TBCC Engine Performance Design Technique of Reusable Launch Vehicle (재사용 우주 발사체의 TBCC 엔진 성능 설계 기법)

  • Kim, Sung-Jin;Sung, Hong-Gye
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.11a
    • /
    • pp.167-170
    • /
    • 2008
  • A TBCC(Turbine Based Combined Cycle) engine performance design method for reusable launch vehicles flying both in subsonic and supersonic regime was proposed. The TBCC consists of turbo jet engines and ramjet engines, operating individually or together according to operation schedule. The performance scheme of turbojet and ramjet was validated and the combined engine performance of the TBCC at a typical flight condition was analyzed.

  • PDF

A Study on the system Applied Air-Vent to Complex Lay Poly-Urethane Waterproofing Material and Air-Permeability Buffer Sheet of Disconnection Type (Web기반을 활용한 자재 조달 시스템 개선방안)

  • Lee, Im-Bae;Kim, Hong-Hyun;Yoon, Su-Won;Min, Kyung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.141-145
    • /
    • 2008
  • Because of world financial crisis, The Korea domestic construction industry has been damaged hugely on material supplying work. A current domestic material supply system can't react properly on a great rise of foreign exchange rate and raw material price, so the system has a problem which is not properly supplying material. To solve this problem, a more innovative material supply work system is seriously needed than ever. So this study wants to improve material supply system for supplying material right time, right place through applying a web-based system. Applying this, overall process of material-supply-work can be done on a web-based system for immediately understanding change of ordering and warehousing by material-supply-schedule to a domestic construction field.

  • PDF

Development of SOC DATS C&M (Control and Monitoring) S/W

  • Koo, In-Hoi;Kim, Su-Jin;Ahn, Sang-Il
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.602-605
    • /
    • 2007
  • COMS SOC is supposed to operate IDACS as a backup of MSC. For the backup operation, there is a route between SOC and MSC for exchanging current version such as radiometric calibration for IMPS, dissemination schedule, encryption key and conversion table for LHGS. DATS C&M S/W is basically designed to control and monitor DATS equipment. However, its capability is extended to monitor the working status of IMPS, LHGS and even MSC IDACS. In addition, DATS C&M SIW can display discrepancy between MSC and SOC when applied version is different each other. This paper presents detailed description on the development of DATS C&M S/W.

  • PDF

Combine Harvest Scheduling Program for Rough Rice using Max-coverage Algorithm

  • Lee, Hyo-Jai;Kim, Oui-Woung;Kim, Hoon;Han, Jae-Woong
    • Journal of Biosystems Engineering
    • /
    • v.38 no.1
    • /
    • pp.18-24
    • /
    • 2013
  • Purpose: This study was conducted to develop an optimal combine scheduling program using Max-Coverage algorithm which derives the maximum efficiency for a specific location in harvest seasons. Methods: The combine scheduling program was operated with information about combine specification and farmland. Four operating types (Max-Coverage algorithm type, Boustrophedon path type, max quality value type, and max area type) were selected to compare quality and working capacity. Result: The working time of Max-Coverage algorithm type was shorter than others, and the total quality value of Max-Coverage algorithm and max quality value type were higher than others. Conclusion: The developed combine scheduling program using Max-Coverage algorithm will provide optimal operation and maximum quality in a limited area and time.

Study on Standard Operating Conditions for Office Buildings (사무소 건물의 표준운전상태에 관한 연구)

  • Park Sang Dong;Oh Chang Sup;Won Joung Son;Tae Choon Seup
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.13 no.1
    • /
    • pp.48-63
    • /
    • 1984
  • Standard Building Operation Conditions(SBOC) is to describe typical conditions under which a building would operate during the coulee of a day In order to develop SBOC profiles for office building, we surveyed the operating conditions of randomly selected 20 existing office buildings in Seoul by means of enquetes, and made SBOC profiles. SBOC profiles consist of human occupancy profile, light ins usage profile, system schedule and domestic hot water profile etc. SBOC profiles will be used as input data of DOE-2 computer program to estimate DER(Design Energy Requirements) and to develop EBL (Energy Budget Level), SBOC profiles are not meant to be exact description of how a building will actually be used by its respective users. Rather they are intended to be reasonable typical project ions of how buildings might be used.

