• 제목/요약/키워드: upper dam

검색결과 217건 처리시간 0.027초

섬진강댐 상류 유역의 강우시 비점오염물질 유출 특성 (Characteristics of Non-point Pollutant Discharge from Upper Watershed of Seomjin Dam during Rainy Season)

  • 곽동희;유승준;김지훈;임익현;권지영;정팔진
    • 상하수도학회지
    • /
    • 제22권1호
    • /
    • pp.39-48
    • /
    • 2008
  • This study was carried out to investigate the characteristics of the pollutant discharge from non-point source and to estimate the unit loads of the pollutant discharge from the upper watershed of Seomjin Dam during rainy season. The upper watershed of Seomjin Dam is located in the middle of Jeonbuk province is formed two tributaries mainly. A sub-branch stream of those tributaries is Imsil stream of which flow rate is about 13% of the main stream of Seomjin reservoir normally. On the basis of measurement result in this study, the water quality of Imsil stream was fluctuated highly and the quantity of measured pollutant discharge was higher than the value calculated with the proportion of flow rate during dry season. On the contrary, during rainy season the mean values of flow rate and water quality were higher than the quartile according to the statistical analysis. That means rainfall can influence strongly on the water quality of the upper watershed of Seomjin reservoir. Among the several criteria of water quality, SS discharge was most sensitive to the flow rate variation of stream, which was fluctuated in proportion of rainfall, basically. It was evaluated the event mean concentration (EMC) of non-point source pollutants depending on rainfall events as well. Though the pollutant discharge unit of Imsil stream was lower than the main stream of Seomjin reservoir, the EMC value of Imsil stream was higher than the main stream of Seomjin reservoir.

Study of modified Westergaard formula based on dynamic model test on shaking table

  • Wang, Mingming;Yang, Yi;Xiao, Weirong
    • Structural Engineering and Mechanics
    • /
    • 제64권5호
    • /
    • pp.661-670
    • /
    • 2017
  • The dynamic model test of dam-reservoir coupling system for a 203m high gravity dam is performed to investigate effects of reservoir water on dynamic responses of dam during earthquake. The hydrodynamic pressure under condition of full reservoir, natural frequencies and acceleration amplification factors along the dam height under conditions of full and empty reservoir are obtained from the test. The results indicate that the reservoir water have a stronger influence on the dynamic responses of dam. The measured natural frequency of the dam model under full reservoir is 21.7% lower than that of empty reservoir, and the acceleration amplification factor at dam crest under full reservoir is 18% larger than that under empty reservoir. Seismic dynamic analysis of the gravity dams with five different heights is performed with the Fluid-Structure Coupling Model (FSCM). The hydrodynamic pressures from Westergaard formula are overestimated in the lower part of the dam body and underestimated in its upper part to compare with those from the FSCM. The underestimation and overestimation are more significance with the increase of the dam height. The position of the maximum hydrodynamic pressure from the FSCM is raised with the increase of dam height. In view of the above, the Westergaard formula is modified with consideration in the influence of the height of dam, the elasticity of dam on the hydrodynamic pressure. The solutions of modified Westergaard formula are quite coincident with the hydrodynamic pressures in the model test and the previous report.

중력식댐의 지진시 안전검토에 대한 뉴 패러다임 (New Paradigm on the Safety Check of Concrete Gravity Dams at Earthquake)

  • 배정주;김용곤;이지호
    • 한국안전학회지
    • /
    • 제24권6호
    • /
    • pp.86-92
    • /
    • 2009
  • In the safety check of gravity dams at earthquake, there have been two types of analysis conducted simultaneously; one is stability analysis and the other stress analysis. But those are essentially the same calculation other than the former considers the dams rigid, while the latter considers the dams' dynamic characteristics which results in the amplification of response acceleration on the upper part of dam body. In this paper, the identity of those two methods is verified by example calculation in terms of stability check of gravity dam. It can be concluded that if stress analysis were performed, stability check of gravity dam could be accomplished with the results from stress analysis, removing unnecessary present dual calculation practice.

