• 제목/요약/키워드: time deadline

검색결과 264건 처리시간 0.026초

고객의 납기마감시간이 존재하는 이기종 차량경로문제의 발견적 해법 (A Heuristic for Fleet Size and Mix Vehicle Routing Problem with Time Deadline)

  • 강충상;이준수
    • 산업경영시스템학회지
    • /
    • 제28권2호
    • /
    • pp.8-17
    • /
    • 2005
  • This paper dealt with a kind of heterogeneous vehicle routing problem with known demand and time deadline of customers. The customers are supposed to have one of tight deadline and loose deadline. The demand of customers with tight deadline must be fulfilled in the deadline. However, the late delivery is allowed to customers with loose deadline. That is, the paper suggests a model to minimize total acquisition cost, total travel distance and total violation time for a fleet size and mix vehicle routing problem with time deadline, and proposes a heuristic algorithm for the model. The proposed algorithm consists of two phases, i.e. generation of an initial solution and improvement of the current solution. An initial solution is generated based on a modified insertion heuristic and iterative Improvement procedure is accomplished using neighborhood generation methods such as swap and reallocation. The proposed algorithm is evaluated using a well known numerical example.

A Priority Scheme for IEEE 802.11 Wireless LAN

  • Jang, Yeong-Min
    • 한국통신학회논문지
    • /
    • 제25권12B호
    • /
    • pp.1996-2002
    • /
    • 2000
  • This paper investigates a priority scheme for IEEE 802.11 Carrier Sense Multiple Access/Collision Avoidance (CSMA/CA) protocol in order to provide short access times for priority frames (e.g. time-deadline traffic) even when the overall traffic on the wireless channel is heavy. Under the compatibility constraint for the IEEE 802.11 wireless LANs, two priority systems are simulated: no priority (current IEEE 802.11 standard) for time-deadline traffics and dynamic time-deadline priority. We evaluate algorithms to improve the time-deadline traffic performance using discrete event simulation (DES)

  • PDF

Embedded System Design을 위한 Real-Time System의 최적화된 Timing효과의 구현 (Timing Optimization of Real-Time System Design for Embedded Systems)

  • 박은정;정태경
    • 한국정보통신학회논문지
    • /
    • 제10권3호
    • /
    • pp.564-570
    • /
    • 2006
  • 본 고에서는 임베디드 시스템을 위한 새로운 이벤트 중심의 실시간 시스템의 디자인의 최적화에 대한 연구를 논하고자 한다. 이를 위해서는 대단위의 분산처리시스템을 만족하기 위한 종료시한 초과 처리기의 구현이 필수적이며, 이때 실시간 시스템에서의 타이밍을 조절하고 계측할 수 있는 종료시 한이 사용되어야 한다. 이러한 타이밍의 요소들은 보통 모델과 실제 시스템사이의 인터페이스에서 동작하는데, 여기서 실시간 시스템의 디자인을 위한 다양한 그래픽 언어들이 종료시한을 효과적으로 처리하도록 제고한다. 이 연구를 통하여 사용자수준에서의 임베디드 시스템을 위한 종료시한 초과 처리와 함께, RonRT라는 툴을 이용한 최적화된 종료시한 초과 처리기를 증명해 보이고자한다.

우선순위 스케줄링을 사용하는 실시간 시스템을 위한 정확한 확률적 분석 방법 (An Exact Stochastic Analysis Method for Priority-driven Real-time Systems)

  • 김강희
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제31권3_4호
    • /
    • pp.170-186
    • /
    • 2004
  • 최근 멀티미디어, 신호처리와 같은 실시간 응용들에 대해서 그 응용에 속한 태스크들이 일정한 확률로 마감시간을 만족하는 것을 보장하는, 소위 확률적 보장을 제공하는 것이 점점 더 중요해지고 있다. 확률적 보장을 제공하기 위해서는 주어진 시스템에서 각 태스크의 마감시간 위반확률(deadline miss probability)을 예측할 수 있는 분석 방법이 필요하다. 본 논문에서는 Rate Monotonic 또는 Earliest Deadline First와 같은 우선순위 스케줄링을 사용하는 시스템에서 각 태스크의 마감시간 위반확률을 정확하게 계산하는 분석 방법을 제안한다. 제안하는 분석 방법은 임의의 실행 시간 분포를 갖는 태스크들에 대해서 각각의 응답 시간 분포를 정확하게 계산함으로써 개별 태스크들의 마감시간 위반확률을 결정한다. 본 논문에서는 실험을 통해서 제안하는 분석 방법의 정확성을 검증하였고, 기존의 다른 분석 방법보다 우수함을 보였다.

