• Title/Summary/Keyword: 개착터널

Search Result 104, Processing Time 0.035 seconds

Geological and Geophysical Surveys for Determining Causes of Rack Slides (암반사면 사태의 원인규명을 위한 지질조사 및 전기비저항 탐사)

  • 황학수;이태섭;기원서;박종오;문창규;최정환
    • The Journal of Engineering Geology
    • /
    • v.11 no.3
    • /
    • pp.295-301
    • /
    • 2001
  • Geological and geophysical surveys were performed to examined the cause of the rock-mass slide occurred at the opening site of the Wanglim tunnel of the Seoul-Pusan High Speed Railway. The results of geophygical survey and geometrical analysis for the geological structures indicate that the rock-mass slide was triggered by the heavy rainfall which increases the groundwater level and results in high pore pressure in the N60$^{\circ}$ E-trending major fractured zone of the slope, and that the foliation dipping toward the vertical open face of the slope acted as a main sliding plane during movement.

  • PDF

Analysis of Seismic Behaviour of Cut and Cover Tunnel according to backfill materials (뒤채움재 특성별 개착식 터널의 동적 거동 특성 연구)

  • Kim, Nag-Young;Lee, Seung-Ho;Lee, Yong-Jun;Kim, Jung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.177-186
    • /
    • 2005
  • World widely, the occurrences of earthquakes have been increased recently including to nations which earthquake often happen to like Japan. Taking into account that the earthquake acceleration at design was 0.154 g at the contigency level earthuake (CLE) with its geological condition, it resulted that this method must be the most efficient condition against the earthquake vibration to two lane cut-and cover tunnel. The correlations between the result of the shaking table test and its numerical analysis showed that the test data of the bending stress due to the earthquake vibration have been underestimated about 5 percents in case of the cut slope 1 : 0.6 and about 10 percent in case of the cut slope 1 : 1.2. However, on average, the results showed a similar tendency that the higher the height of the backfill of the EPS block was, the less the bending stress was.

  • PDF

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.

Investigation for the deformation behavior of the precast arch structure in the open-cut tunnel (개착식 터널 프리캐스트 아치 구조물의 변형 거동 연구)

  • Kim, Hak Joon;Lee, Gyu-Phil;Lim, Chul Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.93-113
    • /
    • 2019
  • The behavior of the 3 hinged precast arch structure was investigated by comparing field measurements with numerical analyses performed for precast lining arch structures, which are widely used for the open-cut tunnel. According to the field measurements, the maximum vertical displacement occurred at the crown with upward displacements during the backfilling up to the crown of the arch and downward displacements at the backfill height above the crown. The final crown displacement was 19 mm upward from the original position. The horizontal displacement at the sidewall, which had a maximum horizontal displacement, occurred inward of the arch when compacting the backfill up to the crown and returned to the original position after completing the backfill construction. According to the analysis of displacement measurements, economical design is expected to be possible for precast arch structures compared to rigid concrete structures due to ground-structure interactions. Duncan model gave good results for the estimation of displacements and deformed shape of the tunnel according to the numerical analyses comparing with field measurements. The earth pressure coefficients calculated from the numerical analyses were 0.4 and 0.7 for the left and the right side of the tunnel respectively, which are agreed well with the eccentric load acting on the tunnel due to topographical condition and actual field measurements.

An application of the tubular roof construction method for Seoul subway tunnel construction (서울지하철 터널의 T.R.c.M. 공법 적용 사례 연구)

  • Jie, Hong-Keun;You, Kwang-Ho;Park, Yeon-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.4
    • /
    • pp.345-356
    • /
    • 2004
  • Open-cut method has been widely used to construct underground structures, but it causes several problems such as traffic congestion and public resentment resulting from severe construction noise and ground settlement. In many cases, it is very difficult to build underground structures safely due to the unknown locations of buried facilities such as water pipes, drainage pipes, gas pipes and high-pressure cable conduits etc. Also in open-cut method, moving buried facilities causes additional cost and extension of construction period. Therefore, this paper is to present a case study in which Tubular Roof construction Method (T.R.c.M.), a newly developed construction method for underground structures using slab steel pipes and PC wall trench, is applied for the construction of a subway tunnel in Seoul. As a result, it is found that T.R.c.M. is a construction method by which tunnels can be constructed safely without any effect on the surrounding environment and traffic flow due to the minimized construction vibration and noise.

