Journal of the Korea Institute of Building Construction
/
v.22
no.5
/
pp.473-483
/
2022
BIM(Building Information Modeling) is a technology that can manage information throughout the entire life cycle of the construction industry and serves as a platform for improving productivity and integrating the entire construction industry. Currently, BIM is actively applied in developed countries, and its use at various overseas construction sites is increasing This is unclear. due to air shortening and budget savings. However, there is still a lack of institutional basis and technical limitations in the domestic construction sector, which have led to the lack of utilization of BIM. Various activation measures and institutional frameworks will need to be established for the early establishment of these productive BIMs in Korea. Therefore, as part of the research for the domestic settlement and revitalization of BIM, this study derived a number of key factors necessary for the development of the construction industry through brainstorming and expert surveys using AHP techniques and analyzed the relative importance of each factor. In addition, prior surveys by a group of experts resulted in 1, 3 items in level, 2, 9 items in level, and 3, 27 items in level, and priorities analysis was performed through pairwise comparisons. As a result of the AHP analysis, it was found that the relative importance weight of policy aspects was highest in level 1, and the policy factors in level 2 and the cost-based and incentive system introduction factors were considered most important in level 3. These findings show that the importance of the policy guidance or institutions underlying the activation of BIM rather than research and development or corporate innovation is relatively high, and that the preparation of policy plans by public institutions should be the first priority. Therefore, it is considered that the development of a policy system or guideline must be prioritized before it can be advanced to the next activation stage. The use of BIM technologies will not only contribute to improving the productivity of the construction industry, but also to the overall development of the industry and the growth of the construction industry. It is expected that the results of this study can provide as useful information when establishing policies for activating BIM in central government, relevant local governments, and related public institutions.
Proceedings of the Korea Water Resources Association Conference
/
2011.05a
/
pp.30-30
/
2011
현재 우리나라는 수자원의 안정적인 확보와 효율적인 관리를 위하여 20년 단위의 수자원장기 종합계획을 수립하고 있으며, 향후 발생가능한 물의 과부족을 평가하는 물수급 분석을 통해 최적의 수자원관리 계획을 수립하고 있다. 하지만, 현재의 수자원장기종합계획에서는 미래 물수급 전망을 단일 값으로 제시하는 확정론적 기법을 적용하고 있으며, 과거 유출패턴이 미래에도 똑같이 재현된다는 가정 하에 물수급 분석을 수행한다. 이는 기후변화의 불확실성에 따른 물공급 시나리오의 다양성을 고려하지 않는 것을 뜻하며, 현재 다양한 GCM(Global Circulation Model)을 통해 제시되고 있는 미래 수자원 변동 전망을 물수급 분석에 반영하지 않고 있음을 말해 주는 것이다. 따라서, 본 연구에서는 기후변화에 따른 미래 자연유출량의 불확실성을 반영할 수 있는 물수급 전망 기법을 제안코자 한다. 먼저 국내유역에 적합한 GCM 시나리오들을 선정하였으며, 스케일상세화(downscaling) 기법을 통해 한강유역 중권역별 강우량, 증발산량 등의 일 단위 미래 수문기상 자료를 구축하였다. 다음으로, 앞서 구축한 기상자료를 개념적 강우-유출 모형인 TANK 모형에 입력하여 중권역별 미래 유출량을 산정하여 각 시나리오별 미래 유출량 변화를 전망하였다. 물수급 분석 모형으로는 한국건설기술연구원에서 미국 SEI-B와 제휴하여 개발한 통합수자원평가계획모형인 K-WEAP을 사용하였으며, 물수급 분석 결과를 바탕으로 중권역별 물공급 지수를 산정하여 제시하였다. 현재 대부분의 기후변화 연구에서는 GCM 시나리오를 직접 적용한 결과를 바탕으로 미래 수자원 전망 결과를 제시하고 있는데, 여기에는 GCM 자체의 불확실성은 물론 과거 관측 자료를 입력자료로 하는 기존 연구 방법론으로 부터의 급진적인 변화에 따른 연구 연속성의 문제 또한 존재한다. 따라서 본 연구에서는 GCM 유출량 시나리오의 직접 적용 대신 과거 유출 시나리오별 가중값을 산정하여 반영함으로서 GCM 모의 결과의 불확실성을 저감하는 방안을 제안하였다.
A super speed maglev is a complicated system integrating electric, electronic, mechanic, civil and construction engineering. So, there must be an integrative system to monitor and manage operation requirements and standard features of each subsystem and the interfaces between each technology. As an indispensable part that can ensure whole system performance, a secure interface for each individual subsystem is an important management item of system engineering. By securing the interface performance of each individual subsystem, system failure can be effectively prevented in advance. Based on system engineering techniques, improvement of security and reliability for a super speed maglev is described in this research.
