• Title/Summary/Keyword: the light rail transit system

Search Result 149, Processing Time 0.044 seconds

Study on the Standard Specification of Linear Induction Motor Type Light Rail Vehicle Electrical Equipment (선형유도모터형식 경전철 전기장치 표준사양 연구)

  • Cho, Hong-Shik;Lee, Ho-Yong;Cho, Bong-Kwan;Hong, Jai-Sung;Ryu, Sang-Whan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1181-1182
    • /
    • 2007
  • Light Rail Transit (LRT) System is an urban transit system which has approximately an intermediate transportation capacity between conventional subway and bus ($5,000{\sim}25,000$ persons per hour and per direction). It is a high-tech system which operational capacity, punctuality and mobility are remarkably improved. There are some types of LRT systems such as monorail, tramway, AGT(Automated Guideway Transit), and so on. The LRT systems have been applied and being operated in about a hundred lines around the world and many projects that apply the LRT systems in Korea are being proceeded and scheduled. For the efficient management, economical construction, and safe operation of various LRT systems, the establishment of national standard is necessary such as vehicle standardized specification, vehicle performance test standard, vehicle safety standard, construction guide, operation regulation, etc. of LRT systems. This paper presents the standard specification of electrical equipment of linear induction motor type light rail vehicle, that is LIM AGT(AGT system propelled with linear induction motor) vehicle. The LIM AGT system has been applied in Japan subway and ART(Advanced Rapid Transit) system of Canada and Yongin LRT is currently under construction.

  • PDF

The Funding system for Shanghai Metro And The Practical Experiences of Utilizing Foreign Funds

  • Zhou Yao Dong
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.09a
    • /
    • pp.185-191
    • /
    • 1998
  • Metro, as a kind of city rail transit, is a modem city passenger transit system with mass transportation and independent special rails. It has become a backbone of the traffic in the metropolis and an important modern symbol of a city. A modem traffic system is indispensable for Shanghai to be an international metropolis of finance, trade and economy. At present, Shanghai metro line No. 1 and its extension have been put into operation, metro line NO. 2 will be put into trial operation by the end of 1999, the Pearl Line, an elevated rail transit system is under construction and other lines will be constructed later according to the plan. But the funding of the city rail transit construction (both metro and light rail) is a big difficult problem to the infrastructure construction of the metropolises either at home or abroad, which is also a problem to restrict the development of the city rail transit of Shanghai. We have learned from the internal and external experiences of the rail transit construction that it is an important means to deal with the funds of the city rail transit construction to actively utilize foreign funds. It makes up the shortage of the internal funds on the one hand, the external advanced science and technology and the management experiences can be introduced on the other hand. In order to discuss and study conveniently with you together the new problems appearing in the metro construction and to open up a new train of thought, this article will give out a certain analysis and description to the funding method in the metro construction of Shanghai and the characteristics of utilizing foreign funds in the rail transit construction as well as the problems which we are faced with.

  • PDF

The Strategy of Wireless Power Transfer for Light Rail Transit By Core Technologies Analysis Based on Text Mining

  • Meng, Xiang-Yu;Han, Young-Jae;Eum, Soo-Min;Cho, Sung-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.11
    • /
    • pp.193-201
    • /
    • 2018
  • In this paper, we extracted relevant patent data and conducted statistical analysis to understand the technical development trend related to Wireless Power Transfer (WPT) for Light Rail Transit (LRT). Recently, with the development of WPT technologies, the Light Rail Transit (LRT) industry is concentrating on applying WPT to the power supply system of trains because of their advantages compared wired counterpart, such as low maintenance cost and high stability. This technology is divided into three areas: wireless feeding and collecting technology, high-frequency power converter technology and orbital and infrastructure technology. From each specific area, key words in patent document were extracted by TF-IDF method and analyzed by social network. In the keyword network, core word of each specific technology were extracted according to their degree centrality. Then, the multi-word phrases were also built to represent the concept of core technologies. Finally, based on the analysis results, the development strategies for each specifics technical area of WPT in LRT filed will be provided.

A study on System Requirement Structure of LRT's System on the advanced Systems Engineering (시스템엔지니어링 기법 적용에 따른 경량전철시스템 요구사항체계 구축에 관한 연구)

  • Heo, Jae-Hun;Bae, Joon-Ho;Choi, Won-Chan;Bae, Sung-Hoon;Joo, Ji-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1523-1529
    • /
    • 2011
  • Light Rail Transit is system that offer target Performance and function because various sub-system such as vehicles, power supply, signaling, communication, mechanical, track, civil is consisted as large complex system. Light Rail Transit and the complex system of safety, reliability to be a behavior, and target performance and function properly to system's configuration, design, manufacture, installation and test verification, through operations system requirements to accurately describe what It is more important. With this study, light rail system KSX ISO/IEC 15288 system life cycle process by applying engineering techniques utilizing light rail system in the early stages of construction from the concept, design, production, operation, maintenance and end-use to the disposal stage throughout the entire life cycle, from the beginning of construction until the end of construction of the stakeholder to define requirements, analyze the introduction of the system developers and system requirement of those who wish to be described accurately by selecting the best system and system requirement in order to achieve their purpose.

