Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level

국외 오프사이트 건설 관리 연구 동향 : 작업 단계 수준에서의 문헌 연구

  • Jang, JunYoung (Department of Architectural Engineering, Incheon National University) ;
  • Chen, Hao (Department of Architectural Engineering, Incheon National University) ;
  • Lee, Chansik (College of Urban Architecture epartment Engineeringof Architectural Engineering, Incheon National University) ;
  • Kim, TaeWan (College of Urban Architecture Engineering, Incheon National University)
  • Received : 2019.05.13
  • Accepted : 2019.06.21
  • Published : 2019.07.31

Abstract

Off-Site Construction (OSC) is a new construction method based on factory production. OSC (Off-Site Construction) is a new construction method based on factory production. Researches such as OSC-related design and production standardization, transport methods are actively conducted in the U.S., UK and other parts of the world as this new method has an edge over existing methods in terms of productivity, economy and quality. As the emergence of this new area requires reasonable management, an analysis of the scope of construction project management is required accordingly. Therefore, this research analyzed the study trends and relationships at the CM/PM range's "Operation level" to identify areas of study, relationship between studies and deficiencies in current research. This study carried out a comprehensive literature review of the OSC (CM/PM) research by analyzing 94 papers in Operation level as of September 3, 2018, and the analysis results are as follows. (1) Working stage level researches have been increasing rapidly since 2006. (2) Non-volumetric type is contributing most significantly at work stage level. In the building sector, it has been identified that problems such as residential: living, quality issues, non-residential: economic difficulties, factory: productivity problems have been addressed. (4) The Non-volumetric pre-assembly type dealt with the economic feasibility of residential and non-residential buildings, whereas the modular type was studied in regards to assembly quality. (5) From 2006, project management areas (e.g., quality, human resources, risks) have been expanded. It is expected that this research will help find new areas of research for OSC. If the analysis is carried out to the level of the industrial, corporate and project phases in the future, it is deemed that the overall research flow and area of the OSC industry can be identified.

OSC (Off-Site Construction)는 공장 생산 기반의 새로운 건설 방식이다. 생산성과 경제성, 품질면에서 기존 방식에 우위에 있기 때문에 미국, 영국 등 세계 각지에서 OSC 관련 설계 및 생산 표준화, 운반 방법 등과 같은 연구들이 활발하게 진행되고 있다. 새로운 분야의 출현으로 합리적인 관리가 요구됨에 따라 건설사업관리 범위에 대한 분석이 필요한 실정이다. 따라서 이 연구는 CM/PM범위의 "작업 단계 수준"에서 연구 동향 및 관계를 분석하여 연구의 영역, 연구 간 관계, 현재의 연구에서 부족한 부분 등을 파악하였다. 이 연구에서는 2018년 9월3일까지 작업 단계의 수준 94개의 논문으로, OSC (CM/PM)연구에 대한 포괄적인 문헌 검토를 수행하였으며, 분석 결과 다음과 같다. (1) 2006년부터 작업 단계 수준의 연구가 빠르게 증가하고 있다. (2) Non-volumetric pre-assembly유형은 작업 단계에서 가장 크게 기여하고 있다. (3) 건축물 유형에서는 주거용: 주거의 생활, 품질 문제, 비주거: 경제 문제, 공장: 생산성 문제를 다루는 것으로 확인되었다. (4) Non-volumetric pre-assembly 유형은 주거용 및 비주거용 건축물에서 경제성에 대한 내용을 다루고 있었으며, 반면, Modular building 유형은 조립 품질에 관련된 연구가 수행되었다. (5) 2006년부터 프로젝트 관리 영역(예 : 품질, 인적 자원, 위험)이 확장되었다. 이 연구를 활용하면 OSC 새로운 연구 영역을 찾는데 도움이 될 것으로 예상된다. 추후 산업, 기업, 프로젝트 단계 수준까지 분석을 진행한다면, OSC 산업의 전반적인 연구 흐름 및 분야별 영역을 파악할 수 있을 것으로 판단된다.

