• 제목/요약/키워드: web-based construction management system

검색결과 227건 처리시간 0.027초

Web기반을 활용한 자재 조달 시스템 개선방안 (A Study on the system Applied Air-Vent to Complex Lay Poly-Urethane Waterproofing Material and Air-Permeability Buffer Sheet of Disconnection Type)

  • 이임배;김홍현;윤수원;민경석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.141-145
    • /
    • 2008
  • Because of world financial crisis, The Korea domestic construction industry has been damaged hugely on material supplying work. A current domestic material supply system can't react properly on a great rise of foreign exchange rate and raw material price, so the system has a problem which is not properly supplying material. To solve this problem, a more innovative material supply work system is seriously needed than ever. So this study wants to improve material supply system for supplying material right time, right place through applying a web-based system. Applying this, overall process of material-supply-work can be done on a web-based system for immediately understanding change of ordering and warehousing by material-supply-schedule to a domestic construction field.

  • PDF

A SIMULATION APPROACH TO CONSTRUCTION MANAGEMENT EDUCATION

  • Muhammad Imran Ghatala ;Sang-Hoon Lee ;Lingguang Song
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.962-967
    • /
    • 2005
  • Construction management requires decision-making skills. Main approaches to training construction management students are: (1) analyzing sample situations involving decision-making; and (2) teaching logical decision-making procedures. The absence of 'pressure' factors in these approaches has significant impacts on the success of the training. The approaches also lack 'dynamic' effects that help create a spontaneous plan for construction projects where unforeseen changes and interruptions may occur. To minimize the adverse effects of the existing approaches, this paper proposes a framework for developing a web-based training system. The application is delivered as a game involving decision-making on the student's part in response to developments at the job-site, and where one student competes against another in an attempt to simulate a real-world scenario.

  • PDF

차세대 스마트형 PMIS 시스템 개발 (The Development of Next Generation Smart PMIS System)

  • 박경모;임철우;김창덕;정형석
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.117-130
    • /
    • 2013
  • 최근 건설 산업의 경향은 대형화, 국제화 되고 발주자는 사업수행기간의 단축을 요구하는 환경 속에서 건설 현장의 다양한 업무내용을 효과적으로 관리하는 일은 매우 어려운 과제가 되어가고 있다. 이러한 문제를 해결하기 위한 대안으로 선진외국에 2000년대 초부터 지속적으로 공정관리/시공관리/자원관리/노무관리/문서관리 등의 다양한 공사정보를 상호 교환할 수 있는 Web 기반의 PMIS 개발에 주력해왔다. 하지만, 최근 들어 스마트폰과 태블릿 PC와 같은 IT기기의 활발한 보급과 더불어 현장에서도 클라이언트 PC를 통한 PMIS 접근 방식보다 신속하게 다양한 공정변화에 신속히 대응할 수 있는 스마트형 PMIS 개발에 대한 기대가 높아지고 있는 시점이다. 따라서, 본 연구는 기존 Web 기반의 PMIS를 현장 작업자가 공사현장 또는 이동 중에도 태블릿 PC와 스마트폰과 연계하여 활용하는 차세대 스마트형 PMIS를 개발하고자 하며, 이러한 차세대 스마트형 PMIS의 개발 과정과 개발된 주요기능을 소개하는 데에 목적이 있다.

중소건설사를 위한 클라우드 컴퓨팅 기반 EHS 통합관리시스템 프레임워크 개발 (The Framework Development of Cloud Computing-based Integrated EHS Management System for Small and Medium Construction Companies)

  • 서광규
    • 대한안전경영과학회지
    • /
    • 제12권4호
    • /
    • pp.139-143
    • /
    • 2010
  • The small and medium construction companies are facing potential EHS(Environment, Health & Safety) of major accidents to cause casualties or a financial loss and increasing social responsibility. So, they have to voluntarily accomplish the EHS management system rather than passively with regard to EHS regulation. In this study, the framework of integrated EHS management system is developed based on cloud computing, and construction companies are to materialize self-regulation EHS process of construction workplace and to standardize the total EHS business process using the developed system. The proposed system also provides risk analysis, education/control and continuous improvement for EHS tasks and users can easily access the system on the web at a low price through cloud computing service. Eventually, the integrated system contributes to the managerial improvement by minimizing economic and physical loss caused by construction accidents.