강우 매트릭스를 활용한 댐 운영 조견표 개발에 관한 연구 (A Study on the Development of a Dam Operation Table Using the Rainfall Matrix)

  • 정창삼
    • 한국방재안전학회논문집
    • /
    • 제13권2호
    • /
    • pp.39-51
    • /
    • 2020
  • 최근 우리나라는 이상기후에 의한 국지성 호우의 빈도가 잦아지며 홍수피해가 증가하고 있다. 지난 2017년 7월 16일 충북지역에서 발생한 집중호우의 재현기간을 산정한 결과 괴산댐 상류지역에서 지속기간 2시간 기준 약 1,524년 빈도의 강우로 추정되었고, 당시 괴산댐 최고수위는 EL.137.60 m까지 상승하여 댐마루 높이(EL.137.65 m)까지 5 cm의 여유 밖에 없었다. 1957년 이후 62년 동안 운영된 괴산댐은 유역의 수문량 증가로 인한 대책마련이 필요하고, 단일 목적 댐인 발전전용 댐으로 개발되어 홍수조절 효과가 작으며, 별도의 홍수조절을 위한 치수시설물이 존재하고 있지 않아 상하류 지역 주민의 안전성 확보를 위한 신속한 의사결정을 위하여 효율화된 운영방안 마련이 필요하다. 본 연구에서는 홍수 예보시 신속한 의사결정을 목적으로 강우 매트릭스를 구성하고 각 조건별 댐 최고 수위를 사전에 산정하여 조견표를 작성한 후 상황 발생시 신속하게 조건에 해당하는 수위를 찾는 방식의 댐 운영방안을 제시하였다.

Experimental evaluation of crack effects on the dynamic characteristics of a prototype arch dam using ambient vibration tests

  • Sevim, Baris;Altunisik, Ahmet Can;Bayraktar, Alemdar
    • Computers and Concrete
    • /
    • 제10권3호
    • /
    • pp.277-294
    • /
    • 2012
  • The aim of the study is to determine the modal parameters of a prototype damaged arch dam by operational modal analysis (OMA) method for some damage scenarios. For this purpose, a prototype arch dam-reservoir-foundation model is constructed under laboratory conditions. Ambient vibration tests on the arch dam model are performed to identify the modal parameters such as natural frequency, mode shape and damping ratio. The tests are conducted for four test-case scenarios: an undamaged dam with empty reservoir, two different damaged dams with empty reservoirs, and a damaged dam with full reservoir. Loading simulating random impact effects is applied on the dam to crack. Cracks and fractures occurred at the middle of the upper part of the dams and distributed through the abutments. Sensitivity accelerometers are placed on the dams' crests to collect signals for measurements. Operational modal analysis software processes the signals collected from the ambient vibration tests, and enhanced frequency domain decomposition and stochastic subspace identification techniques are used to estimate modal parameters of the dams. The modal parameters are obtained to establish a basis for comparison of the results of two techniques for each damage case. Results show that approximately 35-40% difference exists between the natural frequencies obtained from Case 1 and Case 4. The natural frequencies of the dam considerably decrease with increasing cracks. However, observation shows that the filled reservoir slightly affected modal parameters of the dam after severe cracking. The mode shapes obtained are symmetrical and anti-symmetrical. Apparently, mode shapes in Case 1 represent the probable responses of arch dams more accurately. Also, damping ratio show an increase when cracking increases.

Ecological Impact Analysis of a Stream on the Dam Construction Using Species Biotic Index (SBI) as a Tool of Ecosystem Health Assessment

  • An, Kwang-Guk;Kim, Jai-Ku
    • 생태와환경
    • /
    • 제40권4호
    • /
    • pp.495-502
    • /
    • 2007
  • Species biotic index (SBI), based on a fish assemblage, was applied to a stream assessment using long-term ecological fish data set (1996 to 2001) in Boryong dam area, which is located in the mainstream of Ungchun Stream of Chungnam province, Korea. According to the methods of Hilsenhoff (1988), the scores of tolerance guild assigned 10 classes to each species by its habitat and feeding guild, but modified current 7 criteria to 5 scoring standards due to unclear borderline among species. Relative abundance in the species number of upper stream guilds was only 7% of the total, whereas the abundance in the species number of middle to downstream upper stream guilds was 64%. Mean SBI, based on dataset in Site 1 during 1995-2001 averaged 5.10, which was judged as a "good" condition by the rank criteria of SBI. Before the dam construction, mean SBI in the Site 1 was 4.61, indicating a "good" condition, but after the dam construction, mean SBI was 5.60, indicating a "fair" condition. Trajectory analysis in the Site 1 showed significantly (One-way ANOVA, $F_{6,21}=3.26$, p=0.02) different among years, reflecting the changes of fish composition and population density by the dam construction, whereas Site 2 showed no significant changes ($F_{6,21}=1.00$, P =0.45) difference among years. Mean SBI prior to the dam construction in the Site 3 was 4.52 but after the construction, the value was 6.30, indicating a distinct difference between the pre- and post-dam construction. Trajectory analysis at the Site 3 supported this fact: Values of SBI showed significantly ($F_{6,21}$=14.37, p<0.01) different. Mean SBI was 4.67 in the Site 4, indicating a "good" condition in the health and the health rank was same as the sampling sites 1, 2, and 4. Trajectory in the Site 4 showed no significant ($F_{6,21}=2.35$, p=0.07) difference among the years. Overall, our trajectory analysis indicated that three of four sampling sites (sites 1, 3, 4) showed significant decreases (n=7, p<0.05) and that the proportions of sensitive species declined evidently in the sites 1 and 2 and the tolerant species increased in the dam sites. Our outcomes may be used as a key data for diagnosis of the long-term ecological impact in the future in the watershed.

