AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법 (Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.415-422
    • /
    • 2014
  • 본 연구는 공공건축물의 실적공사비 분석을 통해 총공사비에 대한 적정보정율을 기초자료로 제시하고자 한다. 이에 대해 조달청에서 발주한 2009~2011년에 준공된 53개 프로젝트를 연구 대상으로 하였다. 공사비 분석은 주요 공정인 건축, 기계, 전기, 통신, 부대시설에 대하여 빈도론적 관점에서 중위수를 활용한 절대오차율을 기반으로 총공사비에 대해 비교 분석하였다. 이를 통해 적합회귀모형을 선정하고 보정율을 책정하였다.

사무소 건물의 HVAC&R 시스템 공사비 분석방법 및 예측에 관한 연구 (Cost Analysis Study : Development of HVAC&R System Cost Estimation and Prediction Methodology for Office Buildings)

  • 조진균;신승호;김종헌
    • 설비공학논문집
    • /
    • 제26권3호
    • /
    • pp.115-121
    • /
    • 2014
  • HVAC&R system costs can often be one of the most expensive components, representing approximately 15% of the total construction cost for office buildings. Despite their significant importance, there is a lack of a consistent and homogeneous framework to approximate the estimate research. This research deals with the prediction methodology of HVAC&R system cost with the aim of establishing a common idea for the analysis of the construction cost estimate. Our approach deals with the concept of an HVAC&R set that is composed of subsystems. The matrix combination analysis is examined, and total 960 HVAC&R system cost estimation can be implemented to large scale office buildings.

신·재생에너지 공급의무화제도(RPS) 비율을 고려한 타당성 분석의 공사비 산정 프로세스 (Process of Cost Estimation in Feasibility Analysis Considering ratio of Renewable Portfolio Standard)

  • 양현주;김종협;한상원;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.44-45
    • /
    • 2014
  • Recently the Korean government also has strictly restricted a law such as GBCC(Green Building Certification Criteria)and RPS(Renewable Portfolio Standard) on the construction. Especially the government announced a obligation of renewable energy consumption over 12% for all the public buildings of total area over 1,000㎡ since 2014. Regarding to the policy, this study presented the economics of energy analysis of the public office buildings that supplies 12% renewable energy output in the early stage of construction project. This paper calculated on CO2 emission by the geothermal, solar heat, and solar photovoltaic system and estimated the saving cost. Reduced cost through the energy saving are predicted to influence on the total construction cost. As a result air pollution and energy saving cost are expected that renewable energy system would be saving total initial cost of construction on planning phase.

  • PDF

설계변경에 의한 공사비의 증감에 관한 연구 (The Research about Increase and Decrease of the Construction Cost by the Alteration of Design)

  • 임칠순;이규철
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.106-113
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36$\%$) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose tool cost amounts to 2,009,000,000 won (1.37$\%$) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher material cost Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

택지개발사업의 공공주택건설공사비 추정의 실증적 분석 (An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project)

  • 김성희
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.81-88
    • /
    • 2011
  • 최근, 공공주택에 대한 소비자의 요구사항이 더욱 다양해지는 반면, 이를 공급하는 공급자 입장에서 개발사업의 불확실성은 상대적으로 증가되고 있어 건설공사 예정가격의 불확실성을 더욱 가속시키는 요인으로 작용하고 있다. 이에 본 연구는 택지개발사업 공공주택건설공사의 사업초기단계에서 공사비를 합리적으로 추정하여 발주자 입장에서 적정한 자금 투자계획 마련과, 공사수행 전반의 원가관리를 지원할 수 있는 신뢰성 있는 도구 개발을 목적으로 하였다. 2007년 상반기에서 2008년 상반기에 설계된 총 20개 공공아파트 단지를 사례로 하여 회귀분석을 실시하였다. 사례의 대표성 및 설명력을 높이기 위해 건축, 기계, 토목, 승강기, 조경, 전기, 통신공사의 단지 내 총공사금액을 합산하여 1개 표본으로 활용하였다. 또한 모형의 적합성과 실제 활용도를 높이기 위해 총공사비를 설계, 계약, 준공금액으로 구분하여 분석을 다양화 하였다. 개발모형을 실제공사비와 검증한 결과 총공사비를 준공, 설계 금액으로 설정한 추정모델은 오차율 2%이내의 매우 우수한 결과를 보였다. 본 연구를 통해 개발한 공사비 추정모델은 사업초기단계에서 소수의 데이터만으로 실제공사비에 근접하게 개략공사비를 추정할 수 있는 유용한 도구로 활용되리라 기대한다.

