• Title/Summary/Keyword: time delays

Search Result 887, Processing Time 0.026 seconds

Effect of Delayed Transplanting plus Water Stress on the Growth and Yield of the Rice Plants (한발로 인한 벼의 이앙지연 및 수분결핍장애가 생육 및 수량에 미치는 영향)

  • 권용운;소창호;권순국
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.28 no.3
    • /
    • pp.79-88
    • /
    • 1986
  • Drought occurs most frequently and severely around transplanting season of the rice plants in Korea. Shortage of water due to drought for the paddy fields often delays transplanting, and less often the rice plants are subjected to water stress after delayed transplanting. The present study aimed at quantification of the rice crop loss due to delayed transplanting, different inten3ity of water stress, and the combined effect of delay in transplanting followed by water stress for better use of limited water for irrigation under drought. The rice variety Chucheong, a japonica, and Nampung, an indica x japonica, were grown, transplanted to 1/200 a plastic pots, and subjected to different timing of transplanting and degree of water stress under a rainfall autosersing, sliding clear plastic roof facility with completely randomized arrangement of 5 replications. The results obtained are summarized as follows: 1.Twelve days or 22 days delay in transplanting without water stress reduced rice yield by 25% and 43% in the japonica variety, and by 15% and 60% in the indica x japonica variety. 2.The 10 days or 20 days water stress developed without irrigation after drainage in the rice plants transplanted at proper time lowered the water potential at the paddy soil 10cm deep to -4 bar, and -12 bar and caused rice yield reduction by 14%, and 45% in the japonica variety and by 8%, and 50% in the indica X japonica variety. 3.The 12 days delay in transplanting and 10 days or 20 days water stress reduced rice yield by 39% and 59% in the japonica variety, and by 38% and 52% in the indica x japonica variety. The 22 days delay in transplanting plus 10 days water stress caused yield reduction by 76%, i.e. meaningless yield, in both varieties. 4.The intermittent irrigation just to wet the soil body for 10 days after 10 days water stress without irrigation increased rece yield by 12 to 16% compared to the rice plants water stessed without irrigation continuously for 20 days in both varieties respectively. 5.The above results suggest strongly 1) to transplant the rice plants at proper .time even with some water stress rather than delay for sufficient water from later rainfall, and 2) to distribute insufficient irrigation water to broader area of transplanted rice with limited irrigation for better use of limited irrigation water. A greater sensitivity of japonica variety to a moderate water stress than the indica X japonica variety during initial rooting and tillering stage was noticed. To cope with frequent drought in rice culture, firstly the lasting time of transplanting without yield reduction should be clarified by region and variety, and secondly a scheme of rational distribution of limited water should be developed by region with better knowledge on the varietal distribution of limited water should be developed by region with better knowledge on the varietal responses to varying intensity of water stress.

  • PDF

Energy-Efficient Routing Protocol based on Interference Awareness for Transmission of Delay-Sensitive Data in Multi-Hop RF Energy Harvesting Networks (다중 홉 RF 에너지 하베스팅 네트워크에서 지연에 민감한 데이터 전송을 위한 간섭 인지 기반 에너지 효율적인 라우팅 프로토콜)

  • Kim, Hyun-Tae;Ra, In-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.3
    • /
    • pp.611-625
    • /
    • 2018
  • With innovative advances in wireless communication technology, many researches for extending network lifetime in maximum by using energy harvesting have been actively performed on the area of network resource optimization, QoS-guaranteed transmission, energy-intelligent routing and etc. As known well, it is very hard to guarantee end-to-end network delay due to uncertainty of the amount of harvested energy in multi-hop RF(radio frequency) energy harvesting wireless networks. To minimize end-to-end delay in multi-hop RF energy harvesting networks, this paper proposes an energy efficient routing metric based on interference aware and protocol which takes account of various delays caused by co-channel interference, energy harvesting time and queuing in a relay node. The proposed method maximizes end-to-end throughput by performing avoidance of packet congestion causing load unbalance, reduction of waiting time due to exhaustion of energy and restraint of delay time from co-channel interference. Finally simulation results using ns-3 simulator show that the proposed method outperforms existing methods in respect of throughput, end-to-end delay and energy consumption.

