• Title/Summary/Keyword: tunnel anchor

Search Result 50, Processing Time 0.025 seconds

A Case Study about the Slope Collapse and Reinforcement Method on the Infinite Slope (무한사면에서의 사면붕괴와 보강대책 사례연구)

  • You Byung-Ok;Hong Jung-Pyo;Jun Jong-Hern;Lee Tae-Sun;Min Kyoung-Nam
    • Tunnel and Underground Space
    • /
    • v.16 no.2 s.61
    • /
    • pp.146-155
    • /
    • 2006
  • The target slope of this study, formed during the construction of highway, is the very high infinite slope where sliding began along the discontinuity. Although an attempt was made to stabilize the upper part of the slope by installing the rock anchors, large scale failure was occurred at the lower part if the reinforced area. Afterwards, subsequent failures were observed two times. To investigate the cause of the failure, residual shear strength was measured by performing the direct shear test of rock specimen of the site. The anchor design was based on the pull-out test. Considering the slope surface where the undulation was severe and the variation of strength was very large, buttressing was used to obtain the required anchoring capacity.

A Study on the Stability Analysis and Countermeasure of Tunnel Portal Failure Slope - in Suanbo Hot Springs 1 and 2 Tunnel Failure Site (터널 갱구부 붕괴 사면의 안정성 해석 및 보강공법에 관한 연구 - 수안보 온천 1, 2터널 붕괴 현장을 중심으로)

  • Baek, Yong;Koo, Ho-Bon;Yoo, Ki-Jeong
    • The Journal of Engineering Geology
    • /
    • v.12 no.4
    • /
    • pp.367-378
    • /
    • 2002
  • Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.

Widening of Bony Tunnel after ACL Reconstruction Using Hamstring Tendon with Ligament Anchor(LA) Screw (슬괵건 및 LA나사를 이용한 관절경적 전방 십자 인대 재건술 후 골터널의 확장)

  • Song Eun Kyoo;Yoon Taek Rim;Jung Jong Wook;Jeong Kwang Cheul
    • Journal of the Korean Arthroscopy Society
    • /
    • v.5 no.2
    • /
    • pp.69-73
    • /
    • 2001
  • Purpose : To evaluate the clinical results and widening of bony tunnel after anterior cruciate ligament(ACL) reconstruction using hamstring tendon with Ligament Anchor(LA) screw, which is newly designed fur fixation of graft into femur. Materials and Methods : Fifty eight patients who were followed up at least more than 2 years after ACL reconstruction with four strands of Hamstring tendon were included in this study. The graft was fixed with LA screw at femoral tunnel and with bioabsorbable interference screw at tibial tunnel. The average period of follow-up was 28 months. The clinical results such as physical examination and Lysholm knee score and radiological results. widening of bony tunnel and instrumented anterior laxity test with $Telos^{\circledR}$(Telos stress device; Austin & Associates, Inc., Polston, US) were evaluated. Results . The Lysholm knee score was 60.0 in average preoperatively and improved to 94.0 in average at follow up. On the Lachman test, there were mild(+) instability in 16 cases, moderate(++) in 24, severe(+++) in 18 preoperatively. 50 cases were converted to negative and 8 to mild instability at follow up. On instrumented anterior laxity test with $Telos^{\circledR}$, side to side difference in 20 lb was 12.9mm in average preoperatively, and was decreased to 3.1mm in average follow-up. The femoral tunnel was widened from 10.6mm postoperatively to 12.7mm$(21.1\%)$ at follow up on antero-posterior plane and from 10.7mm to 12.4mm$(16.5\%)$ on lateral plane. Tibial tunnels was also widened from 9.8mm to 11.8mm$(20.7\%)$ on antero-posterior plane and from 9.9mm to 11.7mm$(18.9\%)$ in lateral plane. Conclusion : ACL reconstruction with hamstring tendon and LA screw was one of the choice of grafts and fixatives in restoring knee stability and in improving clinical results with little complications such as excessive widening of bony tunnel.

