• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.023 seconds

A basic study 3D model advancement method for nuclear power plant (원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

A Mathematical Model for Optimal Communication Scheduling between Multiple Satellites and Multiple Ground Stations (다수의 인공위성-지상국 간 통신 스케줄 최적화 모형)

  • Jeong, Eugine;Kim, Heungseob
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.1
    • /
    • pp.39-49
    • /
    • 2018
  • In the satellite operation phase, a ground station should continuously monitor the status of the satellite and sends out a tasking order, and a satellite should transmit data acquired in the space to the Earth. Therefore, the communication between the satellites and the ground stations is essential. However, a satellite and a ground station located in a specific region on Earth can be connected for a limited time because the satellite is continuously orbiting the Earth, and the communication between satellites and ground stations is only possible on a one-to-one basis. That is, one satellite can not communicate with plural ground stations, and one ground station can communicate with plural satellites concurrently. For such reasons, the efficiency of the communication schedule directly affects the utilization of the satellites. Thus, in this research, considering aforementioned unique situations of spacial communication, the mixed integer programming (MIP) model for the optimal communication planning between multiple satellites and multiple ground stations (MS-MG) is proposed. Furthermore, some numerical experiments are performed to verify and validate the mathematical model. The practical example for them is constructed based on the information of existing satellites and ground stations. The communicable time slots between them were obtained by STK (System Tool Kit), which is a well known professional software for space flight simulation. In the MIP model for the MS-MG problems, the objective function is also considered the minimization of communication cost, and ILOG CPLEX software searches the optimal schedule. Furthermore, it is confirmed that this study can be applied to the location selection of the ground stations.

Study on KSLV-II Program's Budget Execution Management (한국형발사체개발사업 예산 집행 관리 방안 연구)

  • Lee, Hyo Young;Cho, Dong Hyun;Yoo, Il Sang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.1
    • /
    • pp.73-78
    • /
    • 2017
  • Space development program is a large and complex system consisting of a multi-disciplinary high-end technologies and it is important to implement a program management system connected with systems engineering as well as to develop critical technologies. Major organizations in space fields carry out effective budget execution management and operation according to the strategy and objective of space development using information systems. Korea Space Launch Vehicle II(KSLV-II) has adopted a cost management plan using a system engineering to complete the program within the assigned schedule and budget. This paper introduces the budget execution management system applied to KSLV-II budget management and the budget execution dashboard system for supporting program decision making.

Development of the Integrated System for Power System Operational Planning an (전력수급계획 및 운용해석 종합시스템 개발)

  • Park, Si-Woo;Yoon, Yong-Beum;Nam, Jae-Hyun;Ahn, Yang-Keun
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1042-1045
    • /
    • 1998
  • The main purpose of HITES(Highly Integrate Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The integrated energy system can be utilized to supply a stable electric power and operate KEPCO power system facilities economically. This system will be put into operation in 1999. This paper describes the main feature of the HITES, system main functions, numerical methods adopted this system, and network configuration.

  • PDF

A Dynamic Inventory Scheduling Method in Multi-Echelon Distribution Systems (다단계분배시스템에서의 동적 발주계획 수립방안)

  • Yoo, Yeong-Joon;Rhee, Jong-Tae
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.13-24
    • /
    • 1998
  • A distribution system is composed of multiple levels from a producer to customers, and it's objective is to supply customers with goods timely with a prescribed level of quality at a minimum cost. For the installation and operation of multi-echelon distribution system, DRP(Distribution Resource Planning) is widely used. However, because of the characteristic difference of material flow dynamic of each distribution center, it is almost impossible to get the optimal distribution scheduling. In this paper, an improved DRP method to schedule multi-echelon distribution network is proposed so that the lot-size and order point is dynamically obtained to meet the change of demand rate and timing. The experiment is done with various demand pattern, forecast errors of demand and lead times of central distribution center. The proposed method is compared with traditional statistical approach.