Application of Critical Pathway in Trauma Patients (외상 환자 관리에서 Critical Pathway의 적용)

  • Shim, Hongjin;Jang, Ji Yong;Lee, Jae Gil;Kim, Seonghwan;Kim, Min Joung;Park, You Seok;Park, Inchel;Kim, Seung Ho
    • Journal of Trauma and Injury
    • /
    • v.25 no.4
    • /
    • pp.159-165
    • /
    • 2012
  • Purpose: For trauma patients, an early-transport and an organized process which are not delayed in hospital stage are necessary. Our hospital developed a procedure, the trauma Critical Pathway (CP), through which a traumatic patient has the priority over other patients, which makes the diagnostic and the therapeutic processes faster than they are for other patients. Methods: The records of patients to whom Trauma CP were applied from January 1, 2011 through April 15. 2012. were reviewed. We checked several time intervals from ER visiting to decision of admission-department, to performing first CT, to applying angio-embolization, to starting emergency operation and to discharging from ER. In addition, outcomes such as duration of ICU stay, hospital stay and mortality were checked and analyzed. Results: The trauma CP was applied to a total of 143 patients, of whom, 48 patients were excluded due to pre-hospital death, ER death, transferring to other hospital and not severe injury. Thus 95 patients (male 64, 67.3%) were enrolled in this study. Fifty-nine patients(62.1%) were injured by the traffic accident. The mortality rate was 10.5% and the mean Revised Trauma Score (RTS) of the patients was $6.4{\pm}2.0$. After visiting ER, decision making for admission was completed, on average, in 3 hours 10 seconds. The mean time intervals for the first CT, angio-embolization, surgery and discharge were 1 hour 20 minutes, 5 hours 16 minutes, 7 hours 26 minutes and 6 hours 13 minutes, respectively. Conclusion: The trauma CP did not show the improvement of time interval outcome, as well as mortality rate. However, this test did show that the trauma CP might be able to reduce delays in procedures for managing trauma patients at the university-based hospitals. To find out the benefit of CP protocol, a large scaled data is required.

Feedback Phenomenon in Technology Art (예술 공학의 피드백)

  • Kim Hyung-Gi
    • Science of Emotion and Sensibility
    • /
    • v.8 no.4
    • /
    • pp.423-433
    • /
    • 2005
  • The computer hardware development has provided many chances of emergence between art and technology. In many cases today's interactive artworks cannot be completed without audience's participation. The interactive production process with technical supplementation can be celled feedback. Mr. Nam Jun Paik showed 'Participant TV' that interacts with audience's response in real time. It means artwork changes with the constantly changing value from the data set from human visual perception. Dan Graham showed another feedback related work, which delays 5second playback in mirror that implies consequence of time. Today's media art has to sublimate coincidence, time ant audience into philosophical artwork through consonance that comes with video and sound as we can see from Bill Viola. Stelarc produced artworks. That use input data that is weak signals from brain, muscles. Through a terminal display with player, body expanded meaning of media. Jeffrey Shaw's 'Legible City' provided a fabrication of the reality with the interaction of bicycle's pedal speed and steering direction that is controlled by 4river. RE:MARK used microphone as input device as Edmond Couchot's 'Je same a la vent' and Nam Jun Paik's 'Participant TV' did. There is no communication without feedback between human being. The reality makes audience involved into artworks. That is the reason why feedback has to be natural. Through the feedback process, the originality of the idea is altered by audience. The feedback is not just part of flesh of artwork rather skeleton of it. Technological showoff cannot be art itself The perfection of technological application plan helps feedback that interacts with audience naturally in order that audience hoes not feel the feedback as artificial plan. Interactive media art has to be evolved into new media form with new integration feedback technology.

  • PDF

A Signal Detection Technique for OFDMA-based Wireless Mesh Networks with Different Time Delays (서로 다른 지연 시간을 갖는 OFDMA 기반의 Wireless Mesh Networks를 위한 신호 검출 기법)

  • Park, Chang-Hwan;Yoo, Hyun-Il;Kim, Yeong-Jun;Kwon, Dong-Seung;Cho, Yong-Soo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.6C
    • /
    • pp.495-505
    • /
    • 2010
  • In this paper, the effect of Near-Far Problem (NFP) among distributed nodes in OFDMA-based Wireless Mesh Networks (WMNs) is analyzed by investigating statistical characteristics of Time Difference of Arrival (TDoA) and Desired-to-Undesired power Ratio (DUR). In order to overcome the effects of Inter-Symbol Interference (ISI), Inter-Carrier Interference (ICI), and Inter Link Interference (ILI), caused by TDoA in WMNs, we derive effective SINR for each subcarrier, and then, propose the optimal starting point of FFT window which can minimize BER for each subcarrier. In addition, we propose a subcarrier-based Zero Forcing - 2 Dimensional Ordered Successive Interference Cancellation (ZF-2DOSIC) technique for signal detection in WMNs with TDoA. It is verified by simulation that the effective SINR and uncoded BER performances of the proposed signal detection technique for OFDMA-based WMNs are significantly improved, compared with those of conventional technique.

