• 제목/요약/키워드: tunnel advance rate

검색결과 53건 처리시간 0.017초

터널굴진율이 막장에서의 침투력에 미치는 영향에 관한 연구 (Effect of Tunnel Advance Rate on the Seepage Forces Acting on the Tunnel Face)

  • 남석우;이인모
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.327-333
    • /
    • 2002
  • In this study, the effect of tunnel advance rate on the seepage forces acting on the tunnel face was studied. The finite element program to analyze the groundwater flow around a tunnel with the consideration of tunnel advance rate was developed. Using the program, the parametric study for the effect of the tunnel advance rate and hydraulic characteristics of the ground on the seepage forces acting on the tunnel face was studied. From this study, it was concluded that the tunnel advance rate must be taken into consideration as an additional parameter to assess the seepage forces at the tunnel face and a rational design methodology for the assessment of support pressures required for maintaining the stability of the tunnel face was suggested for underwater tunnels.

  • PDF

터널 굴진율을 고려한 막장에서의 침투력에 관한 연구 (Study on the Seepage Forces Acting on the Tunnel Face with the Consideration of Tunnel Advance Rate)

  • 남석우;이인모
    • 한국지반공학회논문집
    • /
    • 제18권5호
    • /
    • pp.221-228
    • /
    • 2002
  • 터널 굴착시 막장의 안정성은 주변지반 및 터널 지보재의 안정성과 아울러 가장 중요하게 평가되어야 할 요소 중의 하나이다. 특히 터널이 지하수위 하에서 시공될 경우 지하수 흐름에 따라 터널 막장에서 발생하게 되는 침투력은 터널 막장의 안정성에 심각한 영향을 미칠 수 있다. 따라서 본 침투력은 터널 설계 및 시공시 터널 막장의 안정성 측면에서 중요하게 평가되어야 할 요소이다. 본 연구에서는 지하수위 하에서 터널이 시공될 경우 발생하는 침투력과 관련하여 터널 굴진율이 본 칩투력에 미치는 영향에 대해서 언급하였다. 터널 굴진율을 고려한 지하수 흐름해석을 위하여 유한요소 해석 프로그램이 개발되었다. 본 프로그램을 이용하여 터널 굴진율 및 지반의 투수특성이 터널 막장에 작용하는 침투력에 미치는 영향을 매개변수 분석을 통하여 연구하였다. 본 연구결과, 터널 굴진율은 터널 막장에 작용하는 침투력을 평가하는데 있어서 중요한 추가된 요소로 고려되어야 하며, 결론적으로 터널 막장의 안정성을 유지하기 위한 지보압의 합리적인 산정을 위한 방법론을 제시할 수 있었다.

2, 3 자유면 발파의 굴진율 및 비장약량 비교 (Comparison of advance rate and powder factor of two- and three-free-face blasting)

  • 윤영민;전석원
    • 한국터널지하공간학회 논문집
    • /
    • 제26권5호
    • /
    • pp.403-419
    • /
    • 2024
  • 터널 발파에서 굴진율은 공사기간과 공사비에 영향을 미치는 중요한 요소이므로 굴진율 증대를 위한 발파공법개발 연구가 계속해서 이루어지고 있다. 본 논문에서는 굴진율 증대를 위한 새로운 발파패턴 개발을 위한 기초자료 확보를 목적으로 2, 3 자유면 발파의 굴진율과 비장약량의 차이를 비교하고자 하였다. 대형 시멘트 모르타르 시험체를 제작하여 2, 3 자유면 발파실험을 수행하고, 실험 결과를 수치해석 결과와 비교하였다. 동일 조건하에서 2자유면 발파보다 3자유면 발파 시 귤진율이 크게 증가하였고, 비장약량은 감소하였다. 본 연구의 결과는 3자유면을 활용한 발파패턴 개발에 활용될 것이며, 이를 통한 터널 및 노천 발파에 있어서의 굴진율 증대 및 천공 수와 화약량 감소 효과를 기대한다.

