Korean Journal of Computational Design and Engineering
/
v.19
no.3
/
pp.236-244
/
2014
Presented in the paper is a reservation based dispatching rule to achieve the on-time delivery in system LSI (large scale integrated circuit) semiconductor fabrication (FAB) with urgent orders. Using the proposed reservation based dispatching rule, urgent lots can be processed without waiting in a queue. It is possible to achieve the on-time delivery of urgent orders by reserving a proper tool for the next step in advance while urgent lots are being processed at the previous step. It can cause, however, tardiness of normal lots, because the proposed rule assign urgent lots first. To solve this problem, the proposed rule tries to find the best tool for the reservation in the tool group, which can minimize idle time, and the reservation rule is applied at all tools except for photolithography tools (bottleneck). $MOZART^{(R)}$ which is developed by VMS solutions are used for simulation experiments. The experimentation results show that the reservation based dispatching rule can achieve the on-time delivery of normal lots as well as urgent lots.
Proceedings of the Korea Society for Simulation Conference
/
2001.10a
/
pp.435-439
/
2001
In many make-to-order production systems customers ask due date confirmed and kept. Unexpected urgent orders from valuable customers often requires short lead times, which causes existing orders in the production schedule to be delayed so that their confirmed due dates cannot be met. This Imposes significant uncertainty on the production schedule in a supply chain. In this paper, we propose a new concept of capacity reservation as a viable tool for due date promising and suggest its operational alternatives. Simulation results show that the reserved capacity scheme appears to outperform simple FCFS scheduling policy in terms of the number of valuable urgent orders accepted and total profit attained.
Journal of Korean Society of Industrial and Systems Engineering
/
v.24
no.64
/
pp.53-62
/
2001
In make-to-order manufacturing, if orders are processed and promise first-served base, then the urgent orders from important customers in .practice, orders are not confirmed upon receipt; and delayed as uncertainty of due date causes significant waste of cost and time. propose a new concept of reserved capacity as an alternative to accommodate the urgent orders from important customers, while the due dale of all of orders arrival; and suggest a flew operational policies.
Kim, Nae-Heon;Noh, Seung-Jong;Wang, Gi-Nam;Rim, Suk-Chul
IE interfaces
/
v.13
no.3
/
pp.396-404
/
2000
For most order-based production, it is important to meet urgent orders from important customers while maintaining high on-time delivery rate for successful supply chain management. In this paper, we propose an approach and a structure of planning system to implement Capable-To-Promise which promises the delivery time to the received order. We suggest and compare a few alternative order receiving policies for CTP.
Journal of the Institute of Electronics Engineers of Korea CI
/
v.45
no.6
/
pp.122-130
/
2008
In many applications of wireless sensor networks, sensed data can be classified either normal or urgent data according to its time criticalness. Normal data such as periodic monitoring is loss and delay tolerant, but urgent data such as fire alarm is time critical and should be transferred to a sink with reliable. In this paper, by exploiting these data characteristics, we propose a novel energy-efficient data-aware routing protocol for wireless sensor networks, which provides a high reliability for urgent data and energy efficiency for normal data. In the proposed scheme, in order to enhance network survivability and reliability for urgent data, each sensor node forwards only urgent data when its residual battery level is below than a threshold. Also, the proposed scheme uses different data delivery mechanisms depending on the data type. The normal data is delivered to the sink using a single-path-based data forwarding mechanism to improve the energy-efficiency. Meanwhile, the urgent data is transmitted to the sink using a directional flooding mechanism to guarantee high reliability. Simulation results demonstrate that the proposed scheme could significantly improve the network lifetime, along with high reliability for urgent data delivery.
The Long-Term Care Hospital (LTCH) accreditation system was initiated in 2013 in the form of mandatory accreditation system in order to improve patient safety and the quality of medical service at LTCHs. By June 2016, the accredited LTCHs were 76.2%. This research was conducted to review the implementation process in the first cycle and to promote development of the second cycle of LTCH accreditation system. There are some changes which reinforced the accreditation standards, accreditation survey, and public access to accreditation results in order to strengthen patient safety in the first cycle LTCH accreditation system. LTCHs which participated in the accreditation system achieved certain outcomes in respect to patient safety and employee satisfaction. However, there are several urgent problems in placement criteria of night duty health care providers, reinforcement plans in the accreditation system, and incentives for accredited hospitals. In order to solve these problems, the most important thing is to clearly recognize the fact that the healthcare accreditation system is not the means for control and regulate hospitals but a system to induce hospitals to continue to strive for improvements in patient safety and medical service quality. In addition, it is required that LTCHs, accrediting agency and the Ministry of Health and Welfare compromise and cooperate to seek solutions every time issues related to the accreditation system arise.
