DOI QR코드

DOI QR Code

Improvement of Construction Quality Management through Analyzing Construction Work's Quality Inspection Results

건설공사 품질관리 적정성 확인 점검 결과를 통한 건설 품질관리 개선방안

  • Jung, Sangki (Korea Institute of Construction Quality) ;
  • Park, Jungeun (Department of Architectural Engineering, University of Seoul) ;
  • Cha, Yongwoon (Department of Architectural Engineering, University of Seoul) ;
  • Han, Sangwon (Department of Architectural Engineering, University of Seoul) ;
  • Hyun, Changtaek (Department of Architectural Engineering, University of Seoul)
  • Received : 2015.07.20
  • Accepted : 2015.11.20
  • Published : 2016.01.31

Abstract

Construction projects are getting more complex and larger-sized with a high economic growth rate and development of new construction technologies. In addition, interests and demands on standards of construction quality are further increasing. This trend requires more systematic and a higher level of construction quality management. While the government has strengthened the regulations for quality assurance, many quality problems have repeatedly occurred mainly due to lack of recognition for quality management and quality control systems. To address this issue, this paper aims to suggest quality management improvement scheme through analyzing 3,443 nonconforming items identified during inspection of 393 construction sites from March 2012 to October 2014. The quality management improvement scheme suggested in this research is expected to prevent quality problems and defects and thus improve construction performances.

최근 국내 건설 산업은 높은 경제성장률과 신기술 도입 등으로 인하여 대형화, 초고층화, 첨단화가 되어가고 있으며, 건설 품질에 대한 사용자의 관심과 요구 수준은 더욱 높아지고 있다. 이는 과거의 양적인 성장위주에서 벗어나 시장변화에 능동적으로 대처할 수 있는 한층 더 체계적이고 수준 높은 품질관리의 필요성이 요구된다고 할 수 있다. 정부는 이러한 시대적 요구사항을 반영하여 건설공사의 시공 및 사용재료에 대한 적정성 여부와 부실시공 방지 등 품질확보를 위한 점검을 강화하고 있다. 그러나 이와 같은 점검 강화에도 불구하고 품질관리에 대한 인식 부족 및 형식적인 품질관리 운영 등으로 인하여 많은 문제점이 발생되고 있으며, 품질관리 점검 시 반복적이고 지속적으로 지적사항이 발생되고 있다. 따라서 본 연구에서는 반복적인 지적사항을 줄이고, 부적절한 품질관리와 부실시공을 방지하기 위해 서울시 품질시험소에서 2012년 3월부터 2014년 10월까지 393개 건설현장의 품질관리 적정성 확인 점검을 통해 도출한 지적사항 3,443건을 심층 분석하여 실효성 있는 현장 품질관리 개선방안을 제시하고자 한다. 본 연구에서 제안한 현장 품질관리의 개선방안을 통해 부적절한 품질관리와 부실시공의 방지, 반복적이고 지속적으로 나타나는 지적사항의 감소, 현장의 품질관리 업무향상과 같은 개선효과가 있을 것으로 기대된다.

Keywords

References

  1. Bae, D. G., Kim, K., and Kim, J., (2005). "A Cluster Analysis of the Audit Result on Quality Management System in Architectural Design and Engineering Firms", Korean Journal of Construction Engineering and Management, KICEM, 6(2), pp. 120-128.
  2. Bae, D. G., (2007). "Improving Quality by Managing ISO 9000 Audit Nonconformity in Korean Construction Industry" Ph. D. Dissertation, Hanyang Univ.
  3. Choi, B. J., Park, J. M., Choi, S. W., and Choi, H., (2007). "The Improvement Plan of Quality and Organization Management through the Survey of Actual Condition in Construction Work," Journal of Architectural Institute of Korea, AIK, 8(1), pp. 689-694.
  4. Choi, D. S., (2002). "The Quality Management System of the Road Construction Project : the Problems and Recommendations," MS thesis, Chung-Ang Univ.
  5. Construction Economy Research Institute of Korea (CERIK), (2004). A Study on Outsourcing of Quality Inspection/Testing Activities in Construction Works, Ministry of Land Infrastructure and Transport.
  6. Jeon, B. H., (2005). "A Study on the Regulation Improvements for the Efficiency of Quality Control in Construction," MS Thesis, Chung-Ang Univ.
  7. Ji, S., Cha, Y., and Han, S., (2015). "A Correlation Analysis of Influence Factors of Nonconformity in Construction Projects," Korean Journal of Construction Engineering and Management, KICEM, 16(2), pp. 21-28. https://doi.org/10.6106/KJCEM.2015.16.2.021
  8. Kang, H. J., (2007). "A Study on the Practical Applications Improvements of Quality Management System," MS Thesis, Inha University.
  9. Kang, H. K. (2004). "A Study on Improving Human Resource Operation of Quality Management System in Apartment-House Projects," MS Thesis, University of Seoul.
  10. Kim, D. K. (2013). "The Study on Improving Methods of ITP(Inspection and Test Plan) to Enhance the Connectivity on the Quality Management Information of the Construction Project," MS Thesis, Chung-Ang Univ.
  11. Lee, J. Y. (2008). "A Study on Classification of Quality Cost Elements in Construction," Ph. D. Dissertation, Dong-A Univ.
  12. Park, H. Y. (2010). "A Study on the Improved Quality Management System for Quality Assurance on Construction Site," MS Thesis, GyeongSang National Univ.
  13. Park, Y. C. (2008). "A Study on the Scheme Activating Construction Quality Management System based on ISO 9000s," MS Thesis, Chung-Ang Univ.