소프트 실시간 시스템을 위한 두 단계 스케쥴링 알고리즘 (Two-level Scheduling for Soft Real-Time Systems)

  • 김재훈
    • 한국정보처리학회논문지
    • /
    • 제6권2호
    • /
    • pp.467-475
    • /
    • 1999
  • 본 논문은 소프트 실시간 시스템을 위한 스케쥴링을 간단히 하기 위하여 "두 단계 데드라인" 방법을 제안하였다. 각각의 작업은 두 개의 데드라인을 갖는데, 첫 번째 데드라인과 두 번째 데드라인이라 부른다. 첫 번째 데드라인은 일반 실시간 시스템의 데드라인과 같다. 두 번째 데드라인은 첫 번째 데드라인 보다 늦은 시각인데, 늦은 결과가 아직은 사용할 만한 가장 늦은 시각이다. 첫 번째 데드라인 이내에 끝난 일은 만점을 주지만, 첫 번째 데드라인을 놓치고 두 번째 데드라인 이내에 끝난 일에 대해서는 부분 점수만 인정한다. 본 논문에서, 첫 번째 데드라인, 두 번째 데드라인, 부분 점수 등을 고려하여 다이나믹하게 일들의 우선 순위를 정하는 방법을 고안하였다. 시뮬레이션 결과를 통하여 두 단계 스케쥴링 알고리즘이 소프트 실시간 시스템과 일시적으로 과부하가 걸린 하드 실시간을 처리하는데 적절한 방법임을 확인하였다.법임을 확인하였다.

  • PDF

CAN기반 실시간 시스템을 위한 확장된 EDS 알고리즘 개발 (Development of an Extended EDS(Earliest Deadline Scheduling) Algorithm for the CAN-Based Real-Time System)

  • 이병훈;김홍열;김대원
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제51권7호
    • /
    • pp.294-301
    • /
    • 2002
  • A new dynamic scheduling algorithm is proposed for CAN-based real-time system in this paper. The proposed algorithm is extended from an existing EDS(Earliest Deadline Scheduling) approach having a solution to the priority inversion. Using the proposed algorithm, the available bandwidth of network media can be checked dynamically, and consequently arbitration delay causing the miss of deadline can be avoided. Also, non-real time messages can be processed with their bandwidth allocation. Full network utilization and real-time transmission feasibility can be achieved through the algorithm. To evaluate the performance of algorithm, two simulation tests are performed. The first one is transmission data measurement per minute for periodic messages and the second one is feasibility in the system with both periodic messages and non-real time message.

실시간 태스크 그룹과 데드라인 태스크의 동시 지원을 위한 리눅스 스케줄링 가능성 분석 개선 (Improvement of Linux Schedulability Analysis for Simultaneous Support of Real-Time Task Groups and Deadline Task)

  • 임인구;진현욱;이상헌
    • 정보과학회 컴퓨팅의 실제 논문지
    • /
    • 제23권7호
    • /
    • pp.452-457
    • /
    • 2017
  • 리눅스는 범용 운영체제로써 다양한 스케줄러를 지원하며, 서로 다른 스케줄러가 런타임 시에 혼재하는 상황을 허용한다. 또한, 리눅스는 Control Group(cgroup)을 활용하여 데드라인 스케줄러(SCHED_DEADLINE)를 제외한 실시간(SCHED_FIFO, SCHED_RR) 및 비실시간(SCHED_NORMAL) 스케줄러 정책을 따르는 태스크들에 대해서 그룹 단위의 CPU 자원 예약을 지원한다. cgroup은 스케줄링 가능성 분석을 수행하여 예약된 CPU 자원을 최대한 보장하려고 한다. 하지만 현재 리눅스의 실시간 태스크 그룹에 대한 스케줄링 가능성 분석은 데드라인 태스크와 실시간 태스크를 구분하지 못하는 문제에 의해서 두 스케줄러를 사용하는 태스크가 혼재할 때 실시간 태스크 그룹의 자원예약을 거부하는 경우가 발생한다. 본 논문은 리눅스 cgroup의 실시간 태스크 그룹에 대한 스케줄링 가능성 분석에서 발생하는 문제를 분석하고, 이를 해결하는 커널 패치를 제안한다.

