• Title/Summary/Keyword: Project management

Search Result 7,053, Processing Time 0.032 seconds

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

A Study on the Effect of PMO Involvement on Project Performance (PMO의 관여도가 프로젝트성과에 미치는 영향에 관한 연구)

  • Won, Jong Ho;Park, So Hyun;Lee, Tae Won;Kim, Seung Chul
    • The Journal of Information Systems
    • /
    • v.32 no.2
    • /
    • pp.109-135
    • /
    • 2023
  • Purpose This study is based on previous studies related to the function and operating system of the project management system for efficient project management. The purpose of the study is, first, to find out how the project performance is affected by the utilization of the project management system and the involvement of the PMO. Second, the mediating effect of implementing integrated management between the project management system and project performance is to be demonstrated. Design/methodology/approach Based on previous studies related to project management, this study designed a research model by integrating functional factors derived from project management system design studies, integrated management factors, and factors derived from PMO function studies. Findings As a result of the empirical analysis, this study first confirmed that high utilization of the project management system and high involvement of the PMO are factors that affect project performance. In addition, it was confirmed that the establishment of the system and the introduction of PMO do not guarantee project performance. Second, it was confirmed that the execution of integrated management has a mediating effect between the system and the project performance, and that the high utilization of the system has a positive effect on the mediating effect.

An Exploratory Study on the Management Behavior of the Public Software Project (공공 소프트웨어 프로젝트의 관리 행태에 관한 탐색적 연구)

  • Kim, Yong-Kyong;Kim, Pil-Joong
    • Journal of Information Technology Applications and Management
    • /
    • v.13 no.4
    • /
    • pp.237-255
    • /
    • 2006
  • This study was exploratively performed to demonstrate the management behavior of the public software project in korea. In this study, 167 auditing reports on the public software project which were carried out during $1999{\sim}2003$, were employed and surveyed. Survey reveals that quality management was the most neglected in process of software project management relative to other 12 management areas. And configuration management, risk management, time management, and scope management follow up in order in its vulnerability in software project management.

  • PDF

Guidelines for Project Quality Management System (프로젝트 품질경영시스템 지침)

  • Choi Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.04a
    • /
    • pp.525-544
    • /
    • 2006
  • This paper is to introduce guidelines for project quality management system. International standards such as ISO 10006, IEC 62198, ISO/IEC TR 16326 and ISO 15188 are considered. This study is to discuss guidelines for quality management in projects, and application guidelines for project risk management, and guide for the application of ISO/IEC 12207 to software project management, and project management guidelines for terminology standardization.

  • PDF

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

The Effects of IT Project Risk Management Factors on Project Performance (IT 프로젝트 위험관리요인이 프로젝트 성과에 미치는 영향)

  • Jang, Sung-Bong;Kwahk, Kee-Young
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.31-51
    • /
    • 2011
  • Many companies have considered IT outsourcing as one of strategic alternatives in order to rapidly respond to changing business environment and strengthen their competitiveness. Despite its strategic role, however, IT outsourcing project has been plagued by a high failure rate and difficulty in realizing the promised project performance because of its inappropriate risk management. This study examines the effect of IT project management risk factors on project performance. We propose that project risk management factors(communication, technology sharing, and project control) influence project performance(process performance and product performance). Based on the empirical results, theoretical and practical implications of the study are discussed along with its limitations.

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

The Effect of Project Risk and Risk Management on Software Development Project Performance (프로젝트 위험과 위험관리가 소프트웨어 개발 프로젝트 성과에 미치는 영향)

  • Suh, Chang-Kyo;Jeong, Eun-Hee
    • Asia pacific journal of information systems
    • /
    • v.13 no.2
    • /
    • pp.199-217
    • /
    • 2003
  • Based on the IS literature on software project risk management, we developed an integrated model to investigate the risk factors and risk management factors in project development. We also analyzed the interrelation between project risk and project risk management. The questionaries are collected from 83 project leaders. We tested reliability and validity of the measure and analyzed the obtained data. The results support our risk-based hypothesis that shows the importance of risk management in reducing project risks and improving performance of project and process.

Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.