• Title/Summary/Keyword: warranty

Search Result 323, Processing Time 0.03 seconds

Warranty Cost Analysis and Its Application to Replacement Policy for a Repairable Warranted Item (수리가능한 품목의 보증비용분석과 응용)

  • Son, Eun-Il;Suh, Yong-Sung;Park, Young-Taek
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.3
    • /
    • pp.54-65
    • /
    • 1994
  • A hybrid warranty policy for a repairable item is considered. Assuming that minimal repairs ar e performed for failures during warranty period, present worth of warranty cost is derived from a supplier's viewpoint. An optimal preventive periodic replacement policy for the case is also derived from a user's viewpoint Numerical examples are presented in order to explain the results.

  • PDF

A Study on Performance Warranty Criteria for Expressway Jointed Concrete Pavements (고속국도 줄눈 콘크리트 포장 성능보증 기준 연구)

  • Yeo, Hyun-Dong;Ahn, Deok-Soon;Suh, Young-Chan;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.13 no.3
    • /
    • pp.65-73
    • /
    • 2011
  • Recently, researches to introduce the performance warranty contract are in progress for quality improvement of road pavements. The performance warranty contract is a type of contract in which contractors guarantee to maintain certain level of performance during a period from completion of construction. The contract use in Europe and the U.S is being increased because it has been known to contribute to improvement of structure quality, reduction of life cycle cost, development of construction techniques, and etc. The research on performance indicators, threshold values, and warranty durations is essential to effectively introduce the contract in Korea. In this study, literatures on the performance warranty contract for concrete pavements of the Minnesota, Indiana, and Florida of the U.S. were reviewed. Major distresses influencing the pavement performance were investigated and analyzed in the jointed concrete pavement sections of 21 Korean expressway routes to be compared to the performance indicators, threshold values, and warranty durations of the states. More accurate comparison is expected by investigation in planned sections for a long time.

Performance Indicator and Threshold Value of National Highway Jointed Concrete Pavements (일반국도 줄눈 콘크리트 포장의 성능인자와 임계한도)

  • Yeo, Hyun Dong;Seo, Youngguk;Suh, Young Chan;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3D
    • /
    • pp.279-288
    • /
    • 2010
  • Recently, researches on the performance warranty contracting has been going on to improve construction quality in road pavement area. The performance warranty contracting gives construction companies opportunity to select materials and methods freely while asks them to maintain a certain level of performance during a given period. To introduce the performance warranty contracting in Korea, lots of research results on performance indicator and threshold value of asphalt pavement have been made to be included in the warranty specification. However, research effort on the performance indicator and threshold value of concrete pavement which is commonly constructed in expressway and national highway has not been enough. In this study, the warranty duration, performance indicator, and threshold value of the concrete pavement were investigated by reviewing literatures on cases of the performance warranty contracting in European countries and states of the US. Major distresses influencing the performance of jointed concrete pavement were investigated and analyzed to be compared to the warranty duration, performance indicator, and threshold value of foreign countries.

Bayesian Maintenance Policy for a Repairable System with Non-renewing Warranty

  • Han, Sung-Sil;Jung, Gi-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.13 no.1
    • /
    • pp.55-65
    • /
    • 2002
  • In this paper we present a Bayesian approach for determining an optimal maintenance policy following the expiration of warranty for a repairable system. We consider two types of warranty policies : non-renewing free replacement warranty (NFRW) and non-renewing pro-rata warranty (NPRW). The mathematical formula of the expected cost rate per unit time is obtained for NFRW and NPRW, respectively. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal maintenance policy. We illustrate the use of our approach with simulated data.

  • PDF

Cost analysis for minimal repair model in stepdown warranty policy (단계별 보증제도에서 응급수리 모형에 관한 보증비용 분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.16 no.27
    • /
    • pp.21-25
    • /
    • 1993
  • This article is concerned with cost analysis in stepdown warranty policy. The repair of item is divided into two policies. First, perfect repair can be considered that the failurerate is the same as new item. Second, minimal repair is shown that the failurerate is the same as just before the item failure In this paper, the minimal repair model is introduced. And it is assumed that manufacturers repair the item failure within the warranty periodn. But warranty period is not renewed at all. At this point the warranty cost is analyzed in manufacturer's and customer's point of view.

