• Title/Summary/Keyword: tunnel lining concrete

Search Result 275, Processing Time 0.021 seconds

Improvement of Concrete Lining Construction Method in Large Section Tunnel (대단면 터널 라이닝 콘크리트 타설 기법 개선에 관한 연구)

  • Kim, Sang-Whang;Ra, Kyong-woong;Koh, Sung-Yil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.77-86
    • /
    • 2006
  • Although the adverse critisism have been continued that the concrete lining need or not, most tunnel engineer agree that the concrete lining needs to increase the tunnel safety To establish the concrete lining's quality improvement method, we grasp the basic problems in lining construction process and propose the lining construction methods to increase the concrete quality This paper present a reason of initial crack occurrence in the large section tunnel (4 lane wide span tunnel), lining and an improved method for crack minimization in construction process. It is also verified verify that the proposed method can give qualified concrete lining by carrying out the concrete injection model test and the numerical analysis of concrete flow.

  • PDF

A New Method for Elasto-Plastic Analysis of Concrete Lining Installed in a Deep Circular Tunnel (심부 원형터널에 시공된 콘크리트 라이닝의 새로운 탄소성해석법)

  • Lee, Youn-Kyou;Park, Kyung-Soon;Song, Won-Kyong;Park, Chul-Whan;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.19 no.4
    • /
    • pp.355-365
    • /
    • 2009
  • This paper proposes an elasto-plastic finite difference method which is useful for the stability evaluation of concrete lining installed in a deep circular tunnel. Mohr-Coulomb criterion is assumed for the condition of yielding in both the rock mass and concrete lining. In order to take into account the installation delay of lining after the excavation, the outer boundary pressure acting on the lining was calculated with the consideration of the convergence occurred before the lining installation. The distributions of stress and displacement in the rock mass and lining were calculated based on the method proposed Lee & Pietruszczak (2008). The applicability of the proposed method was demonstrated by conducting the elasto-plastic analysis of concrete lining supporting an imaginary compressed air storage tunnel. The analysis result revealed that the exact determination of the boundary pressures acting on the concrete lining is of importance in the stability analysis of concrete lining.

Case Studies of Automatic Measurement and strength for Damage in the Public Tunnel (공용중인 터널의 변상에 대한 보강 및 자동화계측 사례)

  • Han Ja-Jung;Kim Young-Ho;Jang Gi-Soo;Kweon Young-Jung;Ahn Sang-Ro
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.270-281
    • /
    • 2005
  • An especial attention for old tunnel safety is required on increasing of The various tunnel recently. Specially, the lining investigation method of the old tunnel will be able to presume condition of concrete lining indirectly. Because it is many restriction thought of environment and ground condition investigation method of tunnel lining rear. This study carried out section & convergence measurement of part which was deformed in tunnel lining. It had been observed for the change of tunnel behavior with a continuous measurement. It has been analyzed for a cause of tunnel deformation and inspected for the effect after a repair-reinforcement to tunnel compared with the effect before those by structure analysis. By establishing automatic measurement system after repair-reinforcement to tunnel, it would be accomplished to convergence measurement continually. As a result, it was observed that deflection and deformation of tunnel was convergent. but it should be followed to a continuous maintenance because of unstable ground condition, cause of inner tunnel, environment. The railroad tunnel which was executed a reinforcement of the tunnel lining must investigate the close condition of reinforcement lining and concrete lining.

  • PDF

Hydro-mechanical coupling algorithm of reinforced concrete lining in hydraulic pressure tunnel using cohesive elements

  • Li Zhou;Kai Su;Ding-wei Liu;Yin-quan Li;Hong-ze Zhu
    • Structural Engineering and Mechanics
    • /
    • v.86 no.1
    • /
    • pp.139-156
    • /
    • 2023
  • The reinforced concrete lining in the hydraulic pressure tunnel tends to crack during the water-filling process. The lining will be detached from the surrounding rock due to the inner water exosmosis along concrete cracks. From the previous research achievements, the cohesive element is widely adopted to simulate the concrete crack but rarely adopted to simulate the lining-rock interface. In this study, the zero-thickness cohesive element with hydro-mechanical coupling property is not only employed to simulate the traditional concrete crack, but also innovatively introduced to simulate the lining-rock interface. Combined with the indirect-coupled method, the hydro-mechanical coupling algorithm of the reinforced concrete lining in hydraulic pressure tunnels is proposed and implemented in the finite element code ABAQUS. The calculated results reveal the cracking mechanism of the reinforced concrete lining, and match well with the observed engineering phenomenon.