터널 지보패턴 결정을 위한 위험도 분석 (A risk analysis for the determination of a tunnel support pattern)

  • 유광호;박연준
    • 한국터널지하공간학회 논문집
    • /
    • 제5권3호
    • /
    • pp.241-250
    • /
    • 2003
  • 암반은 그 특성상 매우 불균질하며, 조사 및 시험을 통하여 얻을 수 있는 자료는 아주 한정적이다. 이러한 이유 때문에 암반 중에 구조물을 구축하는 작업은 많은 불확실성 (uncertainties)을 내포하게 된다. 터널 설계에 있어서 주요 설계 파라미터인 지보패턴, 굴진장 및 굴착방법 등은 최적의 값으로 결정되어야 하나 그 결정이 쉽지 않으며, 결정을 잘못할 경우 원하지 않는 risk, 즉 터널 안정성의 저하 혹은 지보재의 지나친 보강으로 인한 경제적 손실을 발생시킨다. 본 연구에서는 터널설계 시 주요한 설계 파라미터인 지보패턴 및 굴진장을 위험도 분석 기법에 근거하여 결정하는 방법을 소개하였다. 지보량이 증가할수록 신뢰지수가 증가하여 터널의 안정성이 증가함을 정량적으로 확인할 수 있었으며, 터널의 붕괴 등으로 말미암아 발생할 수 있는 손실비용 및 공사비를 고려하여 위험도 분석을 실시함으로서 최적의 지보패턴 및 굴진장을 정량적으로 결정할 수 있었다.

  • PDF

현장 굴진자료 분석에 의한 토압식 쉴드 TBM의 운전조건과 굴진속도 연구 (A Study on Advance Rate under the Operating Conditions of EPB Shield TBM Based on TBM Operation Data)

  • 안만선;임광수;김경주
    • 대한토목학회논문집
    • /
    • 제31권6D호
    • /
    • pp.839-848
    • /
    • 2011
  • TBM(Tunnel Boring Machine) 터널은 굴진 도중 장비의 교체나 개조 등은 불가능하기 때문에 굴진 종료 시까지 투입된 장비로 굴진하여야만 한다. 특히 토압식 쉴드TBM은 막장관찰이 어려우므로 굴진 중에 수집된 자료를 분석하여 지반상태의 변화를 예측하고 이를 시공에 반영하여야한다. 지금까지의 TBM에 대한 연구는 굴착 대상이 되는 지반의 특성에 따른 장비선정 및 굴진속도 예측모델 개발이 주로 이루어져왔다. 그러나 굴착의 주체가 되는 TBM 장비의 굴진자료에 의한 지반상태의 추정 및 운전방법의 개선에 초점을 맞춘 연구는 그리 많이 수행되지 않았다. 본 연구는 토압식 쉴드TBM 시공 사례에서 얻은 굴진자료를 활용하여 투입된 장비의 운전조건에 따른 굴진속도의 변화와 최적 운전조건에 대해 알아보았다. 본 연구의 결과를 요약하면 다음과 같다. 첫째, 커터헤드의 회전속도와 총추력이 굴진속도에 가장 큰 영향을 주며 둘째, 적정한 굴진속도를 위해서는 최적 회전속도를 유지하면서 총추력을 조정하는 것이 좋으며 셋째, 총추력의 증가 추세에 따라 지반조건의 변화에 대한 예측이 가능하여 이에 따라 적절한 운전조건의 변경을 결정할 수 있다.

암반기계굴착공법의 적용연구 (Application of TBM/TBE to Mechanical Excavation in Rock)

  • 박철환;김길수
    • 터널과지하공간
    • /
    • 제2권1호
    • /
    • pp.177-189
    • /
    • 1992
  • As tunnel becomes longer and larger, TBM has become one of the most popular methods of excavatio in rock. This paper describes the degree of operation the degree of availability and penetration rate of TBM and TBE applied in Namsan roadway tunnelling site. Net penetration rate was 1.62m/hr for TBM and 0.72m/hr for TBE. Net penetration rate showed no direct relation to daily advance or penetration time, but the lower bound of penetration rate could be obtained from the relation with daily advance. For both of TBM and TBE, the degree of operation and the degree of availability were 33.8% and 68.6% respectively. Life time of normal cutter was $310m^3$ for TBM and $194m^3$ for TBE, while that of center and gauge cutter was about $50m^3$. When the two machines were compared, TBM showed 80% higher penetration rate, and 40% shorter life time of cutter.