  • PDF

Development of Visual Confirmation Device for Anchor Tensile Force (앵커 긴장력 상시확인을 위한 육안확인장치 개발)

  • Yoon, Hwan Hee;Lee, Yong Joo;Oh, Dong Wook;Kim, Dong Hyun;Jung, Hyuk Sang
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.493-511
    • /
    • 2018
  • This paper deals with visual confirmation device for tensile force verification in order to cope with tensile force loss of ground anchor. Ground anchors are constructed to ensure the stability of social infrastructure facilities, but continuous loss of tensile force is seriously concerned about safety of the facilities. This requires the maintenance of the anchors, but the current measuring of residual tensile force is done by sampling, taking into account economic aspects, which limits precision. In this paper, conducted a conceptual design, tensile experiment, and field test for the purpose of developing an anchor tensile force visual device to check the tensile force of the anchors.

LFH: Low-Cost and Fast Handoff Scheme in Proxy Mobile IPv6 Networks with Multicasting Support (프록시 모바일 IPv6 네트워크에서 멀티캐스팅을 지원하는 저비용의 빠른 이동성관리 기법)

  • Kim, Eunhwa;Jeong, Jongpil
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.2 no.6
    • /
    • pp.265-278
    • /
    • 2013
  • With the recent advancements in various wireless communication technologies, the importance of mobile multicasting is coming to the fore, in an effort to use network resources more efficiently. In the past, when various mobile IP-based multicast techniques were proposed, the focus was put on the costs needed for network delivery for providing multicast services, as well as on minimizing the multicast handover delay. For techniques using MIPv6 (Mobile IPv6), a host-based mobility management protocol, however, it is fundamentally difficult to resolve the problems of handover delay and tunnel convergence. To resolve these problems, a network-based mobility management protocol called PMIPv6 (Proxy Mobile IPv6) was standardized. Although performance is improved in PMIPv6 over MIPv6, it still suffers from the problems of handover delay and tunnel convergence. In this paper, to overcome these limitations, a technique called LFH (Low-cost and Fast Handoff) is proposed for fast and low-cost mobility management with multicasting support in PMIPv6 networks. To reduce the interactions between the complex multicast routing protocol and the multicast messages, a simplified proxy method called MLD (Multicast Listener Discovery) is implemented and modified. Furthermore, a TCR (Tunnel Combination and Reconstruction) algorithm was used in the multicast handover procedure within the LMA (Local Mobility Anchor) domain, as well as in the multicast handover procedure between domains, in order to overcome the problem of tunnel convergence. As a result, it was found that LFH has reduced multicast delay compared to other types of multicast techniques, and that it requires lower costs as well.

Behaviour of Ground Anchor According to Period Characteristic of Seismic Load Using Numerical Analysis (수치해석을 통한 지진하중의 주기특성에 따른 그라운드 앵커의 거동)

  • Oh, Dong-Wook;Jung, Hyuk-Sang;Yoon, Hwan-Hee;Lee, Yong-Joo
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.635-650
    • /
    • 2018
  • Many people have been recognized that the Korean Peninsula is no longer safe area from the earthquake by the recent earthquakes occurred in the country. The earthquakes that occurred at Pohang and Gyeongju appeared differently from them considered in the seismic design and researches on the seismic design method have been also conducted by many researchers. Studies on seismic loads are mainly focused on existing superstructures, and research involving them has been actively carried out in reality. However, paper regarding structural stability of reinforcement from seismic load such as soil-nails, rock-bolts, ground anchors which were constructed to ensure stability of serviced structure have been published rarely. In this study, ground anchor been effected by static load and seismic load which is settled in the weathered rock is analyzed. Results for static load are obtained from field test and seismic load is from numerical analysis. In this study, the behavioral characteristics of the ground anchor were analyzed by numerical analysis in case of seismic loading based on the result of the in-situ tensile test of the ground anchor settled weathered rock. As a result, settlement of concrete block due to application of tension force for ground anchor occurred as well as following loss of axial force for ground anchor. Also, as bond length and period of seismic load are longer, increasement of displacement is greater.

