The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River

230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용)

  • Published : 1982.12.01

Abstract

East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

Keywords