  • PDF

터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례 (Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation)

  • 김희도;이준원;이하영
    • 화약ㆍ발파
    • /
    • 제31권2호
    • /
    • pp.32-39
    • /
    • 2013
  • 일반적으로 장공발파 방법은 과거 대규모 채탄막장이나 댐 기초굴착, 광산 등에서 행하여져 왔으나, 최근 우리나라에서 신설되는 토목터널에서 시공 효율성 및 경제성을 목적으로 많이 실시되고 있다. 고속국도제 600호선 부산외곽 고속도로 ${\bigcirc}$공구 또한 총연장 약 8km의 4차선 대단면 도로 터널로서 Type I, II, 4.4m 장공발파를 실시하는 현장이다. 그러나 당 현장에서는 발파 후 굴진율이 약 75%에 그쳐 발파 후속작업 시간에 영향을 미치게 되고 그로 인하여 전체 작업공정 시간이 증가하여 계획된 굴진을 못하는 현상이 자주 발생되었다. 본 논문에서는 당 현장에서 위 문제를 극복하기 위하여 실시된 장공발파 공법 중 천공경과 가장 밀장전 할 수 있는 ${\phi}36mm$폭약을 적용하여 굴진효율을 향상시키고 작업공정 시간을 단축시킨 사례를 소개하고자 한다.

국내 Raise Boring Machine의 굴착능력에 관한 연구 (Study on the Workability of Raise Boring Machine in Korea)

  • 이석원;조만섭;배규진
    • 터널과지하공간
    • /
    • 제13권3호
    • /
    • pp.196-206
    • /
    • 2003
  • 본 연구에서는 Raise Boring Machine(RBM의 가동율, 관입율, 굴진율과 같은 굴착능력을 조사하기 위하여 직경 3.05 m와 총 연장 98 m의 수직구를 RBM을 이용하여 시험시공 하였다. 이와 함께 국내 양수발전소, 도로터널, 석탄광업소 등에서 RBM으로 시공되었던 4개의 수직구 시공현장으로부터 시공자료를 수집하여 분석을 수행하였다. 연구결과, 주간 평균 굴진장은 약 19.3 m로 분석되었고, 평균 가동율은 약 54.3%011서 75.1 %사이에 분포하는 것으로 나타나, 이는 TBM 시공실적과 비교하여 볼 때 매우 높은 가동율을 보이고 있다. Bit force와 RPM은 (+)의 직선적인 상관관계로 나타났으며 이는 굴착효율에 따라 작업자의 판단에 기인한 결과로 추정된다. 순관입율과의 관계에서는 RBM작업의 bit force와 RPM 및 수직구 심도가 증가함에 따라 순관입율이 저하되는(-)의 상관관계를 나타내었다. 본 연구결과는 수직구 설계 및 RBM장비 선정에 필요한 정보를 줄 수 있을 것으로 사료된다.

국내 TBM굴진속도 산정을 위한 경험적 방법들의 적용성 분석 (Applicability Analysis of Empirical Methods for the Calculation of TBM Advance Rate)

  • 조만섭;우동찬;김경곤;이진무
    • 터널과지하공간
    • /
    • 제13권4호
    • /
    • pp.260-269
    • /
    • 2003
  • In order to introduce to engineers the suitable calculation techniques of TBM advance rate (ad.) and ultimately promote to understand the designing process, this study was carried out. We analyzed the 17 bored data of TBM which applied to the roadway and water supply tunnels in Korea. From this analysis, it was able to how that the average utilization is 30.83% md the correlation equation of Ad and TBM´s diameter (D) is Ad(m/month) = 506.05ㆍ $e^{-0.1162}$$\times$D than the correlation coefficient ($R^2$) is 0.76. In the object of the W tunnel of Seoul-Busan highspeed railway, the Ad of TBM 5.0mø was analyzed by the variety of empirical models and upper correlation equation. Average Ad of the empirical models was calculated to be larger than one of the upper equations. But considering only the results of 3.0~5.0mø TBM in the 17 bored data, the average Ad by the models belongs to the similar range of bored data. Therefore, when the reliability and representative of parameters are decreased, a reliability test should be carried out through the comparison a variety of empirical models with the upper correlation equation.