• Title/Summary/Keyword: underground tunnel

Search Result 2,774, Processing Time 0.027 seconds

A Study on Fire Resistance Character of a Tunnel and an Underground Structure (터널 및 지하구조물의 내화특성에 관한 연구)

  • Yoo, Sang-Gun;Kim, Jung-Joo;Park, Min-Yong;Kim, Eun-Kyum;Lee, Jun-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.194-200
    • /
    • 2010
  • Recently, a longitudinal tunnel construction has increased because of subway construction extension, geomorphological effect and the development of construction Technologies etc. When the fire occurs in a tunnel and an underground structure, the many damage of human life and the economic losses are caused. In Korea, fire resistance character study of a tunnel and an underground structure is proceeding. However, when a concrete is exposed to high temperature, study of load carrying capacity reduction and stability evaluation for spalling of a concrete is not enough. Therefore in this study, fire resistance character of a concrete evaluated according to time heating temperature curve(RABT and RWS) and a result compared on virtual fire accident in order to apply fire scenario. Also this study performed thermo-mechanical coupled analysis of a FEM-based numerical technique and estimated fire-induced damage of a tunnel and an underground structure.

Blast vibration of a large-span high-speed railway tunnel based on microseismic monitoring

  • Li, Ao;Fang, Qian;Zhang, Dingli;Luo, Jiwei;Hong, Xuefei
    • Smart Structures and Systems
    • /
    • v.21 no.5
    • /
    • pp.561-569
    • /
    • 2018
  • Ground vibration is one of the most undesirable effects induced by blast operation in mountain tunnels, which could cause negative impacts on the residents living nearby and adjacent structures. The ground vibration effects can be well represented by peak particle velocity (PPV) and corner frequency ($f_c$) on the ground. In this research, the PPV and the corner frequency of the mountain surface above the large-span tunnel of the new Badaling tunnel are observed by using the microseismic monitoring technique. A total of 53 sets of monitoring results caused by the blast inside tunnel are recorded. It is found that the measured values of PPV are lower than the allowable value. The measured values of corner frequency are greater than the natural frequencies of the Great Wall, which will not produce resonant vibration of the Great Wall. The vibration effects of associated parameters on the PPV and corner frequency which include blast charge, rock mass condition, and distance from the blast point to mountain surface, are studied by regression analysis. Empirical formulas are proposed to predict the PPV and the corner frequency of the Great Wall and surface structures due to blast, which can be used to determine the suitable blast charge inside the tunnel.

A Case on Design and Construction of Tunnel for Under Passing an Underground Transformer Substation (지중변전실 하부통과를 위한 터널설계 및 시공사례)

  • 정동호;문상조;김선홍;이광제;석진호
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.11-18
    • /
    • 2001
  • This is a case history on design and cnostruction of tunnel for under passing an underground transformer substation. The original construction plan was cut & cover method to avoid blasting vibrations and displacements of facilities during the construction stages. But this plan was changed to tunnel because of the difficulties from construction period, cost and the required relocation site. As a results of tunnel construction, the relocation of transformer substation and replacements of transmission cables were not necessary. Therefore about 10 months of construction period and 3.5 billion wonts of construction cost were saved. Additionally, quantitative criterion for blasting was provided through the results of blasting vibration analysis.

  • PDF

Application of risk analysis and assessment considering tunnel stability and environmental effects in tunnel design (터널 안정성 및 환경성을 고려한 위험도 평가기법의 적용)

  • Kim, Young-Geun;Kim, Do-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2008
  • Recently, because of the various factors by uncertainty of underground, the risks in tunnelling have been occurred increasingly. Therefore, it is very important to estimate and control the risks considering geotechnical conditions for tunnel stability and environmental problems by tunnel construction. In this study, the risk analysis for tunnel stability was carried out by classifying the risk factors such as ground support capacity, ground settlement, the inflow of groundwater into the tunnel and the damage by the earthquake. Also, the risk assessment for the environmental problems was performed by calculating the vibration and noise by blasting and the drawdown of the groundwater level caused by tunnel construction. Each risk factor was evaluated quantitatively based on the probabilistic and statistic technique, then it was analyzed the distribution characteristic along overall tunnel site. Finally, it was evaluated that how much each risk factor influences on the construction cost with a period for tunnel construction, so it is possible to perform reasonable tunnel design which was capable of minimizing the risks in the tunnel construction.

  • PDF

Stability analysis of an existing tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel (복층터널의 분기터널 굴착에 따른 기존터널의 안정성 분석)

  • Kim, Han-eol;Kim, Jung-Joo;Lee, Jae-Kook;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.779-797
    • /
    • 2017
  • Recently, underground road construction is attracting attention because the ground transportation facilities in the urban area have reached the saturation level and traffic volume has increased and the air pollution has risen. Construction of underground roads is not only reduce trafficjam in downtown but also design the city eco-friendly, so existing roads as well as new roads go underground. It is essential to construct divergence tunnels that serve as IC (interchage) and JC (Junction) when constructing underpasses. Therefore, the analysis of the effect of the existing tunnel by the divergence tunnel should be considered. In this study, numerical analysis is performed to analyze the effect of existing tunnel on the excavation of the divergence tunnel. The divergence tunnels were set in 5 cases at $45^{\circ}$ intervals in the clockwise direction starting from the lower part of the existing tunnel. In each case, numerical analyses were carried out by using the DCM (Displacement Controlled Model) for applying the volume loss of 0.5%, 1.0% and 1.5%. As a result, when the volume loss increased, the effect on displacement, fracture range, and effect on stability increased as well. In addition, it was confirmed that the divergence tunnel located directly underneath is the weakest for the stability, and the case where the divergence tunnel is located diagonally rather than the vertical and horizontal direction is found to be vulnerable to displacement and lining destruction.

