• Title/Summary/Keyword: transmission tower-line

Search Result 134, Processing Time 0.033 seconds

Automatic Power Line Reconstruction from Multiple Drone Images Based on the Epipolarity

  • Oh, Jae Hong;Lee, Chang No
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.3
    • /
    • pp.127-134
    • /
    • 2018
  • Electric transmission towers are facilities to transport electrical power from a plant to an electrical substation. The towers are connected using power lines that are installed with a proper sag by loosening the cable to lower the tension and to secure the sufficient clearance from the ground or nearby objects. The power line sag may extend over the tolerance due to the weather such as strong winds, temperature changes, and a heavy snowfall. Therefore the periodical mapping of the power lines is required but the poor accessibility to the power lines limit the work because most power lines are placed at the mountain area. In addition, the manual mapping of the power lines is also time-consuming either using the terrestrial surveying or the aerial surveying. Therefore we utilized multiple overlapping images acquired from a low-cost drone to automatically reconstruct the power lines in the object space. Two overlapping images are selected for epipolar image resampling, followed by the line extraction for the resampled images and the redundant images. The extracted lines from the epipolar images are matched together and reconstructed for the power lines primitive that are noisy because of the multiple line matches. They are filtered using the extracted line information from the redundant images for final power lines points. The experiment result showed that the proposed method successfully generated parabolic curves of power lines by interpolating the power lines points though the line extraction and reconstruction were not complete in some part due to the lack of the image contrast.

Study on the Air Insulation Design Guideline for ±500 kV Double Bipole Transmission Line with Metallic Return Conductor (도체귀로형 ±500 kV Double Bipole 송전선로 공기절연에 관한 연구)

  • Shin, Kooyong;Kwon, Gumin;Song, Seongwhan;Woo, Jungwook
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.5 no.3
    • /
    • pp.141-147
    • /
    • 2019
  • Recently, the biggest issue in the electricity industry is the increase in renewable energy, and various technologies are being developed to ensure the capacity of the power system. In addition, super-grids linking power systems are being pushed to utilize eco-friendly energy between countries and regions worldwide. The HVDC transmission technology is required to link the power network between regions with different characteristics of the power system such as frequency and voltage. Until now, Korea has applied HVDC transmission technology that connects mainland and Jeju Island with submarine cables. But, the HVDC transmission technology is still developing for long-distance high-capacity power transmission from power parks on the east coast to load-tight areas near the metropolitan area. Considering the high population density and mountainous domestic environment, it is pushing for commercialization of the design technology of the ${\pm}500kV$ Double Bipole with metallic return wire transmission line to transmit large-scale power of 8 GW using minimal right of ways. In this paper, the insulation characteristics were studied for the design of double-bipole transmission tower with metallic return wire, which is the first time in the world. And the air insulation characteristics resistant to the various overvoltage phenomena occurring on transmission lines were verified through a full-scale impulse voltage test.

Theoretical and Experimental Analysis of Extremely Low Frequency Magnetic Field in the Vicinity of the Transformer Station of Overhead Power Lines

  • Ghnimi, Said;Rajhi, Adnen;Gharsallah, Ali;Bizid, Youssef
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1655-1662
    • /
    • 2018
  • This paper studies the magnetic fields between the power lines which are finite length and other ones which are infinitely long around the first tower in the proximity of the power transformers. They will be used as a source of disturbance applied to the power line. The method applied in this study was gradual; develop the theoretical formulation of the magnetic fields of these lines which are finite length and other ones which are infinitely long, examine the effects of different couplings between the different neighboring lines and the distribution transformers on behavior of magnetic fields. The method also focused on the experimental results analyzing the magnetic fields which will be used as a source applied to the auditory implants EMC. The theoretical and experimental results were compared and discussed for three power lines (90kV, 150kV and 225kV) near the power station, and it proved the effect of these substations on the simulated and measured results of the magnetic field. The maximum intensities of magnetic fields measured at the height of 1m from the ground for the circuit of three lines close to each substation were significantly lower than the ICNIRP reference levels for occupational and non occupational exposures.

Development of Working Platform for the Polymer Insulator String (송전선로 폴리머애자 공사용 장비 개발)

  • Min, Byeong-Wook;Wi, Shwa-Bok;Bang, Hang-Kwon;Choi, Han-Yeol;Baek, Soo-Gon;Park, Jae-Ung
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.438-439
    • /
    • 2006
  • Porcelain insulators have generally been used in Korea to insulate a transmission line from the tower, and a highly polymerized compound polymer insulator which has superior stain proof characteristics, has also been used widely. Currently, a worker rides on the suspension insulator string for installation on towers and conductors but in case of polymer insulators, this will pollute and scratch the housing result in durability reduction by deterioration and corona. This study developed a high strength aluminum compound metal lauder designed to work on polymer insulators without riding, and a clamp type connecting device and safety gear for easy installation on the tower and conductor. These polymer insulator work device can be used for 154kV and 345kV polymer insulators through a strength and load test to secure safety. This paper presents field usage.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Insulator application and prospect (가공송전선로 애자 적용실태와 향후 전망)