적정 흙막이 공법 선정을 위한 웹 기반 의사결정 지원 시스템 (A Web-based Decision Support System for Selecting Optimal Retaining Wall Systems)

  • 김혜원;최명석;이강
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.694-697
    • /
    • 2008
  • 건설 생애 전 주기 중에서 기획단계의 지반 조사로 시작되는 흙막이 공법의 선정은 잘못 선정될 경우 해당 프로젝트의 공사비와 공기에 끼치는 영향이 매우 크다. 그렇기 때문에 공법 선정의 요인 및 프로세스에 관련된 연구가 많이 발표되었지만 일반인들의 활용이 어려워 실용화되지 못하고 있다. 본 연구에서는 본 연구의 선행연구에서 개발한 흙막이 공법 선정 프로세스에 기반하여 웹 기반 의사결정 지원시스템을 개발하였다. ASP.NET을 이용하여 사용자들의 접근성을 높이고 자료의 보완 및 수정이 용이한 웹 기반 시스템인 Dr. Underground로 발전시켰다. 이 의사결정 지원 시스템은 일반인들이 쉽게 접근하여 건축물 기본요구 사항과 대지 조건, 인접 대지 조건을 입력하면, 해당 프로젝트에 적절한 흙막이 공법을 선정해주고 그에 대한 상세 정보를 제공해준다.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

효율적인 VE워크숍을 위한 웹기반 VE지원시스템 개발에 대한 기초연구 (Development of Web-Based VE Supporting System for Effective Workshop)

  • 임종권;김성훈;이민재
    • 한국건설관리학회논문집
    • /
    • 제15권2호
    • /
    • pp.71-78
    • /
    • 2014
  • 국내 건설산업의 효율성 제고와 건설프로젝트의 가치를 향상시키기 위해 VE제도가 도입 된지도 30여년의 시간이 지났으나 국내 현실은 프로젝트의 기능분석 과정에 많은 시간과 노력을 투자하지 못하고 있으며, 이를 바탕으로 해야 할 전문가 협업워크숍 부분이 부족하여 창의적인 아이디어의 도출이 부족하게 되고 결과적으로 VE활동은 설계검토와 비용절감 부분에 초점이 맞추어지는 것이 현실이다. 이를 개선하기 위해서는 체계화된 VE Job Plan 프로세스와 워크숍 협업 전산시스템이 필요하다. 본 연구에서는 프로젝트 의사결정을 위한 기능분석 및 FAST도 전산모델, 웹기반 VE워크숍 수행 및 프로젝트 의사결정프로그램을 제안하였으며, 이는 기능향상 및 비용절감을 목적으로 하는 다양한 분야에서 활용이 가능한 시스템이며 객관적인 성능 및 기능분석을 실행하여 다양한 이해관계에 놓인 의사결정자의 신속한 의사결정을 지원하며 VE업무 효율화를 극대화시킬 수 있으리라 기대된다.

웹기반 굴착 영향도 예측 및 위험도 평가 시스템 개발 (Development of web-based system for ground excavation impact prediction and risk assessment)