Keywords

GGRHC4_2019_v20n4_114_f0001.png 이미지

Fig. 1. OSC project management papers trends 1986-2018 (Total 241)

GGRHC4_2019_v20n4_114_f0002.png 이미지

Fig. 2. OSC Project Management papers Keyword Trend 1986-2018 (Total 241)

GGRHC4_2019_v20n4_114_f0003.png 이미지

Fig. 3. Trends of process-level OSC management papers by phases (Total 94)

GGRHC4_2019_v20n4_114_f0004.png 이미지

Fig. 4. Trends of process-level OSC management papers by OSC types (total 68; missing 26)

GGRHC4_2019_v20n4_114_f0005.png 이미지

Fig. 5. Trends of process-level OSC management papers by applications (Total 55; missing 39)

Table 1. Definition of domestic Off-site construction

GGRHC4_2019_v20n4_114_t0001.png 이미지

Table 2. Definition of overseas Off-Site construction

GGRHC4_2019_v20n4_114_t0002.png 이미지

Table 3. Number of journals in the project management area from 1986 to 2018

GGRHC4_2019_v20n4_114_t0003.png 이미지

Table 4. Cross-tabulation of process-level OSC management papers by OSC types and construction types (Total 43; Unknown 51)

GGRHC4_2019_v20n4_114_t0004.png 이미지

Table 5. Cross-tabulation of process-level OSC management papers by project phases and management areas

GGRHC4_2019_v20n4_114_t0005.png 이미지

Table 6. Cross-tabulation of process-level OSC management papers by OSC types and phases

GGRHC4_2019_v20n4_114_t0006.png 이미지

Table 7. Cross-tabulation of process-level OSC management papers by Construction types and phases

GGRHC4_2019_v20n4_114_t0007.png 이미지

Table 8. Cross-tabulation of process-level OSC management papers by management areas and OSC Types

GGRHC4_2019_v20n4_114_t0008.png 이미지

Table 9. Cross-tabulation of process-level OSC management papers by management areas and construction types