CAN기반 실시간 시스템을 위한 확장된 EDS 알고리즘 개발 (Development of an Extended EDS Algorithm for CAN-based Real-Time System)

  • 이병훈;김대원;김홍렬
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2369-2373
    • /
    • 2001
  • Usually the static scheduling algorithms such as DMS (Deadline Monotonic Scheduling) or RMS(Rate Monotonic Scheduling) are used for CAN scheduling due to its ease with implementation. However, due to their inherently low utilization of network media, some dynamic scheduling approaches have been studied to enhance the utilization. In case of dynamic scheduling algorithms, two considerations are needed. The one is a priority inversion due to rough deadline encoding into stricted arbitration fields of CAN. The other is an arbitration delay due to the non-preemptive feature of CAN. In this paper, an extended algorithm is proposed from an existing EDS(Earliest Deadline Scheduling) approach of CAN scheduling algorithm haying a solution to the priority inversion. In the proposed algorithm, the available bandwidth of network media can be checked dynamically by all nodes. Through the algorithm, arbitration delay causing the miss of their deadline can be avoided in advance. Also non real-time messages can be processed with their bandwidth allocation. The proposed algorithm can achieve full network utilization and enhance aperiodic responsiveness, still guaranteeing the transmission of periodic messages.

  • PDF

다중처리기 시스템에서 데드라인과 여유시간을 통합한 실시간 스케줄링 기법 (Integrating Deadline with Laxity for Real-time Scheduling in Multiprocessor Systems)

  • 조성제
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제29권11호
    • /
    • pp.611-621
    • /
    • 2002
  • 실시간 시스템에서 많은 요청을 처리하기 위해 다중처리기 구조가 필수적이 되었다. EDF나 LLA와 같은 기존의 실시간 온라인 스케줄링 알고리즘들은 다중처리기 시스템에서 실시간 태스크들을 스케줄링하는 데 적합하지 않다. EDF의 경우 문맥교환 오버헤드가 낮지만 다중처리기 이상현상을 보이며, LLA의 경우 준최적이지만 문맥교환 오버헤드가 높다. EDZL은 두 알고리즘의 문제점을 일부 해결하였으나 세 개 이상의 처리기에서는 준최적이 아니다. EDA2는 과부하 단계에서 좋은 성능을 보이지만 준최적이 아니다. 본 논문에서는 새로운 두개의 온라인 스케줄링 알고리즘 ED/LL과 ED2/LL을 제안한다. ED/LL은 다중처리기에서 준최적이며, 정상부하 단계에서 낮은 문맥교환 오버헤드와 높은 성공률을 보인다. 그러나, 시스템이 과부하 상태가 되면 ED/LL은 비효율적이다. 이를 해결하기 위해, ED2/LL은 정상 부하 단계에서는 ED/LL 또는 EDZL을 사용하고 과부하 단계에서는 EDA2를 사용한다. 실험을 통해 ED2/LL이 정상부하 단계에서는 물론 과부하 단계에서도 좋은 성능을 보임을 확인할 수 있었다.

분산 실시간 시스템에서 개선된 EDF 정책을 사용한 메시지 스케줄가능성 분석 (A Message Schedulability Analysis using an Improved EDF Scheduling for Distributed Real-Time Systems)

  • 이은미;허신
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제29권9호
    • /
    • pp.520-529
    • /
    • 2002
  • 본 논문은 분산 실시간 시스템에서 실시간 동적 알고리즘으로 메시지를 스케줄링하기 위한 개선된 접근법을 제안한다. EDF(Earliest Deadline First) 스케줄링 정책에서 메시지의 중간 종료시한을 계산하기 위한 방법을 제시하고, 이는 우선순위 할당을 위해 사용하는 슬랙값을 조정하는데 사용된다 수정된 슬랙값으로 메시지의 우선순위값은 보다 정확하게 결정될 수 있으며, 결과적으로 메시지의 스케줄가능성 효율을 증가시킬 수 있다. 개선된 EDF 스케줄링 정책을 적용함으로써, 전송 메시지의 최악의 응답시간을 줄일 수 있었고, 메시지 전송의 실시간적 보장성 문제를 개선하였다. 또한, 개선된 EDF 스케줄링 정책을 기반으로 전송되는 메시지 집합에 대한 스케줄 가능성을 검사하기 위해 간단한 분석 방법을 제공하고 시뮬레이션을 통해 이전의 DM(Deadline Monotonic)과 기존의 EDF을 적용한 예와 비교함으로써, 본 연구 결과의 효율성을 보였다.