  • PDF

A Study on the Systems Engineering based Verification of a Systems Engineering Application Model for a LRT Project (경량전철사업 시스템엔지니어링 전산모델 검증에 관한 연구)

  • Han, Seok-Youn;Kim, Joo-Uk;Choi, Myung-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.425-433
    • /
    • 2016
  • The construction of a light rail transit (LRT) system is a large and complex infrastructure project involving hundreds of billions of won in construction costs for a single route, and it is very important to carry out such a project from a life-cycle perspective because of its long-term operation. Systems engineering is a means and methodology to successfully implement customers' needs, and it is useful in large projects such as light rail transit. An application model called Systems Engineering for Light Rail Transit (SELRT) was developed to support systems engineering activities in light rail transit projects. In order to utilize SELRT, it is necessary to ensure that system requirements are met. As such, in this paper, we present a verification procedure and architecture based on a systems engineering-based methodology, thereby identifying the system requirements and deriving the verification requirements to confirm the SELRT model for the proposed method. The results show that the traceability of the system requirements and verification requirements, the verification method for each requirement, and the demonstration results for computerized tools are mutually connected, and that the initial requirements are clearly implemented in the SELRT. The proposed method is valid for verifying the SELRT, which can also be utilized in a LRT project.

A Study on the Railway Safety Authorization for Assuring Safety of Light Rail Transit System (경전철시스템의 안전확보를 위한 안전승인(확인)제도 연구)

  • Lee, Ji-Woong;Shin, Jeong-Beom;Lee, Byung-Suk
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2539-2547
    • /
    • 2011
  • This paper will introduce the safety authorization system for light rail transit(LRT) through investigating safety certification & safety authorization in foreign country and aviation field in Korea. The safety authorization system proposed by the government these day was also investigated. Korea Transportation Safety Authority(KOTSA) have conducted safety validation process on Busan-Gimhae LRT before its revenue service during three months since Jan. of 2011. We describe the overview of these validation activities, results and safety certification issued. Learning from this process, we propose the standardized safety validation process including checklists which can be applied to common unmanned light rail system. This study will be a basis of railway safety authorization for LRT and will be continually improve its application ability by the future study.

  • PDF

Daegu Urban Railroad Line No.3 Vehicle System Selecting (대구도시철도 3호선 차량시스템 선정)

  • Jeon, Bae-Un;Yoo, Je-Nam;Lee, Ung-Hee
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1105-1114
    • /
    • 2007
  • Recently the urban railroad which is under plan and construction in domestic is under consideration Light Rail Transit mostly with the alternative against excess of working expenses of Midium Rail Transit(subway), inefficient transportation problem etc. It come to a conclusion that the application of the light rail transit is proper from reserve feasibility study and approval process of Master plan in Daegu urban railroad Line No.3 Based on hereupon, carried out the detail investigation for optimum system selection which suitable for Daegu urban circumstance in process of master plan can satisfy the working expenses decided in national expenditure support project.

  • PDF

Development of the Braking Equipments for a Rubber-Tired AGT Light Rail Vehicle (고무차륜 AGT 경량전철용 제동장치의 개발)

  • 박성혁;김연수
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1585-1588
    • /
    • 2003
  • Based on the design requirements for the rubber-tired AGT light rail vehicle. the braking system was designed. Its major components are a brake operating unit, a pneumatic-hydraulic transfer, screw compressor, oil separator. air dryer, hydraulic caliper. After the components of braking system were manufactured. some factory tests were executed to evaluate their performances. The Results of these tests can guarantee a performance. safety of the braking system developed.

  • PDF

A Reliability Allocation for Vehicle System of Light Rail Transit (경량전철 차량시스템의 신뢰도 배분)

  • Jeong, Rak-Gyo;Kim, Yeong-Seok
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.51 no.7
    • /
    • pp.357-363
    • /
    • 2002
  • The target reliability values are defined for the train, signaling, rail track and electric power supply system of the LRT under development. The allocation of the reliability value is based on the failure rate and the failure type in the Korean subways. The reliability allocation in the train system is the made ore detail than others. The purpose of the allocation is to verify the reliability value of the results from each of the development stage, which could be the designing, manufacturing and purchasing work. The reliability of braking system, traction system, door system and other control system could be verified by establishing reliability models of these system. It could also enable us to estimate and analyse the reliability value and redo the work if necessary to achieve the shooting reliability value. A guide to the LRT reliability criteria is to be prepared after running test on the test track.