GGRHC4_2019_v20n4_114_t0009.png 이미지

References

  1. Altobelli, F., Taylo, H., and Bernold, L. (1993). "The International Institute of Production Engineering Research (CIRP)." Journal of Aerospace Engineering, 6(1), pp. 19-33. https://doi.org/10.1061/(ASCE)0893-1321(1993)6:1(19)
  2. Arashpour, M., Wakefield, R., Abbasi, B., Lee, E.W.M., and Minas, J. (2016). "Off-site construction optimization: Sequencing multiple job classes with time constraints." Automation in Construction, 71, pp. 262-270. https://doi.org/10.1016/j.autcon.2016.08.001
  3. Arashpour, M., Bai, Y., Aranda-mena, G., Babhadiashar, A., Hosseini, R., and Kalutara, P. (2017). "Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction." Automation in Construction, 84, pp. 146-153. https://doi.org/10.1016/j.autcon.2017.08.032
  4. Baeza Pereyra, J., and Alvarez Romero, S. (2009). "Technical and economical simulation of two roofing construction systems in southeast Mexico." Revista Ingenieria de Construccion, 24(2), pp. 167-180.
  5. Benjaoran, V., and Dawood, N. (2006). "Intelligence approach to production planning system for bespoke precast concrete products." Automation in Construction, 15(6), pp. 737-745. https://doi.org/10.1016/j.autcon.2005.09.007
  6. Chen, Y., Okudan, G.E., and Riley, D.R. (2010). "Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization." Automation in Construction, 19(6), pp. 665-675. https://doi.org/10.1016/j.autcon.2010.02.011
  7. Cheng, M.Y., and Chen, J.C. (2002). "Integrating barcode and GIS for monitoring construction progress." Automation in Construction, 11(1), pp. 23-33. https://doi.org/10.1016/S0926-5805(01)00043-7
  8. Diez, R., Padron, V.M., Abderrahim, M., and Balaguer, C. (2007). "AUTMOD3 : The Integration of Design and Planning Tools for Automatic Modular Construction." International Journal of Advanced Robotic Systems, 4(4), pp. 457-468.
  9. Finnie, D., Ali, N.A., and Park, K. (2018). "Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand." Management Procurement and Law, 171(4), pp. 176-185.
  10. Garg, A., and Kamat, V.R. (2012). "Virtual Prototyping for Robotic Fabrication of Rebar Cages in Manufactured Concrete Construction." Journal of Architectural Engineering, 20(1), pp. 309-318.
  11. Gibb, A. (2001). "A review of recent and current industry and research initiatives on pre-assembly in construction." Construction Research & Innovation Strategy Panel Rights, pp. 5-8.
  12. Gibb, A., and Isack, F. (2003). "Re-engineering through pre-assembly: Client expectations and drivers." Building Research and Information, 31(2), pp. 146-160. https://doi.org/10.1080/09613210302000
  13. Ha, T.H. (2011). "Structural Performance of Modular Building System." Journal of the KGBC, 12(3), pp. 26-33.
  14. Hallmark, R., White, H., and Collin, P. (2012). "Prefabricated Bridge Construction across Europe and America." Practice Periodical on Structural Design and Construction, 17(3), pp. 82-92. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000116
  15. Han, S.H., Al-Hussein, M., Al-Jibouri, S., and Yu, H. (2012). "Automated post-simulation visualization of modular building production assembly line." Automation in Construction, 21, pp. 229-236. https://doi.org/10.1016/j.autcon.2011.06.007
  16. Han, S.H., Hasan, S., Bouferguene, A., Al-hussein, M., Asce, M., and Kosa, J. (2015). "Utilization of 3D Visualization of Mobile Crane Operations for Modular Construction On-Site Assembly." Journal of Management in Engineering, 31(5), pp. 1-9.
  17. Heravi, G., and Firoozi, M. (2017). "Production process improvement of buildings' prefabricated steel frames using value stream mapping." The International Journal of Advanced Manufacturing Technology, 89(9), pp. 3307-3321. https://doi.org/10.1007/s00170-016-9306-9
  18. Herkommer, F., and Bley, B. (1996). "CAD/CAM for the prefabrication of brickwork." Automation in Construction, 4(4), pp. 321-329. https://doi.org/10.1016/0926-5805(95)00013-5
  19. Hosseini, M.R., Martek, I., Zavadskas, E.K., Aibinu, A.A., Arashpour, M., and Chileshe, N. (2018). "Critical evaluation of off-site construction research: A Scientometric analysis." Automation in Construction, 87, pp. 235-247. https://doi.org/10.1016/j.autcon.2017.12.002
  20. Jaillon, L., and Poon, C.S. (2010). "Design issues of using prefabrication in hong kong building construction." Construction Management and Economics, 28(10), pp. 1025-1042. https://doi.org/10.1080/01446193.2010.498481
  21. Jin, R., Gao, S., Cheshmehzangi, A., and Aboagye-Nimo, E. (2018). "A Holistic Review of off-site Construction Literature Published between 2008 and 2018." Journal of Cleaner Production, 202, pp. 1202-1219. https://doi.org/10.1016/j.jclepro.2018.08.195
  22. Jo, S., Lee, E., and Pyo, K. (2018). "Integrating a Procurement Management Process into Critical Chain Project Management (CCPM): A Case-Study on Oil and Gas Projects, the Piping Process." Sustainability, 10(6), p. 1817. https://doi.org/10.3390/su10061817
