• Title/Summary/Keyword: time to peak

Search Result 4,359, Processing Time 0.033 seconds

A study of calculate a time to peak enhancement of contrast level by using blood flow (혈류에 의한 조영제 peak time의 산출에 관한 연구)

  • Choi, Kwan-Woo;Son, Soon-Yong;Lee, Ho-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.5
    • /
    • pp.2315-2321
    • /
    • 2013
  • This study attempt to develope and suggest a new, minimize side effects process for calculate a time to peak enhancement of contrast level by using blood flow instead of current mathematical process. We conducted a studies 127 patients who performed the CE MRA by using test-contrast inject way. We used measurements of a contrast inflow time and time to peak enhancement of contrast level of each cerebrovascular branch for similarity of witch cerebrovascular branch calculate a time to peak enhancement of contrast level by using blood flow in image compared with calculation a time to peak enhancement of contrast level by using current mathematical process after contrast enhancement. In this study, confidence interval were used if the variable is continuous variable; there is differences between 4 groups exist but in group 1, there is no difference with time in peak enhancement of contrast level by using mathematical method to inflow time in sinus sigmoideus. it was significant statistically, in addition there was significant low heterogeneity in Bland Altman plot. Thus, apply a new calculate a time to peak enhancement of contrast level by using blood flow method will minimize damage caused by side effect, maintain quality of image, easy and fast access. It should provide a space for the exchange of current calculate a time to peak enhancement of contrast level by using mathematical process.

Real-Time Peak Shaving Algorithm Using Fuzzy Wind Power Generation Curves for Large-Scale Battery Energy Storage Systems

  • Son, Subin;Song, Hwachang
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.14 no.4
    • /
    • pp.305-312
    • /
    • 2014
  • This paper discusses real-time peak shaving algorithms for a large-scale battery energy storage system (BESS). Although several transmission and distribution functions could be implemented for diverse purposes in BESS applications, this paper focuses on a real-time peak shaving algorithm for an energy time shift, considering wind power generation. In a high wind penetration environment, the effective load levels obtained by subtracting the wind generation from the load time series at each long-term cycle time unit are needed for efficient peak shaving. However, errors can exist in the forecast load and wind generation levels, and the real-time peak shaving operation might require a method for wind generation that includes comparatively large forecasting errors. To effectively deal with the errors of wind generation forecasting, this paper proposes a real-time peak shaving algorithm for threshold value-based peak shaving that considers fuzzy wind power generation.

A Study on Estimate Model for Peak Time Congestion

  • Kim, Deug-Bong;Yoo, Sang-Lok
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.3
    • /
    • pp.285-291
    • /
    • 2014
  • This study applied regression analysis to evaluate the impact of hourly average congestion calculated by bumper model in the congested area of each passage of each port on the peak time congestion, to suggest the model formula that can predict the peak time congestion. This study conducted regression analysis of hourly average congestion and peak time congestion based on the AIS survey study of 20 ports in Korea. As a result of analysis, it was found that the hourly average congestion has a significant impact on the peak time congestion and the prediction model formula was derived. This formula($C_p=4.457C_a+29.202$) can be used to calculate the peak time congestion based on the predicted hourly average congestion.

A study of contrast agent peak time using biomechanics factors experimental contrast medium infusion test using at contrast enhanced magnetic resonance angiography (조영증강검사 시 생체 요인을 이용한 조영제 peak time에 관한 연구)

  • Son, Soon-Yong;Kim, Yoon-Shin;Choi, Kwan-Woo;Seo, Sung-Mi;Min, Jung-Whan;Yoo, Beong-Gyu;Lee, Jong-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.786-792
    • /
    • 2013
  • In this study was explored minimize side effects due to the additional injection of contrast medium and maintaining a high resolution imaging applied to the inspection and analysis of the contrast medium that affect the peak time biomechanics factors. Included 48 patients using the test bolus method, after measuring a patient's biomechanics factors of inspection before and during the test, correlation between contrast medium peak time and learn, matches the regression equation calculated and measured contrast medium peak time was assessed by the Bland Altman plot. Research result, inspections of SBP, HR contrast medium peak time and a significant negative correlation was, step 1, every increase, the contrast medium peak time significantly to -0.018 and -0.159 decreased, a fairly high concordance no difference between the two method. In conclusion, the regression equation using the existing methods, while maintaining excellent image quality that contrast medium is reduced to a patient, it can conclude that the alternative to the existing methods.