Estimation of Risk from Air Pollution in the Underground Highway Proposed to Construct in Seoul, Korea

  • Lee, Ki-Young;Yukio-Yanagisawa
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.9 no.E
    • /
    • pp.397-400
    • /
    • 1993
  • The possible air pollution problems in a proposed underground highway are discussed using carbon monoxide (CO) as an indicator. Carbon monoxide concentrations in the underground highway depend on several factors, including the size of tunnel, the number of automobiles, the CO emission rate, and the tunnel ventilation rate. Using the estimated values, CO concentrations in the underground highway can be predicted. Without proper ventilation system, CO concentration in the underground highway can be dangerous level. However, the cost of operating the mandatory mechanical ventilation system may be tremendouslyy high and may be technically unrealistic to implement. If the underground highway is constructed with proper ventilation system, a continuous air pollution monitoring system with alarming function must be installed to alert personnel of serious air pollution built up in the underground highway. Traffic must be restricted, whenever the inside air pollution levels exceed agreed values. Short distances between evacuation exits are necessary for emergency situations or malfunction of ventilation system.

Geotechnical Approach in Design and Construction of Underground Structures A Systematic Parameter Estimation (지하 공간 설계와 시공의 지반공학적 접근과 실무적용 -지반계수의 합리적 추정)

  • Lee, In-Mo;Kim, Dong-Hyeon
    • Geotechnical Engineering
    • /
    • v.12 no.2
    • /
    • pp.43-58
    • /
    • 1996
  • In spite of drastic development of underground technology too many uncertainties still exist in design and construction of underground structures. Estimation of ground parameters might be one of those uncertainties in design of underground structures. It is not an easy task to estimate the parameters reasonably well in advance in the design stage. The main purpose of this paper is the best parameter estimation in the underground structures. In order to estimate unknown model parameters from the in-eitu measurements as well as prior estimates, the Extended Bayesian Method(EBM) is utilized and implemented with Finite Element Program. The parameter estimation model utilized in this study is applied to two underground structures : the one Pusan subway tunnel: and the other Darlington intake tunnel in Canada, and the effectiveness of the proposed model is illustrated.

  • PDF

Three-dimensional Stability Analysis for an Underground Disposal Research Tunnel (지하처분연구시설에 대한 3차원 터널 안정성 해석)

  • 권상기;조원진
    • Tunnel and Underground Space
    • /
    • v.14 no.3
    • /
    • pp.188-202
    • /
    • 2004
  • If an underground research facility for the validation of disposal concept is constructed in KAERI, it is expected to have a thick weathered zone and varying surface topology. In this study, the influence of different geological conditions, tunnel slope, tunnel size, and sequential excavation is investigated by 3D mechanical analysis using FLAC3D. Around the tunnel, it is not expected to develop any plastic zone and the maximum stress might be as high as 5 ㎫. The maximum compressive stress will be developed at about 20 m to e dead end of the tunnel. There is no difference on stress and displacement distributions between the cases with and without sequential excavation. It is expected to have stress release in the roof and floor after the excavation of the tunnel. There is no significant influence of weathered zone size, tunnel size, and tunnel slope on the stress and displacement distributions. The modeling for the intersection shows the minimum factor of safety is above 3, when the in situ stress ratio K is 3. From the study, it was possible to demonstrate that the small scale disposal research tunnel in KAERI will be mechanically stable.

The First Case Study of TBM Pre-Excavation Type 2-Arch Tunnel in Korea (국내 최초 TBM선굴진 2-Arch터널 설계사례 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.255-264
    • /
    • 2023
  • As the demand for urban underground space increases recently, urban tunnel planning is actively progressing. In the urban area, a underground station is planned in consideration of the living environment of residents, and 2-arch tunnel is applied for the stability of existing structures and reduction of environmental damage. However, since the depth of weak rock mass is deeply distributed in the urban area due to severe weathering, careful planning is required to secure tunnel stability. In addition, if TBM mechanical excavation is applied as the main tunnel excavation method considering the composite ground in urban area, the construction connectivity with the 2-arch tunnel of the NATM concept may be deteriorated. In this study, the design case of applying TBM pre-excavation type 2-arch tunnel for the first time in Korea was mainly described. The main considerations for the segment design of TBM pre-excavation type 2-arch tunnel were explained for side tunnels. Also, a stability analysis was conducted to verify the effectiveness and adequacy of the TBM pre-excavation type 2-arch tunnel.

Model Test of Lining for Estimation of Tunnel Soundness (터널 건전도 평가를 위한 라이닝 모델실험)

  • Kim, Young Keun
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.59-71
    • /
    • 1999
  • Recently, many deformations in tunnel such as crack and leakage were occulted. Specially, the defects of tunnel lining have been a serious problem in safety and stability many repair works for maintenance in tunnel have been carried out. Therefore, it is necessary to estimate the structural cracking for countermeasure in deformed tunnel and to investigate on the characteristics of lining system and the soundness of tunnel. In this study model tests for tunnel lining were carried out using test apparatus and centrifuge, In the direct loading test, the prototype was Kyungbu high-speed railway tunnel and the scale is 1/10, and lining models were made of concrete. Test conditions included load conditions such as direction, shape and type, lining conditions such as single and double lining, thickness, and reinforcement. In centrifuge model test, the prototype was Seoul subway tunnel and the scale is 1/100, and lining models were made of aluminum and hydrostone. Test conditions included tunnel defects such as thickness shortage. behind cavity and longitudinal cracks, reinforcement methods such as epoxy, grouting and carbon sheet. From these model tests , the characteristics of deformation and failure for tunnel lining were estimated, and the structural behaviors of deformed lining and the effects of repair and reinforcement for tunnel lining were researched.

  • PDF