  23. Jonsson, H., and Rudberg, M. (2017). "KPIs for measuring performance of production systems for residential building: A production strategy perspective." Construction Innovation, 17(3), pp. 381-403. https://doi.org/10.1108/CI-06-2016-0034
  24. Kamali, M., and Hewage, K. (2016). "Life cycle performance of modular buildings: A critical review." Renewable and Sustainable Energy Reviews, 62, pp. 1171-1183. https://doi.org/10.1016/j.rser.2016.05.031
  25. Kim, M.K., Wang, Q., Park, J.W., Cheng, J.C.P., Sohn, H., and Chang, C.C. (2016). "Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM." Automation in Construction, 72, pp. 102-114. https://doi.org/10.1016/j.autcon.2016.08.035
  26. Kim, M.K,. Brilakis, L., and An, Y.K. (2015). "A study on influencing factors and revitalization of the adoption of off-site construction." Journal of KIBIM, 5(3), pp. 33-40. https://doi.org/10.13161/kibim.2015.5.3.033
  27. Kim, S., Seol, H., Ikuma, L.H., and Nussbaum, M.A. (2008). "Knowledge and opinions of designers of industrialized wall panels regarding incorporating ergonomics in design." International Journal of Industrial Ergonomics, 38(2), pp. 150-157. https://doi.org/10.1016/j.ergon.2007.08.009
  28. Korea Institute of Civil Engineering and Building Technology. (1997). Construction Engineering & Management. 1rd ed, Boseonggak, Korea, pp. 25-26.
  29. Korea Productivity Center (2013). "Quarterly Labor Productivity Tendency." (Nov. 1, 2018)
  30. Lee, C,J., and Lim, S,H. (2015). "An Analysis on Architectural Characteristics of Domestic Modular Housing and Building Material Standardization Effect through MC Design." Journal of the Korean Housing Association, 26(6), pp. 103-113. https://doi.org/10.6107/JKHA.2015.26.6.103
  31. Leu, S.S., and Hwang, S.T. (2002). "GA-based resource-constrained flow-shop scheduling model for mixed precast production." Automation in Construction, 11(4), pp. 439-452. https://doi.org/10.1016/S0926-5805(01)00083-8
  32. Li, C.Z., Xu, X., Shen, G.Q., Fan, C., Li, X., and Hong, J. (2018). "A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong." Journal of Cleaner Production, 185, pp. 366-381. https://doi.org/10.1016/j.jclepro.2018.02.308
  33. Li, C.Z., Zhong, R.Y., Xue, F., Xu, G., Chen, K., Huang, G. G., and Shen, G.Q. (2017). "Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction." Journal of Cleaner Production, 165, pp. 1048-1062. https://doi.org/10.1016/j.jclepro.2017.07.156
  34. Li, Z., Shen, G.Q., and Xue, X. (2014). "Critical review of the research on the management of prefabricated construction." Habitat International, 43, pp. 240-249. https://doi.org/10.1016/j.habitatint.2014.04.001
  35. Lim, S.H., and Lee, G.K. (2011). "A Study on the Standardization of UBR (Unit Bath Room) by Utilizing Reference Plane." Journal of Architectural Institute of Korea, 27(1), pp. 81-88.
  36. Martinez, S., Jardon, A., Navarro, J.M., Gonzalez, P., Martinez, S., Jardon, A., and Gonzalez, P. (2015). "Building industrialization : robotized assembly of modular products." Assembly Automation, 28(2), pp. 134-142. https://doi.org/10.1108/01445150810863716
  37. Kim, D.M., Lee, J.S., Kim, J.H., and Kim, J.J. (2014). "Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 78-86. https://doi.org/10.6106/KJCEM.2014.15.1.078
  38. McKinsey & Company (2017). Reinventing construction through a productivity revolution, McKinsey Global Institute Report, 2017-11.
  39. Melo, R.S.S. De, and Alves, T.C.L. (2010). "Investigation of the supply chain of prefabricated wooden doors." Lean Construction Journal, pp. 30-42.
  40. Moghadam, M., Al-Hussein, M., Al-Jibouri, S., and Telyas, A. (2012). "Post simulation visualization model for effective scheduling of modular building construction." Canadian Journal of Civil Engineering, 39(9), pp. 1053-1061. https://doi.org/10.1139/l2012-077
  41. Niu, Y., Lu, W., Liu, D., Chen, K., Anumba, C., and Huang, G.G. (2017). "An SCO-Enabled Logistics and Supply Chain-Management System in Construction." Journal of Construction Engineering and Management, 143(3).
  42. Nor, M., Azman, A., Ahamad, M.S.S., Hamid, Z.A., and Gomez, C.P. (2012). "The selection of IBS precast manufacturing plant in Malaysia using GIS." Malaysian Construction Research Journal, 10(1), pp. 77-90.
  43. O'Neill, D., and Organ, S. (2016). "A literature review of the evolution of British prefabricated low-rise housing." Structural Survey, 34(2), pp. 191-214. https://doi.org/10.1108/SS-08-2015-0037
  44. Penin, L., Balaguer, C.P., J.M, R., F.J, B., and A, Aracil, R. (1998). "Robotized Spraying of Prefabricated Panels." IEEE Robotics & Automation Magazine, 5(3) (September), pp. 18-29. https://doi.org/10.1109/100.728220
  45. Pereyra, J.R.B., Romero, S.O.A., Yucatan, U.A. De, Chen, Y., Okudan, G.E., and Riley, D.R. (2010). "Automation in Construction Sustainable performance criteria for construction method selection in concrete buildings." Automation in Construction, Elsevier B.V., 24(2), pp. 235-244.