  • PDF

An Implementation of Hybrid-Simulation in Manufacturing Environments using Object-Oriented Methodology (객체지향 기법을 이용한 공장운용 환경 하에서의 혼합시뮬레이션 구현)

  • 김성식
    • Journal of the Korea Society for Simulation
    • /
    • v.7 no.1
    • /
    • pp.15-26
    • /
    • 1998
  • In building a shell-based FMS, which is known as one of the top-down approaches in the field of factory automation, we may take a hybrid simulation into consideration. The modeling of a hybrid simulation consists of real physical entities, virtual simulation, and central clock algorithm, etc. to carry out the whole system operation. In this paper, we sow a way to construct a hybrid simulation software system in manufacturing environments. We bring in the object-oriented methodology in system design and it can contribute in dealing with a wide variety of production types and configurations. Some classes such as project, product, process, order, schedule, stage are defined. These are used and tested by implementing a specific LSI circuit assembly line process.

  • PDF

A Comparative Study of the Flexible Moving Block System and the Fixed Block System in Urban Railway (도시철도에 있어 이동폐색방식과 고정폐색방식의 상호비교 연구)

  • Jeong, Gwangseop;Park, Jeongsoo;Won, Jaimu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.723-730
    • /
    • 2006
  • Recently, The flexible moving block system in train operation has been introduced to the worldwide rail transportation markets. This paper is a comparative study of the conventional fixed block systems effects and the flexible moving block system on train operating time saving. Based on the literature review, the new algorithm is developed. It is to calculate the optimum headway time of the train. The proposed algorithm can overcome some of the existing algorithm problems, such as the limits of the data and unaware of the rail characteristic. The total travel time saving effect has been analyzed by applying the skip stop scheduling system to the each block system. The results of this study indicated that the total travel time is approximately 40% decreased and the schedule velocity is approximately 24% improved when the moving block system is applied. The results of this study could be used as a theoretical basis for the selection of rail signal system in Seoul's subway number 2 line.

A study on Out Door Play of Day Care Centers in Jeju (어린이집 실외놀이 운영실태 및 교사의 인식 - 제주지역을 중심으로-)

  • Kang, Seung-Hee;Kim, Chang-Suk;Hwang, Soon-Young
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.20 no.2
    • /
    • pp.309-322
    • /
    • 2008
  • The purpose of this study is to investigate actual environment and operation of outdoor play at day care centers in Jeju area and differences in recognition of outdoor play among teachers and provide basic data to develop an outdoor play program for infants. For this purpose, data were collected from 207 teachers form about 100 day care centers in Jeju area. The results of this study can be summarized as follows: first, there were statistically significant differences in the actual environment of outdoor play mostly by the types of establishment and national, public, or corporate centers had better environment than private ones did. Second, the majority of day care centers in Jeju area were including and operating outdoor play in a daily schedule. Third, there were no significant differences in recognition of outdoor play among teachers.

Development of Open Water Management Program(OWMP) for Water Management Automation System with Open Architecture (물관리자동화시스템을 위한 개방형 운영 프로그램 개발)

  • 김선주;김필식;윤찬영;박재홍
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.43 no.5
    • /
    • pp.83-92
    • /
    • 2001
  • As a result of the recent water resources crisis, development of water management automation system becomes important. This system should be developed with open architecture in order to flexibly meet the spacial and time change of irrigation water demand. Thereby, water management automation system requires open architecture and suitable software program. This study presents an application of object-oriented methodology for Open Water Management Program(OWMP). Accordingly, OWMP provides a high degree of reliability which allows modification of parameters by change of region or time to be possible. OWMP consists of Data Base Management System(DBMS) and Model System. DBMS makes it possible to analyze data related with planning water schedule and establishing database. Model System calculates reservoir inflow, reservoir effluent and basin water demand. An operator decides the reservoir operation with results of Model System and DBMS. OWMP could be adapted to the planning and decision for saving water.

  • PDF

A New Algorithm for Unit Commitment (기동정지계획의 새로운 해법)

  • Lee, Sang-Do;Baek, Young-Sik
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.704-706
    • /
    • 1996
  • This paper presents a new algorithm of unit commitment for optimal operation in power system. The proposed method developed algorithm that determined generators considering load variations at each stages. It has established forecast unit commitment over time horizon at first and next calculated quality cost of generators and then committed generator that has minimum quality cost at unit commitment schedule over time horizon. It is used that Objet-Oriented Programming for effective realization, and simple handling of complex program. The proposed method has applied at example system and the results has shown superior economics and computational requirement than the conventional method.

  • PDF