실적자료에 의한 적정 건축공사비 산정 방법에 관한 사례연구 (A Study of the Application for Proper Construction Cost Estimating Method based on the Actual Cost Data)

  • 조재호;박상준;전재열
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.383-386
    • /
    • 2001
  • 본 연구는 실적공사비적산 제도의 정착을 위한 적정 예정공사비 산정방법 제안 및 사례분석을 통해 타당성 검증을 목적으로 한다. 건설공사비는 미래의 예측으로 불확실성을 가지고 있으며 이는 과거의 실적에 의하여 추정할 수 있다. 실적자료는 건설환경의 다양성, 개별성, 특수성 등을 나타내줌으로서 이에 대한 자료조건 분류 및 보정으로 불확실한 공사비론 예측 가능하게 한다. 따라서 본 연구에서는 조건분류, 물가보정 및 확률적 개념을 도입하여 프로젝트 초기단계에서 및 실행예정가 산정시 적정 비용의 산정방법을 제안하고자 한다.

  • PDF

보용 시스템 거푸집의 전용계획 자동화 알고리즘 기초연구 (Basic study of reuse planning automation algorithms on system forms that are used on girders and beams)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.7-8
    • /
    • 2015
  • Formwork accounts for 10% of the total construction cost and 30~40% of the framework cost, which is a fairly large part. Various system forms were developed for improved economic feasibility and constructability of formwork and for reduced construction duration. In general, the price of system forms per unit area is higher than that of the conventional method, yet the total construction cost can be reduced through higher reusability and constructability. However, if the reusability of forms is excessively increased to cut down the material cost, it may increase the construction duration, which will result in cost increase. On the other hand, if the reusability is decreased for reduction of construction duration, it may lead to cost increase caused by excessive input of materials. To solve such a problem, an algorithm for simplified reuse planning that meets the requirements of construction duration, cost, quality and safety is required. In this regard, the study intends to perform a fundamental research for development of reuse planning automation algorithms on system forms that are used on girders and beams.

  • PDF

공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로- (Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System-)

  • 장철기
    • 한국건설관리학회논문집
    • /
    • 제14권3호
    • /
    • pp.12-21
    • /
    • 2013
  • 정부 재정지출의 효율성 제고를 위해 도입된 총사업비관리제도는 그간 대형 신규 공공투자사업 추진 시 적정한 절차를 순차적으로 거치도록 의무화하고, 총사업비 증가율을 억제하는 등 일부 성과가 있었다. 도입 18년이 지난 시점에서 공공건설사업의 사업비 관리의 근간이 되는 총사업비관리제도에 대한 적용 실태 및 제반 운영에 대한 사업참여자들의 인식을 조사하고, 설문을 통하여 운영상의 문제점을 도출하여 이에 대한 개선방안을 제시하였다. 기본적으로 공공건설사업의 사업비 관리는 사업 초기 단계에 예산을 정확히 산정하고, 후속 단계에서 이를 지키려는 노력을 시행하며, 확정된 예산에 가장 부합하는 사업의 가치 확보라는 개념에 입각해서 계획하고 관리하여야 한다. 공공건설사업의 총사업비관리의 체계화하고, 담당자의 전문성을 제고하는 한편 발주처의 자율성을 확대하여야한다. 무엇보다도 총사업비관리 대상사업의 적기 준공을 유도하여 사업기간 지연으로 인한 총사업비의 증액을 방지 할 수 있는 여건 조성이 필요하다.

실적자료 분석에 의한 적정 공사비 산정방법의 전산화 알고리즘 구축에 관한 연구 (A Study on the Construction of Computerized Algorithm for Proper Construction Cost Estimation Method by Historical Data Analysis)

  • 전재열
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.192-200
    • /
    • 2003
  • 본 연구는 공공건설 공사에 실적자료에 의한 공사비산정 방법의 전산화 적용을 목적으로 먼저 실적공사비의 정의 및 구조와 현행 실적공사비 운영체계 이해를 통해 전산화의 문제점 및 개선기준을 공사비 산정방법 중심으로 분석 기술하였으며 제안한 기준에 따라 전산화 알고리즘을 제시하였다. 기존 예정공사비 산정방법은 일반적인 공종별 분류에 따른 실적자료조건과 단순히 물가지수, 연면적규모에 따른 시공단가를 적용함으로서 공사비산정의 정확성이 요구되며, 본 연구는 이에 대한 개선 안으로 부위와 부분별 공종분류 방식에 의한 데이터 추출조건으로 실적자료의 적용성과 신뢰성을 높였다. 또한 물량규모에 의한 공사비 변동요인을 물량규모 대비 단가의 확률적 회귀분석으로 예측 추정하여 실행 가능한 적정 공사비 산정방법을 제시하였다. 따라서 본 연구에서는 전산화 적용 방안으로 확률적 예정공사비산정방법을 기준으로 시스템 프로세스를 각 영역별로 구축하고 그에 따른 윈도우 어플리케이션 활용 툴과 개별 전산화에 대한 알고리즘을 구축하였다.