Abstract
Failure aspects of cut-slope, which induce the sequential collapses during the excavation stage, have been analyzed. Slope rock structures are investigated by examining the orientations and positions of discontinuity planes calculated based on the BIPS image inside the boreholes. Drilled core log has been also used to identify the structural defects. Clay minerals of swelling potentials are detected through XRD analysis. Numerical analysis for slope stability has been performed by utilizing the joint shear strength acquired from the direct joint shear test. Cut-slope collapse characteristics have been studied by investigating the posture of failure-prawn joint planes and the stability of tetrahedral blocks of different sizes. Cross-section analysis has been also performed to analyze the cut-slope behavior and to estimate the amount of reinforcement required to secure the stability of cut-slope. Behavior of reinforced cut-slope is also investigated by analyzing the slope monitoring data.
개착과정에서 붕락현상이 발생한 암반사면의 거동양상을 분석하였다. 개착사면 암반의 특성 분석을 위하여 시추작업을 수행하였으며, BIPS 영상 분석을 통하여 불연속면의 방향성과 시추공 내의 출현 위치를 측정하였다. 회수된 코어를 관찰하여 암반 내부의 구조적 취약성을 고찰하였다. 절리면에 협재된 팽윤성 점토광물의 조성을 X-선 회절분석을 통하여 조사하였으며, 직접전단실험을 수행하여 절리면 전단강도를 측정하였다. 사면파괴를 유발시킬 수 있는 절리들의 위치 및 방향성을 고려한 블록해석을 수행하여 규모별 블록안정성을 산출하였다. 횡단면 해석기법을 이용하여 개착과정 중에 발생할 수 있는 지반거동 양상을 분석하였으며, 안정성 확보를 위하여 소요되는 보강량을 산정하였다. 보강작업이 수행된 개착사면의 추가적인 거동양상을 계측 해석을 통하여 고찰하였다.