Development of Runoff Hydrograph Model for the Derivation of Optimal Design Flood of Agricultural Hydraulic Structures(II) (농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선 모형의 개발(II))

  • 이순혁;박명근;맹승진
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.38 no.3
    • /
    • pp.112-126
    • /
    • 1996
  • This study was conducted to develop an optimal runoff bydrograph model by comparison of the peak discharge and time to peak between observed and simulated flows derived by four different models, that is, linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models under the conditions of heavy rainfalls with regionally uniform rainfall intensity in short durations at nine small watersheds. The results obtained through this study can be summarized as follows. 1. Parameters for four models including linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models were calibrated using a trial and error method with rainfall and runoff data for the applied watersheds. Regression analysis among parameters, rainfall and watershed characteristics were established for both linear time-invariant and nonlinear time-invariant models. 2. Correlation coefficients of the simulated peak discharge of calibrated runoff hydrographs by using four models were shown to be a high significant to the peak of observed runoff graphs. Especially, it can be concluded that the simulated peak discharge of a linear time-variant model is approaching more closely to the observed runoff hydrograph in comparison with those of three models in the applied watersheds. 3. Correlation coefficients of the simulated time to peak of calibrated runoff hydrographs by using a linear time-variant model were shown to be a high significant to the time to peak of observed runoff hydrographs than those of the other models. 4. The peak discharge and time to peak of simulated runoff hydrogaphs by using linear time-variant model are verified to be approached more closely to those of observed runoff hydrographs than those of three models in the applied watersheds. 5. It can be generally concluded that the shape of simulated hydrograph based on a linear time-variant model is getting closer to the observed runoff hydrograph than those of three models in the applied watersheds. 6. Simulated hydrographs using the nonlinear time-variant model which is based on more closely to the theoritical background of the natural runoff process are not closer to the observed runoff hydrographs in comparison with those of three models in the applied watersheds. Consequently, it is to be desired that futher study for the nonlinear time-variant model should be continued with verification using rainfall-runoff data of the other watersheds in addition to the review of analyical techniques.

  • PDF

A1gorithm Embodiment for Automatic Pump Operation Pattern (원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현)

  • Byun, Doo-Gyoon;Yoon, Young-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

Development of Runoff Hydrograph Model for the Derivation of Optimal Design Flood of Agricultural Hydraulic Structures(1) (농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선모형의 개발(I))

  • 이순혁;박명근;맹승진
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.3_4
    • /
    • pp.34-47
    • /
    • 1995
  • It is experienced fact as a regular annual event that the structure to he designed on unreasonable flood for the agricultural structures including reservoirs have been brought not only loss of lives, but also enormous property damage. For the solution of this problem at issue, this study was conducted to develop an optimal runoff hydrograph model by comparison of the peak flows and time to peak between observed and simulated flows derived by linear time-invariant and linear time-variant models under the condition of having a short duration of heavy rainfall with uniform rainfall intensity at nine small watersheds which are within the range of 55.9 to 140.7 square kilometers in area in Han, Geum, Nagdong and Yeongsan Rivers. The results obtained through this study can be summarized as follows. 1. Storage constants and Gamma function arguments were calculated within the range of 1.2 to 6.42 and of 1.28 to 8.05 respectively by the moment method as the parameters for the analysis of runoff hydrograph based on linear time-invariant model. 2. Parameters for both linear time-invariant and linear time-variant models were calibrated with nine gaged watershed data, using a trial and error method. The resulting parameters including Gamma function argument, N and storage constant, K for linear time-invariant model were related statistically to watershed characteristic variables such as area, slope, length of main stream and the centroid length of the basin. 3. Average relative errors of the simulated peak discharge of calibrated runoff hydrographs by using linear time-variant and linear time-invariant models were shown to be 0.75 and 5.42 percent respectively to the peak of observed runoff hydrographs. Correlation coefficients for the statistical analysis in the same condition were shown to be 0.999 and 0.978 with a high significance respectively. Therefore, it can be concluded that the accuracy of a linear time-variant model is approaching more closely to the observed runoff hydrograph than that of a linear time-invariant model in the applied watersheds. 4. Average relative errors of the time to peak of calibrated runoff hydrographs by using linear time-variant and linear time-invariant models were shown to be 16.44 and 19.89 percent respectively to the time to peak of observed runoff hydrographs. Correlation coefficients in the same condition were also shown to be 0.999 and 0.886 with a high significance respectively. 5. It can be seen that the shape of simulated hydrograph based on a linear time- variant model is getting closer to the observed runoff hydrograph than that of a linear time-invariant model in the applied watersheds. 6. Two different models were verified with different rainfall-runoff events from data for the calibration by relative error and correlation analysis. Consequently, it can be generally concluded that verification results for the peak discharge and time to peak of simulated runoff hydrographs were in good agreement with those of calibrated runoff hydrographs.