Field Measurements with the Construction of Cut and Cover Tunnel (복개 터널구조물의 현장 시공에 따른 계측 분석 사례)

  • 박시현;이석원;이규필;배규진;전오성;이종성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.149-156
    • /
    • 2002
  • Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process of the ground material. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells, installed after construction of the tunnel lining, measure the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measuring results in the field, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process of the ground material. Considerations on the validity of the measuring results were paid. For the analysis of measurements, after dividing back fill process into three steps, various factors which affect on the behavior of tunnel lining were investigated at each step.

  • PDF

Assessment of time-dependent behaviour of rocks on concrete lining in a large cross-section tunnel

  • Mirzaeiabdolyousefi, Majid;Nikkhah, Majid;Zare, Shokrollah
    • Geomechanics and Engineering
    • /
    • v.29 no.1
    • /
    • pp.41-51
    • /
    • 2022
  • Tunneling in rocks having the time-dependent behavior, causes some difficulties like tunnel convergence and, as a result, pressure on concrete lining; and so instability on this structure. In this paper the time-dependent behaviour of squeezing phenomenon in a large cross section tunnel was investigated as a case study: Alborz tunnel. Then, time-dependent behaviour of Alborz tunnel was evaluated using FLAC2D based on the finite difference numerical method. A Burger-creep viscoelastic model was used in numerical analysis. Using numerical analysis, the long-time effect of squeezing on lining stability was simulated.This study is done for primary lining (for 2 years) and permanent lining (for 100 years), under squeezing situations. The response of lining is discussed base on Thrust Force-Bending Moment and Thrust Force-Shear Force diagrams analysing. The results determined the importance of consideration of time-dependent behaviour of tunnel that structural forces in concrete lining will grow in consider with time pass and after 70 years can cause instability in creepy rock masses section of tunnel. To show the importance of time-dependent behavior consideration of rocks, elastic and Mohr-Coulomb models are evaluated at the end.

A Study on the Non-Destructive Test of Concrete Tunnel Lining Using Infrared Thermography Technique (적외선 열화상기법을 이용한 콘크리트 터널 라이닝의 비파괴 시험에 관한 연구)

  • 김영근;장정범;김영진
    • Tunnel and Underground Space
    • /
    • v.7 no.1
    • /
    • pp.75-83
    • /
    • 1997
  • The interest of diagnosis and maintenance of construction is increasing due to the collapse of infastructures. To obtain the complete, reliable and reproducible data ont he state of the entire structure, various non-destructive techniques are available, Especially, specific constructional characteristics of tunnels make the application of non-destructive tests more difficult. Despite of the complications of these conditions, non-destructive techniques should be capable of providing a description of the state of the tunnel lining, without the removal of the tunnel installations. In this paper, the infrared thermography technique using the difference of surface temperature was studied. The optimum equipment was selected and introduced, the principle, testing method and data anlaysis were investigated. Also, through the case study for inspection of concrete tunnel lining, this technique has proven to be a valuable non-destructive test for detecting the defects such as crack, leakage of water and exfoliation of concrete. The applicability and usefulness of this technique for estimation of concrete tunnel lining have been conformed.

  • PDF

Damage Detection of Decrepit Tunnel Structures using the NDT (비파괴 검사법에 의한 노후터널의 건전도 평가)

  • Kim, Dong-Gyou;Jung, Ho-Seop
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1388-1391
    • /
    • 2010
  • Recently, the construction of road, subway, railroad, and microtunnel for electricity supplement have been increased because of increasement of traffic in urban area, increasement of industrial transportation, and the network between cities in Korea. The deterioration of tunnel structure may occur by various internal and external factors and particularly, tunnel structures tend to contact with either underground water or harmful ions. Therefore, leakage sometimes occurred through the cracks and joints of concrete lining. The leakage in tunnel may affect the durability of concrete lining. In this study, to evaluate the durability and deterioration of concrete lining in tunnel structures, we were performed the various experiments for compressive strength. Compressive strength obtained from nondestructive inspection and compressive strength test varies according to the concrete lining conditions.

  • PDF

Development of Inspection System for Crack on the Lining of Concrete Tunnel (콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구)

  • 고봉수;손영갑;신동익;김병화;한창수
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.1
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.

A Study on the Rock Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 암반하중 산정방법 고찰)

  • 천병식;박태수;신영완
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.89-96
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Numerical analyses are done in various conditions. And the rock loads estimated from radial stress and plastic zone are compared respectively.

  • PDF