  46. PMI. (2013). A Guide to the Project Management Body of Knowledge. In (5a ed.). Pennsylvania: Project Management Institute, Inc.
  47. Rausch, C., Asce, S.M., Nahangi, M., Perreault, M., Haas, C. T., Asce, F., and West, J. (2017). "Optimum Assembly Planning for Modular Construction Components." 31(1), pp. 1-14.
  48. Rebolj, D., and Podbreznik, P. (2014). "Computers in Industry Supply-chain transparency within industrialized construction projectsus." 65, pp. 345-353. https://doi.org/10.1016/j.compind.2013.12.003
  49. Retik, A., and Warszawskit, A. (1994). "Automated Design of Prefabricated Building." Building and Environment, 29(4), pp. 421-436. https://doi.org/10.1016/0360-1323(94)90002-7
  50. Rohani, M., Fan, M., and Yu, C. (2014). "I ndoor and Built Advanced visualization and simulation techniques for modern construction management." 23(5), pp. 665-674. https://doi.org/10.1177/1420326X13498400
  51. Sadiq, M., Bouferguene, A., Liu, H., Al-hussein, M., and Yu, H. (2018). "Automation in Construction Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID." Automation in Construction, Elsevier, 85(August 2017), pp. 369-383. https://doi.org/10.1016/j.autcon.2017.09.009
  52. Salama, T., Salah, A., Moselhi, O., and Al-Hussein, M. (2017). "Near optimum selection of module configuration for efficient modular construction." Automation in Construction, 83, pp. 316-329. https://doi.org/10.1016/j.autcon.2017.03.008
  53. Samani, P., Jeremy, G., Leal, V., Mendes, A., and Correia, N. (2018). "Lifecycle Cost Analysis of Prefabricated Composite and Masonry Buildings : Comparative Study." 24(1), pp. 1-11.
  54. Shaked, O., and Warszawski, A. (1992). "CONSCHED: Expert System for Scheduling of Modular Construction Projects." Journal of Construction Engineering and Management, 118(3), pp. 488-506. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:3(488)
  55. Sutrisna, M., Ramanayaka, C.D.D., Goulding, J.S., Sutrisna, M., Ramanayaka, C.D.D., and Goulding, J.S. (2018). "Developing work breakdown structure matrix for managing offsite construction projects." 2007 (May).
  56. Svajlenka, J., and Kozlovska, M. (2018). "Houses based on wood as an ecological and sustainable housing alternative-Case study." Sustainability, 10(5), p. 1502. https://doi.org/10.3390/su10051502
  57. Taghaddos, H., Asce, A.M., Hermann, U., Asce, M., Abourizk, S., Asce, M., Mohamed, Y., and Asce, M. (2014). "Simulation-Based Multiagent Approach for Scheduling Modular Construction." 28(April), pp. 263-274. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000262
  58. Tam, V.W.Y., Tam, C.M., and Ng, W.C.Y. (2007). "On prefabrication implementation for different project types and procurement methods in Hong Kong." Journal of Engineering Design and Technology, 5(1), pp. 68-80. https://doi.org/10.1108/17260530710746614
  59. Wang, Y., Yuan, Z., and Sun, C. (2018). "Research on Assembly Sequence Planning and Optimization of Precast Concrete Buildings." Journal of Civil Engineering and Management, 24(2), pp. 106-115. https://doi.org/10.3846/jcem.2018.458
  60. Wang, Z., and Hu, H. (2018). "Dynamic response to demand variability for precast production rescheduling with multiple lines." International Journal of Production Research, 56(16), pp. 5386-5401. https://doi.org/10.1080/00207543.2017.1414970
  61. Wu, P., and Low, S.P. (2014). "Barriers to achieving green precast concrete stock management - a survey of current stock management practices in Singapore." International Journal of Construction Management, 14(2), pp. 78-89. https://doi.org/10.1080/15623599.2014.899126
  62. Xu, G., Li, M., Luo, L., Chen, C., and Huang, G.Q. (2018). "Cloud-based fleet management for prefabrication transportation." Enterprise Information Systems, Taylor & Francis, 13(1), pp. 87-106. https://doi.org/10.1080/17517575.2018.1455109
  63. Xue, H., Zhang, S., Su, Y., and Wu, Z. (2018). "Capital cost optimization for prefabrication: A factor analysis evaluation model." Sustainability, 10(1), pp. 1-22. https://doi.org/10.3390/su10020001
  64. Yang, H., Chung, J.K.H., Chen, Y., Pan, Y., Mei, Z., and Sun, X. (2018). "Ordering Strategy Analysis of Prefabricated Component Manufacturer in Construction Supply Chain." Mathematical Problems in Engineering, 2018.
  65. Yu, H., Al-Hussein, M., Al-Jibouri, S., and Telyas, A. (2013). "Lean Transformation in a Modular Building Company: A Case for Implementation." Journal of Management in Engineering, 29(1), pp. 103-111. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000115
  66. Zakaria, S.A.S., Gajendran, T., Rose, T., and Brewer, G. (2018). "Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review." Architectural Engineering and Design Management, 14(1-2), pp. 3-26. https://doi.org/10.1080/17452007.2017.1291410
  67. Zhai, Y., Zhong, R.Y., Li, Z., and Huang, G. (2017). "Production lead-time hedging and coordination in prefabricated construction supply chain management." International Journal of Production Research, 55(14), pp. 3984-4002. https://doi.org/10.1080/00207543.2016.1231432