  • 박재훈;이호;김창용;박치면;김지은
    • 한국터널지하공간학회 논문집
    • /
    • 제23권6호
    • /
    • pp.559-575
    • /
    • 2021
  • 최근지반굴착 공사의 증가로 인해 지반침하사고 발생 가능성은 점점 높아지고 있지만, 지하안전관리에 관한 특별법 제정 등 제도적인 강화에도 불구하고 지반침하사고를 근본적으로 예방하는 것은 매우 어려운 실정이다. 도심지 지반굴착의 여러 사례를 살펴보면, 굴착 전에 다양한 정보를 활용해 예측했던 지반침하 거동특성은 시공 중에 확인된 결과와 무시할 수 없을 정도의 차이를 보이고 있다. 이러한 원인은 지반조건의 변화, 지반침하 예측방법의 한계, 설계와 착공 시기의 계절적인 차이, 현장여건을 고려한 공법의 변경 및 기타 다양한 사유에 의한 장기간의 공사 중지 등의 현장 여건 변경이 주요 원인으로 고려될 수 있다. 이에 대응하기 위한 방안으로, 다양한 시공정보를 통한 안전관리시스템 도입을 예를 들 수 있으나 아직까지는 굴착으로 인한 영향 및 위험도를 예측할 수 있는 시스템은 부재한 실정이다. 본 연구에서는 도심지 굴착사업의 설계·시공에 있어서 지반침하와 주변 구조물에 미치는 굴착 영향도를 사전에 예측하고 위험도 평가를 할 수 있는 시스템을 개발하였으며, 과거에 획득된 현장계측 데이터를 통해 현재 및 장래 지하수위와 침하량 등을 예측할 수 있는 시계열 분석기법과 지반공학 데이터 시각화(Geotechnical Data Visualization, GDV) 기술을 적용하였다. 본 연구에서 개발된 웹기반 평가시스템을 통해 과거에 획득된 데이터를 이용하여 현재 및 장래 지하수위 변화 및 침하량 예측 등 굴착으로 인한 위험도 예측 및 관리가 가능할 것으로 기대된다.

Assessment of ASP-PMIS Quality in Korea

  • Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권3호
    • /
    • pp.9-17
    • /
    • 2011
  • Web-based PMIS (Project Management Information System) has played significant role in construction management processes in Korea. As the use of web-based PMIS increases, regular quality assessment to identify user's requirements is necessary. However, there have been rare research efforts for quality assessment of web-based PMIS. This study aims to assess the quality of web-based PMIS, especially ASP-PMIS (Application Service Provider based PMIS) that is widely used in Korean construction industry. The assessment factors of ASP-PMIS quality were adopted from previous research and empirically confirmed using exploratory factor analysis. ISA (Importance-Satisfaction Analysis), which is a variation of original IPA (Importance-Performance Analysis), were selected for the assessment and analysis method in this research. A total of 253 completed questionnaires, composed of 23 assessment items, were collected from the ASP-PMIS users in Korea (construction managers and constructors), and they were used to analyse the quality of the systems. Some possible contributions of this research are: it introduces a simple and easy-to-use tool for assessing the quality of ASP-PMIS with a set of quality assessment factors that are selected from previous researches and empirically tested; it provides the quality assessment results of ASP-PMIS in Korea so that ASP-PMIS providers in Korea can understand the users' opinion on their systems; it also identified that the urgent factors that require immediate attention to improvement. However, further researches are to be required on the following areas: enhancing the quality assessment factors in terms of their relation to the success of ASP-PMIS and to the users' performance; assessing and analyzing the quality of individual ASP-PMIS; establishing continuous improvement systems institutionally and instrumentally.

건설정보 분류체계에 의한 설계도서 통합 관리 방안 (Integrated Management System of Construction Documents and Drawings by Construction Information Classification System)

  • 서정헌;박성식;강인석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.589-592
    • /
    • 2003
  • 국내에서는 건설공사지원정보체계의 활용을 촉진하고, 건설공사의 제반 단계에서 발생하는 정보의 상호교류를 촉진하기 위하여 통합건설정보 분류체계를 제안하고 있으나 효율적인 활용방안에 대한 연구의 미흡과 건설공사의 중요한 정보인 설계도서의 체계적인 통합관리를 위한 데이터베이스 (Database : DB) 중심의 전산관리시스템의 구축미비로 인하여 많은 문제점을 야기하고 있다. 이에 본 연구에서는 건설정보 분류체계의 활용과 설계도서의 체계적인 통합관리를 위한 방안으로 데이터베이스 설계하고 이를 웹(Web)기반에서 관리할 수 있는 설계도서 통합관리 시스템을 구축 하였다.

  • PDF