  • PDF

Time-Delay Effects on DC Characteristics of Peak Current Controlled Power LED Drivers

  • Jung, Young-Seok;Kim, Marn-Go
    • Journal of Power Electronics
    • /
    • v.12 no.5
    • /
    • pp.715-722
    • /
    • 2012
  • New discrete time domain models for the peak current controlled (PCC) power LED drivers in continuous conduction mode include for the first time the effects of the time delay in the pulse-width-modulator. Realistic amounts of time delay are found to have significant effects on the average output LED current and on the critical inductor value at the boundary between the two conduction modes. Especially, the time delay can provide an accurate LED current for the PCC buck converter with a wide input voltage. The models can also predict the critical inductor value at the mode boundary as functions of the input voltage and the time delay. The overshoot of the peak inductor current due to the time delay results in the increase of the average output current and the reduction of the critical inductor value at the mode boundary in all converters. Experimental results are presented for the PCC buck LED driver with constant-frequency controller.

An Offer of Relation between Rainfall and Unit Hydrograph in a Small Basin (소규모 유역에서 강우와 단위유량도의 관계 제시)

  • Yoo, Ju-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.7
    • /
    • pp.635-643
    • /
    • 2010
  • A representative unit hydrograph responding to a small basin is used to calculate the flood discharge in the basin. The peak discharge and the time to peak of the unit hydrograph are dealt with its characteristic values. In this study it is shown and analyzed the fluctuations at peak discharges and times to peak of unit hydrographs by rainfall storms in a small national basin $8.5\;km^2$ wide are no small. And on assumption that a major factor in the fluctuations of the unit hydrographs in a small basin be rainfall intensity of a rainstorm, both relations of peak discharge and time to peak with rainfall intensity are suggested as exponential functions respectively. In this result although it is a limit of the study in which its result is accompanied with not small dispersion in the peak values of unit hydrograph due to a defect in used data it is sure an averaging regression relation between peak discharge and time to peak with rainfall intensity as identified in this study has hydrological worth from the complementary viewpoint of the theory of unit hydrograph.

Relationship between Impact and Shear Forces, and Shock during Running (달리기 시 충격력과 충격 쇼크 변인들과의 관계)

  • Park, Sang-Kyoon;Ryu, Ji-Seon
    • Korean Journal of Applied Biomechanics
    • /
    • v.30 no.2
    • /
    • pp.145-154
    • /
    • 2020
  • Objective: The purpose of this study was to determine the relationship between impact and shear peak force, and tibia-accelerometer variables during running. Method: Twenty-five male heel strike runners (mean age: 23.5±3.6 yrs, mean height: 176.3±3.3 m/s, mean mass: 71.8±9.7 kg) were recruited in this study. The peak impact and anteroposterior shear forces during treadmill running (Bertec, USA) were collected, and impact shock variables were computed by using a triaxial accelerometer (Noraxon, USA). One-way ANOVA was used to test the influence of the running speed on the parameters. Pearson's partial correlation was used to investigate the relationship between the peak impact and shear force, and accelerometer variables. Results: The running speed affected the peak impact and posterior shear force, time, slope, and peak vertical and resultant tibial acceleration, slope at heel contact. Significant correlations were noticed between the peak impact force and peak vertical and resultant tibia acceleration, and between peak impact average slope and peak vertical and resultant tibia acceleration average slope, and between posterior peak (FyP) and peak vertical tibia acceleration, and between posterior peak instantaneous slop and peak vertical tibial acceleration during running at 3 m/s. However, it was observed that correlations between peak impact average slope and peak vertical tibia acceleration average slope, between posterior peak time and peak vertical and resultant tibia acceleration time, between posterior peak instantaneous slope and peak vertical tibial acceleration instantaneous slope during running at 4 m/s. Conclusion: Careful analysis is required when investigating the linear relationship between the impact and shear force, and tibia accelerometer components during relatively fast running speed.