References
- 박일석, 이칠기, "반도체 확산공정에서 켄베이어의 적정속도와 길이를 구하는 시뮬레이션," 한국시뮬레이션학회논문지, 11(3), pp. 59-65, 2002.
- 정재우, 서정대, "차세대 반도체 펩을 위한 육각형 물류 구조의 설계, 대한산업공학회지," 36(1), pp. 42-51, 2010.
- 채종인, 박양병, "시뮬레이션 모델을 이용한 K회사 반도체패키지 공정의 생산량증가를 위한 연구," 한국시뮬레이션학회논문지, 19(1), pp. 1-11, 2010.
- 허특, 문덕희, 박철순, 장병림, "AHP를 활용한 반도체부품 생산공정 시뮬레이션 연구," 한국시뮬레이션학회논문지, 18(2), pp. 65-75, 2009.
- 황학, 작업관리론, 영지문화사, 서울, 대한민국, 2005.
- Braglia, M., Frosolini, M. and Zammori, F., "Overall equipment effectiveness of a manufacturing line (OEEML) : An integrated approach to assess systems performance," Journal of Manufacturing Technology Management, vol. 20, no. 1, pp. 8-29, 2009. https://doi.org/10.1108/17410380910925389
- Huang, S.H., Dismukes, J.P., Shi, J., Su, Q., Razzak, M.A., Bodhale, R. and Robinson, D.E., "Manufacturing productivity improvement using effectiveness metrics and simulation analysis," International Journal of Production Research, vol. 41, no. 3, pp. 513-527, 2003. https://doi.org/10.1080/0020754021000042391
- Lau, H-S. and Martin, G.E., "The effects of skewness and kurtosis of processing time s in unpaced lines," International Journal of Production Research, vol. 25, no. 10, pp. 1483-1492, 1987. https://doi.org/10.1080/00207548708919927
- Macnnes, R. L., The lean enterprise memory jogger, GOAL/QPC, U.S.A. 2002.
- Moon, D.H., Shin, K.W., Park, C.S. and Kim, D.S., "A manufacturing system simulation of semiconductor packaging substrate," Proceedings of 2009 SpringSIM, San Diego, U.S.A., pp. 283-288, 2009.
- Nakajima, S., Introduction to TPM: total productive maintenance, Productivity Press, Cambridge, March 1988.
- Powell, S.G. and Pyke, D.F, "An empirical investigation of the two moment approximation for production lines," International Journal of Production Research, vol. 32, no. 5, pp. 1137-1157, 1994. https://doi.org/10.1080/00207549408956992
- Ron, A.J. and Rooda, J.E., "Equipment effectiveness : OEE revisited," IEEE Transactions on Semiconductor Manufacturing, vol. 18, no. 1, pp. 190-196, 2005. https://doi.org/10.1109/TSM.2004.836657
- Ron, A.J. and Rooda, J.E., "OEE and equipment effectiveness : an evaluation," International Journal of Production Research, vol. 44, no. 23, pp. 4987-5003, 2006. https://doi.org/10.1080/00207540600573402
- Wang, T.U and Pan, H.C., "Improving the OEE and UPH data quantity by automated data collection for the semiconductor assembly industry," Expert Systems with Application, vol. 38, no. 5, pp. 5764-5773, 2011. https://doi.org/10.1016/j.eswa.2010.10.056
- Zhang, H., Jiang, Z., and Guo, C., "An optimized dynamic bottleneck dispatching policy for semiconductor wafer fabrication," International Journal of Production Research, vol. 47, no. 12, pp. 3333-3343, 2009. https://doi.org/10.1080/00207540701805638
- http://en.wikipedia.org/wiki/Overall_equipment effectiveness
Cited by
- A Case Study on Productivity Improvement by a Discrete Event-Driven Simulation System vol.38, pp.4, 2015, https://doi.org/10.11627/jkise.2015.38.4.149
- A Comparison of the Effects of Worker-Related Variables on Process Efficiency in a Manufacturing System Simulation vol.38, pp.1, 2013, https://doi.org/10.5307/JBE.2013.38.1.033