Construction Monitoring for Steel Truss Bridge Widening Works

강 트러스교 확장공사시 시공중 계측

  • 이창수 (서울시립대학교 토목공학과) ;
  • 장정환 ((주)이제이텍) ;
  • 이장석 ((주)현대건설 기술연구소 토목구조팀) ;
  • 김남홍 (서울시립대학교 토목공학과)
  • Received : 2004.07.16
  • Published : 2005.04.30

Abstract

This study examines the stability of Sungsu bridge which was issued nine years ago because of its collapse accident and now is on the progress of extension work in each construction stage by construction monitoring system. From this study, the measured value in each construction stage of anchorage truss and suspended truss shows the agreement with the analytical values up to 60~110 percents, and the elements' stresses emanating from the pre-loading stage, are also similar to the analytical value. Regarding these results, it is expected that each member has enough stiffness and the construction condition is satisfactory. In addition, it is expected that the transverse members and sway bracing bolts integrate completely the existing truss and new attached truss as a one body from the result of the vibration test to find out the integration rates.

본 연구에서는 과거 붕괴사고로 인해 큰 사회적 이슈가 되었고 현재 확장공사가 진행 중인 성수대교를 대상 구조물로 하여 시공중 계측을 통한 각 시공단계별 안정성을 확인하였다. 그 결과, 앵커리지 트러스와 서스펜디드 트러스 가설단계별로 측정된 계측값은 구조해석값의 60~110%이고, 선하중 재하에 의해 부재에 발생하는 응력이 해석값과 유사하게 나타났으므로 각각의 부재는 충분한 강성을 가지고 있고 시공 상태도 양호한 것으로 판단되었다. 기존부와 확장부 간의 일체화 여부를 파악하기 위하여 실시한 진동변위 측정 결과, 기존부와 확장부는 횡방향 부재 및 스웨이 브레이싱의 볼트체결로 인해 일체화 된 것으로 확인되었다.

Keywords