  • Kim, Woo-Kyum;Min, Byeong-Wook;Kim, Tai-Young;Wi, Hwa-Bog;Choi, Jin-Sung;Lee, Buk-Chang
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.327_328
    • /
    • 2009
  • The insulator being used for transmission line is to mount the charged conductor on the tower or other supports. The insulators are classified according to its material: porcelain, glass and polymer. Polymer insulators are also called as composite insulator or non ceramic insulator (NCI). Insulators are a major element of a power transmission system. Since a faulty insulator can lead to a wide spreading blackout, it must have sufficient mechanical and electrical strength. It must be durable, have high electrical insulation and be able to withstand a leakage current. It must also be able to withstand the toughest weather conditions. In Korea, porcelain insulators have been used widely. However, to make compact equipment and keep up with global trends, we have enhanced domestic production of polymer insulator and are encouraging its applications. Accordingly, this thesis will look at types of insulators, use and trends, and prospects of insulators application in the field.

  • PDF

Reinforcement Method of Tower Basement on Power Transmission Line (철탑 콘크리트 기초강도 보강방안 분석)

  • Lee, Kyoung-Wook;Park, Jin-Tai;Kim, Jae-Joon;Hwang, Jong-Sun
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2115_2116
    • /
    • 2009
  • 철탑기초의 콘크리트 압축강도가 Core시험결과 설계기준강도에 미달된 철탑기초에 대한 보강방안은 콘크리트의 강도가 부족함으로써 발생되는 콘크리트 기초 본체에 대한 문제로서 콘크리트의 허용 펀칭전단응력의 감소로 발생되는 기초 상판부의 두께 부족 문제와 앵카재의 소요길이 부족 등으로 압축시킬 수 있다. 이에 대한 대책으로써 펀칭전단에 의한 기초 상판부 두께가 부족한 문제와 앵커재 길이 부족 문제에 대한 기초강도 보강방안을 분석하고자 한다.

  • PDF

Charateristics Analysis of development Model for Increased Ampacity Conductor using AMC (AMC를 이용한 송전용량 증대용 전선 개발 모델 특성 분석)

  • Sim, Sun-Bo;Min, Byeong-Wook;Wi, Hwa-Bok;Park, Jae-Ung;Yoon, Seong-Jong
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.452-454
    • /
    • 2002
  • In case the overload of an existing power line is expected as the consumption of electric power increase, we substitute STACIR/AW which has better thermal characteristic for ACSR. That can approximately double the transmission capacity. In that case the mechanical characteristics of STACIR/AW should meet the design condition of the existing tower. However, the strength of invar in STACIR/AW is lower than that of steel in ACSR, which makes it difficult to keep the safety of a conductor specially in a long span In this regard, this paper presents the new conductor model using the AMC and the analysis of its characteristics.

  • PDF

Reinforcement Method of Power Transmission Line Tower Basement (송전철탑 무근기초 보강공법 시공기술 고찰)

  • Hwang, Jong-Sun;Lee, Dal-Hyung;Lee, Kyoung-Wook;Choi, Sung-Woo;Kim, Sung-Ho;Kim, Jae-Joon
    • Proceedings of the KIEE Conference
    • /
    • 2009.04a
    • /
    • pp.15-17
    • /
    • 2009
  • 송전선로 철탑은 비교적 작용하는 하중이 크고 바람과 피빙의 영향을 많이 받는 구조물로써 이를 안정적으로 지탱하기 위해서는 튼튼한 기초를 필요로 한다. 그러나 무근콘크리트 기초는 재료의 특성상 휨인장력에 대하여는 지지력이 없어 철탑기초로는 부적절한 구조물이다. 본 고에서는 무근콘크리트 기초에 대한 철근 콘크리트 보강공법 시공기술에 대하여 고찰하고자 한다.

  • PDF

Lightning Surge Analysis in 154 kV S/S due to Flashover on the 4 Circuits Tower (4회선 인입철구 구조를 가진 154 kV 변전소의 뇌과전압 해석)

  • Woo, J.W.;Shim, E.B.;Kwak, J.S.;Choi, B.J.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.1888-1890
    • /
    • 2000
  • This paper describes the analysis results for the protection of lightning surge at 154 kV substation. We found that the surge arrester is needed at the inlet structure. The maximum overvoltage is about 1,500 kV at the circuit breaker without the surge arrester at the inlet structure. This value can be lower than 600 kV by installing the surge arrestor at the inlet structure. In addition to the incoming surge from transmission line, the shield wire should be considered to prevent the shielding failure by the direct lightning stroke.

  • PDF