Journal of Fisheries and Marine Sciences Education
/
v.21
no.3
/
pp.373-389
/
2009
The aims of this study are to examine urgent problems for reorganization into future-proof large purse seine fisheries in order to positively cope with rapidly changing domestic and foreign fisheries circumstances. First, this paper provides current situations of the large purse seine fisheries. The current situations of it are composed of fisheries influence such as vessel number, vessel power, and fisher number, use of resource and fishing places, and changes in products and sales of species caught by the large purse seine. Secondly, this paper reviews current problems of the large purse seine fisheries including cost reduction and increase of value added. Thirdly, this paper suggests basic development direction and countermeasures for strengthening competitiveness of the large purse seine fisheries. In conclusion, urgent problems of the larger purse seine fisheries can be summarized as inefficiency of distribution structures and retarded landing system and facilities as well as the worse of profitability according to shrink of fishing places, reduction of products, lack of workers, and increase in oil price. To solve the urgent problems, the large purse seine fisheries should be changed into an industry with low cost and high efficiency, and also need to introduce of new production system, strengthen autonomous management of natural resource, and increase in value added to products.
Journal of The Korea Institute of Healthcare Architecture
/
v.28
no.4
/
pp.61-69
/
2022
Purpose: In response to the rapid spread of COVID-19 in 2020, the government supported facilities and equipment through the 'Urgent Isolation Ward Expansion Project'. Design and remodeling of efficient negative pressure isolation facilities had to be done in a short period of time, and the performance gap between facilities was very large because the types of hospitals and wards of existing medical facilities were diverse. In order to secure the stability of isolation wards between medical facilities and reduce the facility gap, guidelines for planning isolation wards considering the diversity of each hospital should be appropriately presented. In consideration of these points, this study aims to provide basic data for future remodeling guidelines for each plan type of the negative pressure isolation ward first. Methods: We analyzed the plans before and after the change of 13 case hospitals that performed the urgent care bed expansion project for COVID-19 confirmed patients. Before the remodeling, the current status of the facility was analyzed according to the type of corridor, the location of the nursing station, and the location of the elevator. After remodeling, the flow of medical staff and patients, the flow of entry and exit of clean and contaminated items, and the space of negative pressure and non-negative pressure areas. Results: The ward type was divided into three types according to the corridor type and room arrangement: double loaded corridor type with two side wards, race track type with one side ward, and race track type with two side wards. Based on these three types, the standard floor plan type of the isolation ward was proposed in terms of the location of the elevator bank and Nurse station. Implications: When the existing general ward is converted into a negative pressure isolation ward, this study can be a basic data to present customized guidelines for each ward type.
Journal of The Korea Institute of Healthcare Architecture
/
v.29
no.4
/
pp.29-35
/
2023
Purpose: The 2015 Middle East Respiratory Syndrome (MERS) outbreak and the recent COVID-19 pandemic have highlighted the lack of negative pressure isolation rooms and the fragility of the healthcare system. The need for healthcare facility transformation for respiratory infectious diseases has become more prominent due to COVID-19, and the purpose of this study is to provide a foundation for the rapid, economical, and safe construction of negative pressure isolation wards. Methods: This study analyzes the current status of hospitals that have been converted to negative pressure isolation rooms, and provides architectural plans and examples to provide a reference for bedroom change. Research data of this study have been obtained by analyzing the drawings of negative pressure isolation wards of nationally designated inpatient treatment beds and urgent isolation beds. In addition, the relevant literature of urgent isolation beds has been analyzed to derive bedroom change type. Result: In this study, a total of 21 isolation bed conversion methods have been presented. Implications: In order to change efficiently from a general ward to an isolation ward, it is necessary to consider the actual hospital's infectious disease transmission patterns and facility conditions.
In order to solve scheduling, many techniques including optimization and heuristics methods have been proposed. However, these conventional approaches are usually inadequate to obtain a satisfactory solution because of a NP-Complete which requires extensive computation effort. The aim of this paper is to develop an expert system for job shop scheduling using an AI technique. Through this system, the user can choose one of several performances. If one performance is chosen, then the system solves a scheduling in order to satisfy that performance. Then, this system decides urgent job. This system can utilize production resources efficiently and minimize work-in-process inventories and tardy jobs.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.