This study dealt with a systematic approach for sediment replenishment works which defines the artificial supply of coarse sediment to downstream river channels of dams. That is an increasing practice in Japanese, American and European rivers for the purpose of compensating sediment deficits downstream and rehabilitating geomorphological habitats below dams. We introduced five main objectives of the sediment replenishment, simply from construction of artificial spawning redds for anadromous fish to restoration of fluvial geomorphological process of river system. Then we suggested determination of sediment size distribution and quantity of coarse sediment as well as selecting an effective implementation method in corresponding to specific objectives and local restrictions in the basin, reservoir and river.
Proceedings of the Korea Water Resources Association Conference
/
2023.05a
/
pp.11-11
/
2023
2020년 기준 우리나라 전체 지하수 시설은 총 1,659천개소, 이용량은 2,916백만m3/년, 년간 지하수 개발가능량은 130억m3대비 22.3%이다(환경부 등, 2021). 단위면적당 지하수 시설수와 이용량은 16.8개소/km2, 29,168m3/년/km2(81.1m3/일/km2)이다. 이러한 자료는 가뭄 대응시 신규 관정 개발도 필요하지만, 기존에 개발된 관정들을 최대한 효율적으로 활용하는 방안을 우선적으로 고려해야 한다는 것을 시사한다. 관정들을 상호 연계하게 되면 여러 개의 관정에서 나오는 물을 합하여 총량을 늘릴 수 있기 때문에, 가뭄 등 비상시에 일시적으로 다량의 물을 공급할 수 있다. 또한, 평상시에도 적절한 양수량 조절을 통해 지하수 자원의 손실을 막고 수위 저하에 의한 문제를 최소화할 수 있다. 관정연계시스템(well network system, WNS)은 기존 관정들을 가상의(virtually) 또는 물리적(physical) 연계를 하여, 최적의 지하수를 공급할 수 있는 시스템으로 정의할 수 있다. 가뭄 대응 및 효율적 지하수 자원 활용을 위한 관정연계시스템 개발과 실증을 위해 홍성군 서부면 양곡리 일대에 양수제어, 관로시설, 물탱크 등 물리적인 시설을 시험 설치하여 운영하고 있다. 또한, 관정연계시스템은 ICT 기술과 지하수관리 기법을 연동하여 지하수 관정들을 연계하고 최적으로 운영할 수 있는 하나의 의사결정시스템으로서 관정연계 플랫폼을 개발하였다. 관정연계 플랫폼은 웹기반으로 개발되었으며, 대수층의 수리지질 특성, 수요에 기반한 물공급량 평가, 관정 연계 시나리오 및 최적 운영 알고리즘, 지하수 모델링 등이 가능하도록 각각의 모듈들이 구성 및 통합·운영 되도록 설계되었다. 본 시스템 개발을 통해 가뭄 발생시 현장에서 신속히 지하수로 물을 공급할 수 있으며, 신규 관정 개발에 드는 비용을 절약할 수 있고, 기존 시설을 활용하기 때문에 새로운 수자원 건설 인프라 구축 비용도 절감할 수 있을 것이다. 또한, 개별관정에 대한 이용률 제고와 지하수관리도 보다 체계적, 과학적으로 할 수 있을 것으로 기대한다. 하지만, 이러한 시스템이 제대로 운영 및 보급되기 위해서는 관정연계와 관련한 법제도적 보완과 함께, 지역사회의 공적자원으로서의 지하수에 대한 인식개선과 지하수의 개발 및 보전, 적합한 합리적 배분·이용 등 적극적인 협조가 이루어져야 한다.
Kim, Ha-Young;Nam, Won-Ho;Mun, Young-Sik;Kim, Jonggun;Shin, Yongchul
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.195-195
/
2021
최근 기후변화, 과도한 지하수 이용 등으로 유역 환경이 변화하고 있으며, 이에 따른 부작용으로 하천의 건천화, 지표유출량 증가, 증발산량 감소 등 물순환 구조가 왜곡되고 있다. 물순환 과정은 지역적 조건에 따라 다르게 나타나며, 모의 요소와 해석 기법도 다르다. 따라서 지속가능하고 건전화된 물순환을 위해 해당 유역의 물순환계를 정확히 파악하고 고려하여 객관적으로 정량화할 수 있어야 한다. 현재 우리나라 농업유역은 논, 용·배수로, 농업용 저수지가 존재하며, 종합적인 농촌용수 물순환 해석을 위해 농촌용수 요소별 해석 기술 및 모듈 개발, 모델링 기법 등을 이용하여 농촌수자원의 체계적·과학적 해석 및 관리 시스템 개발이 이루어져야 한다. 본 연구에서는 강원도 원주시에 위치한 흥업저수지를 대상으로 농촌용수의 물순환 과정을 정립하였으며, 저수지 시점부·말단부, 농업용 저수지, 저수지 유역으로 구분하여 물순환 분석을 수행하였다. 물순환 모의 요소로 저수지 수위, 유역 유출량, 수로부 공급량 및 배수량, 회귀수량 등으로 선정하였으며, 수로 네트워크 기반의 SWMM (Storm Water Management Model) 모형을 이용하여 종합적인 농촌용수 물순환 해석을 수행하였다. 또한, 물순환 해석 기법의 적용성 검증을 위해 모의 요소별 모니터링을 수행하였으며, SWMM 모형과 모니터링을 비교하여 적용성을 평가하였다. 본 연구 결과를 통해 농촌지역 특성 및 기후변화를 고려한 농촌수자원의 안정적인 공급과 국가 청정 수자원 확보를 위한 통합 물관리 정책을 실현하는데 기초 자료로써 활용 가능할 것이라 사료된다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.6D
/
pp.1011-1017
/
2006
It is so sensitive that the wetland ecosystem very weak in artificial interference and environment change. wetlands are a transitional zone between aquatic and terrestrial ecosystems. This natural property is important to people and life. It is necessary to preservation and protection of the wetland with a countermeasure. we really need to Environment-GIS (E-GIS) and digital map which is included correct position, attribute data and range of the wetland. In this study, we take priority of making a database of wetland management. Moreover, we standardize a digital map production of wetland in our research and we improve accuracy of control survey using GPS surveying. The main purpose of this study is to suggest a pre-estimated wetland that have not yet been discovered. by analysing terrain, geological feature, a geographical distribution of plants and animals using GIS.
Korean Journal of Construction Engineering and Management
/
v.16
no.4
/
pp.70-79
/
2015
With the rise of the interest in a renewable system, the importance of the Life Cycle Cost Analysis(LCCA), an economic evaluation tool, has been increasing. However, there is an inevitable gap between a real cost and an estimation from LCCA because of the uncertainty of the external environment in real world. As the input variables in an analysis, such as a real discount rate and an energy cost, ares subject to change as time goes by, strategic decision on the current operating system is made depending on the real cost. Current economic evaluation approaches have treated only the fluctuation of input variables without consideration of the flexibility in operation, which has consequently led to the impairment on the reliability of LCCA. Therefore, new approach needs to be proposed to consider both the uncertainty of input variables and operational flexibility. To address this issue, the application of the Real Option to LCCA is presented in this study. Through a case analysis of LCCA of a solar heating system, the limits and current status of LCCA are identified. As a result, quantitative presentation of strategic decisions has been added in the new approach to implement the traditional approach.
Korean Journal of Construction Engineering and Management
/
v.18
no.4
/
pp.3-16
/
2017
Forecasting cash flow is very important but is difficult and complicated to analysis in high-rise development projects. And An expected value which was forecasted on the early stage is likely to fluctuate due to uncertainties around such complicated huge project to consider the probable uncertainty. There are not objectified method which are able to cope with uncertainty of project, and feasibility study based on selected financial analysis does not include liquidity of cash flow. Through such a stochastic method, developer can cope with cash flow fluctuation and set up a financial plan. Also this study is meaningful for laying the foundation for high-rise development project and feasibility study as well as the suitability and accuracy of feasibility study. Analysis showed that NPV and IRR include residential apartments shows surplus revenue as return of apartments offset deficit of hotel and office. Factors influencing the project feasibility for high-rise development project are sales account of $1^{st}$ year and annual vacancy rate of office.
Korean Journal of Construction Engineering and Management
/
v.11
no.1
/
pp.101-112
/
2010
The Korean real estate market currently is experiencing a slowdown due to the global economic crisis which has resulted from subprime mortgage lending practices. In response, the Korean government has enforced various policies, based on intend to deregulate real estate speculation, such as increasing the Loan to value ratio (LTV) in order to stimulate housing supply, demand and accompanying housing transactions. However, these policies have appeared to result in deep confusion in the Korean housing market. Furthermore, analyses for housing market forecasting particularly those which examine the impact of the international financial crisis on the Korean real estate market have been partial and fragmentary. Therefore, a comprehensive and systematical approach is required to analyze the real estate financial market and the causal nexus between market determining factors. Thus, with an integrated perspective and applying a system dynamics methodology, this paper proposes Korean Real Estate and Mortgage Market dynamics models based on the fundamental principles of housing markets, which are determined by supply and demand. As well, the potential effects of the Korean government's deregulation policies are considered by focusing on the main factor of these policies: the mortgage loan.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.