인공지반을 적용한 사교하는 사면에서의 터널 갱구부 설계 (The design of outlet in inter-cross slope with tunnel which it applied forming artificial ground)

  • 박철숙;곽한;이규탁;김봉재;윤용진;김희광
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1532-1548
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. The tunnel outlet was planned to be made after installing slope stabilization system on natural slope there. Generally, the tunnel outlet is made perpendicularly to the slope, but in this case, it had to be made obliquely to the slope for not interrupting flow of river. Because of excavation in condition of natural slope caused to deflecting earth pressure, the outlet couldn't be made. So, artificial ground made with concrete that it was constructed in the outside of tunnel for producing the arching effect which enables to make a outlet. We were planned tunnel excavation was carried out after artificial ground made. Artificial ground made by poor mix concrete of which it was planned that the thickness was at least 3.0m height from outside of tunnel lining and 30cm of height per pouring. Spreading and compaction was planned utilized weight of 15 ton roller machine. In order to access of working truck, slope of artificial ground was designed 1:1.0 and applied 2% slope in upper pert of it for easily drainage of water. In addition to, upper pert of artificial ground was covered with soil, because of impaction of rock fall from upper slope was made minimum. The tunnel excavation of the artificial ground was designed application with special blasting method that it was Super Wedge and control blasting utilized with pre-percussion hole.

  • PDF

남강댐 상류유역 수질관리를 위한 BMPs의 다목적 최적화 (Multi-objective Optimization of BMPs for Controlling Water Quality in Upper Basin of Namgang Dam)

  • 박윤경;이재관;김정숙;김상단
    • 한국물환경학회지
    • /
    • 제34권6호
    • /
    • pp.591-601
    • /
    • 2018
  • Optimized BMP plans for controlling water quality using the Pareto trade-off surface curve in upper basin of Namgang Dam is proposed. The proposed alternatives consist of BMP installation scenarios in which the reduction efficiency of non-point pollutants is maximized in a given budget. The multi-objective optimization process for determining the optimal alternatives was performed without direct implementation of a watershed model such as SWAT analysis, thereby reducing the time taken. The shortening of the calculation time further enhances the applicability of the multi-objective optimization technique in preparing regional water quality management alternatives. In this study, different types of BMP are applied depending on the land use conditions. Fertilizer input control and vegetative filter strip are considered as alternatives to applying BMP to the field but only control of fertilizer input can be applied to rice paddies. Fertilizer input control and vegetative filter strip can be installed separately or simultaneously in a hydrologic response unit. Finally, 175 BMP application alternatives were developed for the water quality management of the upper river basin of Namgang dam. The proposed application alternative can be displayed on the map, which has the advantage of clearly defining the BMP installation location.

Effect of Sirikit Dam Operation Improvement on water shortage situations due to the land use and climate changes from the Nan Basin

  • Koontanakulvong, Sucharit;Suthidhummajit, Chokchai
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.232-232
    • /
    • 2015
  • Land use and climate changes are the important factors to determine the runoff and sediment loads from the watershed. The changes also affected to runoff volume/pattern to the dam operation and may cause flood and drought situations in the downstream area. Sirikit Dam is one of the biggest dams in Thailand which cover about 25 % of the runoff into the Central Plain where the Bangkok Capital is located. The study aims to determine the effect of land use change to the runoff/sediment volume pattern and the rainfall-runoff-sediment relationship in the different land use type. Field measurements of the actual rainfall, runoff and sediment in the selected four sub-basins with different type of land use in the Upper Nan Basin were conducted and the runoff ratio coefficients and sediment yield were estimated for each sub-basin. The effect of the land use change (deforestation) towards runoff/sediment will be investigated. The study of the climate change impact on the runoff in the future scenarios was conducted to project the change of runoff volume/pattern into the Sirikit Dam. The improvement of the Sirikit Dam operation rule was conducted to reduce the weakness of the existing operation rules after Floods 2011. The newly proposed dam operation rule improvement will then be evaluated from the water shortage situations in the downstream of Sirikit Dam under various conditions of changes of both land use and climate when compared with the situations based on the existing reservoir operation rules.

  • PDF