Deformation Behaviors of Temporary Tieback Wall during Excavation Works (현장계측과 수치해석을 이용한 가설 흙막이 구조물의 변형특성 연구)

  • 김종우
    • Tunnel and Underground Space
    • /
    • v.5 no.3
    • /
    • pp.223-229
    • /
    • 1995
  • During excavation works for underground facilities, temporary tieback wall with earth anchor system was investigated for safety's sake. An excavation 9.7 meter deep was monitored by slope inclinometer in twelve measuring points. Instrumented lateral displacements of the wall during 177 days are represented. Especially, lateral displacements of the two positions under completely different condition are compared to investigate the effect of backfilling between soldier pile and the soil behind wall. The deformation behaviors of the wall according to both depth and elasped time are discussed. Finally, a numerical analysis by the program FLAC was performed, and calculated displacements are compared to measured ones.

  • PDF

Limit analysis of a shallow subway tunnel with staged construction

  • Yu, Shengbing
    • Geomechanics and Engineering
    • /
    • v.15 no.5
    • /
    • pp.1039-1046
    • /
    • 2018
  • This paper presents a limit analysis of the series of construction stages of shallow tunneling method by investigating their respective safety factors and failure mechanisms. A case study for one particular cross-section of Beijing Subway Line 7 is undertaken, with a focus on the effects of multiple soil layers and construction sequencing of dual tunnels. Results show that using the step-excavation technique can render a higher safety factor for the excavation of a tunnel compared to the entire cross-section being excavated all at once. The failure mechanisms for each different construction stage are discussed and corresponding key locations are suggested to monitor the safety during tunneling. Simultaneous excavation of dual tunnels in the same cross-section should be expressly avoided considering their potential negative interactions. The normal and shear forces as well as bending moment of the primary lining and locking anchor pipe are found to reach their maximum value at Stage 6, before closure of the primary lining. Designing these struts should consider the effects of different construction stages of shallow tunneling method.

Mechanical behavior and simplified models for the post-tensioned prestressed concrete lining

  • Fan Yang;Kang Liu;Yan-qiao Wang;Ming Huang
    • Structural Engineering and Mechanics
    • /
    • v.86 no.1
    • /
    • pp.17-27
    • /
    • 2023
  • To investigate the mechanical behavior of the post-tensioned prestressed concrete lining (PPCL), the desilting tunnel of the Xiaolangdi Hydro Project in China is adopted as a case, and a detailed three-dimensional continuum model verified by the observation results is established for the PPCL. The radial stresses, longitudinal stresses, axial forces and bending moments of the PPCL under the completed cable tension condition (CCTC) and design water pressure condition (DWPC) are analyzed, respectively. The numerical results reveal that the PPCL concrete is significantly compressed in the circumferential direction by the prestress, while the prestress has a negligible influence on the radial stresses of the PPCL concrete. It should be noted that the concrete near the anchor slots has a complex and adverse stress state with stress concentration, longitudinal tensioning and large bending moment. In addition, a simplified shell model and a further simplified beam model which can take the influences of the prestress loss and the anchor slot into consideration are proposed for the PPCL. The results of the simplified models are in a good agreement with these of the three-dimensional continuum model, and they can be used as efficient approaches for the structural design and analysis of the PPCL.

An Analysis of Cut-slope Based on the Prediction of Joint Distribution inside the Cut-face (개착면 내부에서의 절리분포 예측을 통한 사면 해석)

  • Lee Chang-Sup;Chung Jin-Bo;Cho Taechin
    • Tunnel and Underground Space
    • /
    • v.14 no.6 s.53
    • /
    • pp.391-398
    • /
    • 2004
  • An algebraic algorithm for predicting the joint trace distribution on the cut-face of rock slope based on the orientations and the locations of joints investigated in the borehole has been developed. Joint trace prediction is manipulated by utilizing the three dimensional plane equations of both joint planes and projection face, and the extent of trace within the projection area is calculated by considering the persistence of each joint plane. Joint trace prediction method is efficiently applied for analyzing the stability and the adequacy of support design of Gimhae Naesam cut-slope, which is structurally unstable due to slumping. Structural characteristics of rock mass is investigated by performing DOM drilling and the potential rock mass sliding inside slope face is analyzed by examining the orientations of joint planes which can induce the slope failure. Also, the efficiency of anchor support design is evaluated by considering the joint trace distribution on the anchor installation area and its sliding potential.