• Title/Summary/Keyword: underground construction site

Search Result 334, Processing Time 0.025 seconds

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

A Study on safety improvement of Underground wall construction to Design for Safety (설계안전성검토를 통한 지하외벽공사의 안전개선 연구)

  • Ji, Kyung-Hwan;Choi, Byong-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.56-68
    • /
    • 2019
  • Safety-conscious design on site is required for site constructions because of the introduction of the design for safety, but it still leaves much to be desired. This study compared the site where the design was applied and the site where it was not applied. The applied case examined the underground wall construction during frame construction, which corresponds to the skeleton of the building construction. The underground wall construction is quite risky due to the exposure to exterior environments and involvement of various stages, such as scaffolding, formwork, reinforcing work, and concrete casting work. Therefore, the risk factors for each stage were identified and a risk assessment was carried out to select an alternative method to reduce the risk. The risk factors of the selected alternative construction method were also identified and a risk assessment was conducted. The risk assessment weight was calculated by comparing the site where the construction method was applied and the site where it was not, explaining the necessity of the design for safety in reducing the risk. In addition, an actual case where an alternative construction method was used was studied to highlight the necessity for a design for safety.

A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work (지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구)

  • Shim, Hak-Bo;Jeon, Hyun-Soo;Seok, Won-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

Analysis of Factors for Selecting Construction Methods for Underground Structures (지하구조물의 공법선정을 위한 요인분석)

  • Kang, Hyun-Jung;Rhim, Hong-Chul;Park, Sang-Hyun;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.37-40
    • /
    • 2007
  • As a demand for underground structure is increasing with more parking and retail spaces required. Various construction methods are reviewed and selected for each specific site for economical and fast construction. In this study, factors for selecting construction methods were categorized for substructure construction. Construction processes of substructure are consisted of methods for excavation, earth retaining systems, and placement of slabs. Factors for the selection of substructure construction method are the condition of surrounding, geotechnical, information and constraint by comfortness for others nearby. After survey for the construction data of 5 different sites, analysis about reliable substructure construction selection method was suggested.

  • PDF

A study on the Applied Technology of a Case for Underground Structures Considering Downtown Site Conditions (도심지 여건을 고려한 지하구조물 공사사례의 시공기술요소에 관한 연구)

  • Lee, Il-Jae;Maeng, Eun-Ju;Son, Hyeok;Lee, Jong-I;Kim, Hyung-Wan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.189-192
    • /
    • 2012
  • Underground structure construction in the downtown is very difficult despite the development of construction technology. We have been a lot of research in order to solve the problem, it was a remarkable achievement. But there are still many difficulties. This study is to analyze the construction technology to demolish the existing underground structures and to build new building applied topdown method at the same time. This technology was effective to suppress interference between the exsisting structure and new building. Therefore, this technology is expected to be able to be used in similar cases in the future.

  • PDF

Computer Simulation for Working Condition of Undergroundwork Using TOP DOWN Technique (TOP DOWN 지하공사의 작업환경체크 컴퓨터시물레이션에 관한 기초적 연구)

  • 고성석;손기상;심경수
    • Journal of the Korean Society of Safety
    • /
    • v.10 no.3
    • /
    • pp.96-105
    • /
    • 1995
  • The better industry develops, the more spaces need but in the limited area. Most building become larger and more complicated if the more spaces need in the constant area. And this leads to do underground work in long period generally six(6) months for 6 basement stories due to the selection of TOP DOWN technique. Working environment in this underground area can be problems and should not be overlooked, because air quality in underground spaces become quickly worse. Recently, department name to control construction safety has been changed to ENVIRONMENT & SAFETY TEAM from SAFETY TEAM. This means that it is very important to control against environmental condition at site so much. Overall construction work as well as underground work should conform to the requirement of working environment, particularly against inhabitants around the construction area. Strut protection, one of earth protection method, in case to 40m long strut may become weaker due to thermal stress or its longitudinally compressive strain and the another one, earth anchor protection may not be applied to the site In case of encroaching on vertical underground borderline because of regulation to prohibit it. It is necessary that TOP DOWN technique should be introduced in order to solve the external and internal problem of the site such as difficulty level of the work, potential danger with excavating depth, and shortening workperiod. It is needed that improving way of working condition should be shown and simplified computer simulation program should be also provided for checking pollution level & ventilation, excluding of lighting problem here. Results measured with conformance to the Regulation for Working Environment Measurement, enforced by Ministry of Labor have been applied to the computer program developed here. Sample air taken at unit workplace which was considered as exposing condition of pollutant at breathing point and within a range of behavior of the workers, Identified exposing group in underground work, using Moded Flow Life Finally, three types of ventilation system, type I with blower & ventilator, type II natural supply with mechanical ventilation system, and type I mechanical ventilation with Drivent Fan Unit System are selected for this study.

  • PDF

Application of Automated Measuring System for the Underground Construction in Urban Area (도심지 근접시공의 자동계측응용)

  • 남순성;정상용
    • Explosives and Blasting
    • /
    • v.15 no.2
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

Risk Factor Selaction and Safety Management Plan in the Underground Excavation Construction (지반굴착공사에서의 위험요인 선정과 안전관리방안 연구)

  • Won, Yu-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.21 no.4
    • /
    • pp.31-37
    • /
    • 2019
  • When the foundation work of the underground part of the building structure or the excavation work of the civil engineering structure is carried out, there is the earthwork work by the inevitable process. As the economic situation continues to develop, construction in urban areas is becoming bigger and higher in scale due to the expansion of infrastructure and the rescue of urban dwellings in urban areas, and excavation of underground roads is inevitable. Excavation of the underground part may cause problems in the process difficulty and safety of the earthworks due to the complexity and various characteristics of the ground selected without consideration of the ground characteristics and site conditions. In order to complete the required facilities, it is necessary to secure the design and construction of the retaining walls. In order to complete the required construction, It is an important factor satisfying construction period and economical efficiency.

A Case on Design and Construction of Tunnel for Under Passing an Underground Transformer Substation (지중변전실 하부통과를 위한 터널설계 및 시공사례)

  • 정동호;문상조;김선홍;이광제;석진호
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.11-18
    • /
    • 2001
  • This is a case history on design and cnostruction of tunnel for under passing an underground transformer substation. The original construction plan was cut & cover method to avoid blasting vibrations and displacements of facilities during the construction stages. But this plan was changed to tunnel because of the difficulties from construction period, cost and the required relocation site. As a results of tunnel construction, the relocation of transformer substation and replacements of transmission cables were not necessary. Therefore about 10 months of construction period and 3.5 billion wonts of construction cost were saved. Additionally, quantitative criterion for blasting was provided through the results of blasting vibration analysis.

  • PDF