  • PDF

Monitoring of Cut-Slope Behavior with Consideration of Rock Structure and Failure Mode (개착사면의 구조적 특성과 파괴양상을 고려한 계측 해석)

  • Cho, Tae-Chin;Park, So-Young;Lee, Sang-Bae;Lee, Geun-Ho;Won, Kyung-Sik
    • Tunnel and Underground Space
    • /
    • v.16 no.6 s.65
    • /
    • pp.451-466
    • /
    • 2006
  • Analysis of slope behavior concerning the structural characteristics of field rock mass can be processed by virtue of borehole information of joint orientation and position acquired from DOM drilled core. Anticipated sliding potential of pre-failed rock slope is analyzed and the regional slope instability is investigated by inspecting the hazardous joints and blocks the traces of which is projected on the cut-face. Cross section has been set at the center of rock slope and the traces of both joints and tetrahedral blocks, which potentially can induce the slope failure, are drawn to investigate the failure modes and the triggering mechanism. Automated monitoring system has been established to measure the slope movement and especially, inclinometer has been installed inside DOM borehole to analyze the slope movement by considering the internal rock structure. Algorithms for predicting the slope failure time have been reviewed and the significance of heavy rainfall on the slope behavior has been investigated.

Identification of Dominant Cause of Cut-Slope Collapse and Monitoring of Reinforced Slope Behavior (개착사면의 붕락요인 분석 및 보강거동 계측)

  • Cho, Tae-Chin;Lee, Sang-Bae;Lee, Guen-Ho;Hwang, Taik-Jean;Kang, Pil-Gue;Won, Byung-Nam
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.20-32
    • /
    • 2011
  • Failure aspects of cut-slope, which induce the sequential collapses during the excavation stage, have been analyzed. Slope rock structures are investigated by examining the orientations and positions of discontinuity planes calculated based on the BIPS image inside the boreholes. Drilled core log has been also used to identify the structural defects. Clay minerals of swelling potentials are detected through XRD analysis. Numerical analysis for slope stability has been performed by utilizing the joint shear strength acquired from the direct joint shear test. Cut-slope collapse characteristics have been studied by investigating the posture of failure-prawn joint planes and the stability of tetrahedral blocks of different sizes. Cross-section analysis has been also performed to analyze the cut-slope behavior and to estimate the amount of reinforcement required to secure the stability of cut-slope. Behavior of reinforced cut-slope is also investigated by analyzing the slope monitoring data.

A study on the driving Performance of the microtunneling machine with a rotating water jet cutterhead (워터젯 보조면판이 장착된 마이크로터널링 머신의 장애물 돌파 성능에 관한 연구)

  • Kim Jung-Guen;Park Tae-Dong
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.367-372
    • /
    • 2003
  • 도심의 편리한 생활을 위해 초고속 데이터 통신, 상하수도, 가스등의 원할 한 공급이 요구되고 있으며 이러한 인프라 시설들은 지하터널을 통하여 공급이 되게 된다. 도심지의 교통혼잡과 소음, 진동으로 인한 사회비용의 증가와 민원으로 사실상 개착식 공법은 적용되기 어려운 실정에 있다. 특히 앞에 열거한 인프라 시설들은 2m이하의 중소형 크기로 마이크로터널링 공법이 널리 사용되고 있으며 최근에는 현실적인 현장의 요구와 공사비용의 절감을 위해 1m이하의 소형터널에 대한 요구가 늘어 나고 있으나 마이크로터널링 머신의 소형화에 따른 절삭력의 감소와 지하 장애물에 대한 대처가 어려워짐으로 이에 대한 해결책이 요구되고 있다. 이를 위해 워터젯이 장착된 마이크로터널링 머신이 소개된바 있지만 면판에 단순고정된 형태라 절삭면적 및 효율에 한계가 있다. 본 연구는 절삭면적의 확대 및 효율의 증가를 위해 공전하는 면판에 자전하는 워터젯 보조면판을 제안하였으며 워터젯에 가장 적합한 커터종류를 찾기 위해 절삭력을 고려한 성능계수를 제안하였다.

  • PDF