilities in terms of targeted persons or operations but for which standards are not clear in terms of the Health and Welfare Law and the Medical Service Law. This study was conducted by investigating the actual condition of the entrance space, living space, common-use space, nursing space, administration and attached space in the six postpartum care centers selected from Seoul and Kyeonggi-do region and suggesting the direction of improvements, thus establishing the direction of interior designs and an interior environment plan. Hopefully, this study would be used as basic data on interior building plans, thus being helpful in enhancing the satisfaction of the postpartum care center user and operating the facility.
The purpose of this study is to analyze the cases related to the multi-dimensional urban planning and its related systems that can contribute to the urban regeneration as the policies and projects for stereoscopic city increase. Through the case analysis, urban regeneration function and role of multi-dimensional urban planning are identified as connection of places, activation of local economy, expansion of infrastructure and supply of housing. In the institutional sector, private participation is hindered due to the ban on the establishment of the right to hold state property. In addition, it is difficult to utilize the three-dimensional urban space without land securing at a certain rate based on uniform installation standards of the two-dimensional land use plan, and the problem of insufficient interconnection between law and institution is derived. In conclusion, it should actively support and promote the promotion of the three-dimensional facility with the aim of diversifying the regional infrastructure structure and strengthening the urban function. In addition, development of stereoscopic and compound development should be promoted for old urban areas, and parking lots, underground shopping malls, parking lots, etc. should be installed using the subspaces of parks, schools, roads and traditional markets of old residential areas. Finally, cooperation between the central government, the municipalities and the private sector is necessary for the realization of these urban regeneration projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.