A Passive Traffic Signal Priority Control Algorithm for Emergency Vehicles (긴급차량 우선신호 센터제어 알고리즘 개발)

  • Lee, Jongwoo;Lee, Soong-bong;Lee, Jinsoo;Um, Ki Hun;Lee, Young-Ihn
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.16 no.3
    • /
    • pp.110-119
    • /
    • 2017
  • This study develops a passive traffic signal priority control algorithm for emergency vehicles. The passive priority control estimates and applies signal times for each signalized intersection on the emergency vehicle's route when an emergency call is received. As signals are controlled before the emergency vehicle leaves for its destination, it is possible to clear the queues at each intersection more effectively. Most of the previous studies applied preemption, which ends green time of cross streets when the emergency vehicle arrives at each intersection. This study applies green extension and early green in order not to shift the order of phases, and guarantees minimum green time for each phase. Simulation results show that the delay of emergency vehicles decreases when the signals are controlled. It is expected that delays can be decreased further by integrating the active priority control with the passive priority control algorithm presented in this study.

On-site Inventory Management Plan for Construction Materials Considering Activity Float Time and Size of a Stock Yard (공정별 여유시간과 야적장 규모를 고려한 건설자재의 현장 재고관리 방안 연구)

  • Kim, Yong Hwan;Yoon, Hyeong Seok;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.79-89
    • /
    • 2023
  • The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other hand, construction sites that do not store materials have insufficient inventory, making it difficult to respond to demands such as sudden design changes. Ordering materials is then subject to delays and extra costs. Although securing an appropriate amount of inventory is important, in many cases, material management on a construction site depends on the experience of the site manager, so a reasonable material inventory management plan that reflects the construction conditions of a site is required. This study proposes an economical material management method by reflecting variables such as the status of the preceding and following activities, site size, material delivery cost, timing of an order, and quantity of orders. To this end, we set the appropriate inventory amount while adjusting related activities in the activity network, using float time for each activity, the size of the yard, and the order quantity as the main variables, and applied a genetic algorithm to this process to suggest the optimal order timing and order quantity. The material delivery cost derived from the results is set as a fitness index and the efficiency of inventory management was verified through a case application.

A Machine Learning-based Total Production Time Prediction Method for Customized-Manufacturing Companies (주문생산 기업을 위한 기계학습 기반 총생산시간 예측 기법)

  • Park, Do-Myung;Choi, HyungRim;Park, Byung-Kwon
    • Journal of Intelligence and Information Systems
    • /
    • v.27 no.1
    • /
    • pp.177-190
    • /
    • 2021
  • Due to the development of the fourth industrial revolution technology, efforts are being made to improve areas that humans cannot handle by utilizing artificial intelligence techniques such as machine learning. Although on-demand production companies also want to reduce corporate risks such as delays in delivery by predicting total production time for orders, they are having difficulty predicting this because the total production time is all different for each order. The Theory of Constraints (TOC) theory was developed to find the least efficient areas to increase order throughput and reduce order total cost, but failed to provide a forecast of total production time. Order production varies from order to order due to various customer needs, so the total production time of individual orders can be measured postmortem, but it is difficult to predict in advance. The total measured production time of existing orders is also different, which has limitations that cannot be used as standard time. As a result, experienced managers rely on persimmons rather than on the use of the system, while inexperienced managers use simple management indicators (e.g., 60 days total production time for raw materials, 90 days total production time for steel plates, etc.). Too fast work instructions based on imperfections or indicators cause congestion, which leads to productivity degradation, and too late leads to increased production costs or failure to meet delivery dates due to emergency processing. Failure to meet the deadline will result in compensation for delayed compensation or adversely affect business and collection sectors. In this study, to address these problems, an entity that operates an order production system seeks to find a machine learning model that estimates the total production time of new orders. It uses orders, production, and process performance for materials used for machine learning. We compared and analyzed OLS, GLM Gamma, Extra Trees, and Random Forest algorithms as the best algorithms for estimating total production time and present the results.

A Study on the high-speed Display of Radar System Positive Afterimage using FPGA and Dual port SRAM (FPGA와 Dual Port SRAM 적용한 Radar System Positive Afterimage 고속 정보 표출에 관한 연구)

  • Shin, Hyun Jong;Yu, Hyeung Keun
    • Journal of Satellite, Information and Communications
    • /
    • v.11 no.4
    • /
    • pp.1-9
    • /
    • 2016
  • This paper was studied in two ways with respect to the information received from the video signal separation technique of PPI Scop radar device. The proposed technique consists in generating an image signal through the video signal separation and synthesis, symbol generation, the residual image signal generation process. This technology can greatly improve the operating convenience with improved ease of discrimination, screen readability for the operator in analyzing radar information. The first proposed method was constructed for high-speed FPGA-based information processing systems for high speed operation stability of the system. The second proposed method was implemented intelligent algorithms and a software algorithm function curve associated resources.This was required to meet the constraints on the radar information, analysis system. Existing radar systems have not the frame data analysis unit image. However, this study was designed to image data stored in the frame-by-frame analysis of radar images with express information MPEG4 video. Key research content is to highlight the key observations expresses the target, the object-specific monitoring information to the positive image processing algorithm and the function curve delays. For high-definition video, high-speed to implement data analysis and expressing a variety of information was applied to the ARM Processor Support in Pro ASIC3.

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.