  • PDF

Installation Scheduling for the Development of Southwest Coast 2.5GW Offshore Wind Farm (서남해안 2.5GW 해상풍력단지 조성을 위한 설치 일정계획)

  • Ko, Hyun-Jeung
    • Journal of Korea Port Economic Association
    • /
    • v.33 no.2
    • /
    • pp.83-96
    • /
    • 2017
  • As a way to address global warming, among the renewable energy sources, there have been heavy investments worldwide for the development of offshore wind farms. However, such development has a drawback: investment costs are higher than those for onshore wind farms due to required operations such as offshore transportation and installation. In particular, delays in installation due to adverse maritime weather conditions are factors that affect the economics of offshore wind farms' operation. Therefore, in this study, we analyze the optimal schedule of the construction of an offshore wind farm from a macro perspective by considering the weather conditions in Korea. For this purpose, we develop a mathematical model and apply it to a 2.5 GW offshore wind farm project on the southwestern coast of the country. We use data from the Korea Meteorological Agency for maritime weather conditions and attempt to reflect the actual input data based on precedent cases overseas. The results show that it takes 6 months to install 35 offshore wind turbines. More specifically, it is pointed out that it is possible to minimize costs by not working in winter.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

Development of Open Water Management Program(OWMP) for Water Management Automation System with Open Architecture (물관리자동화시스템을 위한 개방형 운영 프로그램 개발)

  • Kim, Sun-Joo;Kim, Pill-Sik;Yoon, Chan-Young
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.84-88
    • /
    • 2001
  • This study presents an application of object-oriented methodology for Open Water Management Program(OWMP). Accordingly, OWMP provides a high degree of reliability which allows modification of parameters by change of region or time to be possible OWMP consists of Data Base Management System(DBMS) and Model System. DBMS make it possible to analyze data related with planning water schedule and establishing database. Model System calculates reservoir inflow, reservoir effluent and basin water demand. A operator decides the reservoir operation with results of Model System and DBMS. OWMP could be adapted to the planning and decision for saving water.

  • PDF

Development of Water Management System for Optimal Operation and Control in Wide-area Waterworks (광역상수도의 최적운영 및 제어를 위한 수운영시스템 개발)

  • 남의석;우천희;김학배
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.7
    • /
    • pp.489-497
    • /
    • 2003
  • A water management system is developed to reduce the unit cost of production in wide-area waterworks. Improving productivity in waterworks is to save power rate. We suggest a method to schedule the supply of water according to the time-varying power rate and pump control scheme. Water pipeline analysis package (SynerGEE Water) is utilized to obtain optimal pump control solution adaptation to water demand. Our evaluation results show that developed scheme is more efficient than the conventional.

Study on Risk-based Satellite Product Assurance and Tailoring (리스크 기반의 위성 제품보증 및 테일러링 분석)

  • Song, Sua;Chang, Young-Keun
    • Journal of Aerospace System Engineering
    • /
    • v.12 no.5
    • /
    • pp.76-88
    • /
    • 2018
  • Space agencies such as NASA, ESA, and the US military provide guidelines and standards for PA(product assurance) requirements and plans. In recent years, major satellite manufacturers around the world have been mitigating PA requirements and processes by tailoring. PA tailoring has been implemented to improve the cost and schedule efficiency. PA tailoring can be accomplished based on various factors such as mission, classification of mission risk, complexity, development cost, life cycle, etc. In this study, PA tasks according to the mission risk classification proposed by NASA are investigated, and the tailoring method is suggested for the optimization of the development cost and schedule. In particular, the classification of mission risk for the satellites under development or operation in Korea is performed, and PA characteristics in accordance with mission risk are analyzed.