  • PDF

A Study on a Reliability Prognosis based on Censored Failure Data (정시중단 고장자료를 이용한 신뢰성예측 연구)

  • Baek, Jae-Jin;Rhie, Kwang-Won;Meyna, Arno
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.18 no.1
    • /
    • pp.31-36
    • /
    • 2010
  • Collecting all failures during life cycle of vehicle is not easy way because its life cycle is normally over 10 years. Warranty period can help gathering failures data because most customers try to repair its failures during warranty period even though small failures. This warranty data, which means failures during warranty period, can be a good resource to predict initial reliability and permanence reliability. However uncertainty regarding reliability prediction remains because this data is censored. University of Wuppertal and major auto supplier developed the reliability prognosis model considering censored data and this model introduce to predict reliability estimate further "failure candidate". This paper predicts reliability of telecommunications system in vehicle using the model and describes data structure for reliability prediction.

Maintenance Policies Following the Expiration of Two-Dimensional Free Replacement Warranty (2차원 무료 보증이 종료된 이후의 보전정책)

  • Kim, Ho-Gyun
    • Journal of Applied Reliability
    • /
    • v.15 no.1
    • /
    • pp.6-11
    • /
    • 2015
  • Maintenance plays an important role in keeping product availability, reliability and quality at an appropriate level. In this paper, two-types of maintenance policies are studied following the expiration of two-dimensional (2D) free replacement warranty. Both the fixed-maintenance-period policy and the variable-maintenance-period policy are based on a specified region of the warranty defined in terms of age and usage where all failures are minimally repaired. An accelerating failure time (AFT) model is used to allow for the effect of usage rate on product degradation. The maintenance model that arises following the expiration of 2D warranty is discussed. The expected cost rates per unit time from the user's point of view are formulated and the optimal maintenance policies are determined to minimize the expected cost rate to the user. Finally numerical examples are given to illustrate the optimal maintenance polices.

Optimal replacement policy following the expiration of payable RRNMW (유료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.409-417
    • /
    • 2011
  • In this paper, we consider a replacement model following the expiration of warranty. In other words, this paper proposes the optimal replacement policy for a repairable system following the expiration of payable renewing replacement-non-renewing minimal repair warranty. The expected cost rate per unit time from the user's perspective is used to determine the optimality of the replacement policy. Thus, we derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purpose.

A Bayesian Approach to Replacement Policy with Extended Warranty (연장된 보증이 있는 교체정책에 대한 베이지안 접근)

  • Jung, Ki Mun
    • Journal of Applied Reliability
    • /
    • v.13 no.4
    • /
    • pp.229-239
    • /
    • 2013
  • This paper reports a manner to use a Bayesian approach to derive the optimal replacement policy. In order to produce a system with minimal repair warranty, a replacement model with the extended warranty is considered. Within the warranty period, the failed system is minimally repaired by the manufacturer at no cost to the end-user. The failure time is assumed to follow a Weibull distribution with unknown parameters. The expected cost rate per unit time, from the end-user's viewpoints, is induced by the Bayesian approach, and the optimal replacement policy to minimize the cost rate is proposed. Finally, a numerical example illustrating to derive the optimal replacement policy based on the Bayesian approach is described.

Replacement Model Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil;Lim, Jae-Hak
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.4
    • /
    • pp.889-901
    • /
    • 2003
  • In this paper, we consider the optimal replacement policies following the expiration of the combination warranty. The combination warranty can be divided into the renewing combination warranty and the non-renewing combination warranty. The criterion used to determine the optimal replacement period is the overall value function based on the expected cost and the expected downtime. Thus, we obtain the expected cost rate per unit time and the expected downtime per unit time for our model. And then the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF