The design of outlet in inter-cross slope with tunnel which it applied forming artificial ground

인공지반을 적용한 사교하는 사면에서의 터널 갱구부 설계

  • 박철숙 (한국수자원공사 수자원 연구원) ;
  • 곽한 (한국수자원공사 울산권 관리단) ;
  • 이규탁 (한국수자원공사 댐유역 관리처) ;
  • 김봉재 (한국수자원공사 댐유역 관리처) ;
  • 윤용진 (도화기술공사) ;
  • 김희광 (삼성물산(주) 신갈-호법확장공사)
  • Published : 2008.10.10

Abstract

The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. The tunnel outlet was planned to be made after installing slope stabilization system on natural slope there. Generally, the tunnel outlet is made perpendicularly to the slope, but in this case, it had to be made obliquely to the slope for not interrupting flow of river. Because of excavation in condition of natural slope caused to deflecting earth pressure, the outlet couldn't be made. So, artificial ground made with concrete that it was constructed in the outside of tunnel for producing the arching effect which enables to make a outlet. We were planned tunnel excavation was carried out after artificial ground made. Artificial ground made by poor mix concrete of which it was planned that the thickness was at least 3.0m height from outside of tunnel lining and 30cm of height per pouring. Spreading and compaction was planned utilized weight of 15 ton roller machine. In order to access of working truck, slope of artificial ground was designed 1:1.0 and applied 2% slope in upper pert of it for easily drainage of water. In addition to, upper pert of artificial ground was covered with soil, because of impaction of rock fall from upper slope was made minimum. The tunnel excavation of the artificial ground was designed application with special blasting method that it was Super Wedge and control blasting utilized with pre-percussion hole.

Keywords