• Title/Summary/Keyword: the Operation Schedule

Search Result 414, Processing Time 0.025 seconds

A New ILP Scheduling Algorithm that Consider Delay Constraint (지연 제약 조건을 고려한 새로운 ILP 스케줄링 알고리즘)

  • Kim, Ki-Bog;Lin, Chi-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.1213-1216
    • /
    • 2005
  • In this paper, we suggested the integer linear programming (ILP) models that went through constraint scheduling to simple cycle operation during the delay time. The delayed scheduling can determine a schedule with a near-optimal number of control steps for given fixed hardware constraints. In this paper, the resource-constrained problem is addressed, for the DFG optimization for multiprocessor design problem, formulating ILP solution available to provide optimal solution. The results show that the scheduling method is able to find good quality schedules in reasonable time.

  • PDF

A Model for Integration of Process Planning and Scheduling with Outsourcing in Manufacturing Supply Chain (생산공급사슬에서의 아웃소싱을 고려한 공정계획 및 일정계획의 통합을 위한 모델)

  • Jeong, Chan-Seok;Lee, Young-Hae;Moon, Chi-Ung
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.512-520
    • /
    • 2000
  • An integrated process planning and scheduling model considering outsourcing in manufacturing supply chain is proposed in this paper. The process planning and scheduling considering outsourcing are actually interrelated and should be solved simultaneously. The proposed model considers the alternative process plans for job types, precedence constraints of job operations, due date of production, transportation time and production information for outsourcing. The integrated states include:(1) Operations sequencing, (2) Machine selection, (3) Scheduling with outsourcing under the due date. To solve the model, a heuristic approach based on genetic algorithm(GA) is developed. The proposed approach minimizes the makespan considering outsourcing and shows the best operation-sequences and schedule of all jobs.

  • PDF

Water - Commander of Vacuum (물, 진공의 지배자)

  • In, Sang Ryul
    • Vacuum Magazine
    • /
    • v.1 no.1
    • /
    • pp.6-10
    • /
    • 2014
  • It is a common sense that water is an old offender crashing our dream of achieving a good vacuum in an early time. Various techniques for accelerating the removal of water have been developed and utilized. However, we generally are not skilled in treating the water pumping in a physically proper manner. We are rather used to handle the situation of the water pumping just like considering a conventional air pumping. Under such an erroneous approach, we cannot help making an overestimation on the pumping capability of our vacuum system, and it leads to a big mismatch between the real operation timing and the planned process schedule. In this article, some main points concerning with the subject that a vacuum pumping is really a water pumping will be discussed.

Development of an Integrated Multizone Model for Indoor Air Environment Prediction (실내공기환경 예측을 위한 통합 다구획 모델의 개발)

  • Cho, Seok-Ho
    • Journal of Environmental Science International
    • /
    • v.17 no.9
    • /
    • pp.993-1003
    • /
    • 2008
  • Interior space in most buildings is divided into several zones. The most important factors relating to the indoor air environment are temperature, airflow, humidity, and contaminant concentration. An integrated multizone model to predict these environmental factors simultaneously was developed. Also, a computer program for this model was written by the language of VISUAL BASIC. The proposed model was applied to a apartment with five rooms that had been tested by Chung. Comparison of predicted results by this study with measured results by Chung showed that their variations were within 14% for airflow rates, 1% for temperatures, 12% for humidities, and 5% for concentrations. It was seen that the opening operation schedule of building has a significant effect on the air moisture md contaminant removal. Thus, this model may be available for predicting the indoor air environment and may be contributed to design the ventilation plan for controling of indoor air quality.

The Effect of PMO Service and Capability on Project Performance (PMO 서비스와 PMO 역량이 프로젝트 성과에 미치는 영향)

  • Lee, Seong-Mong;Kim, Eun-Hong;Moon, Song-Chul
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.1
    • /
    • pp.107-132
    • /
    • 2013
  • Project management is critical for the success of the large and complicated IT project. Accordingly, to improve the efficiency of the project management, operation of separate Project Management Office (PMO) organization is getting important. Despite the appreciation of PMO as necessary for project success, the result has not always been positive. In this respect, we intended to formalize the PMO success model by incorporating necessary factors related to PMO services and capabilities, and their relationship. Empirical testing results verified critical antecedents comprising PMO services, which included schedule, quality, budget and others. Furthermore, moderating impacts of PMO capabilities are quantitatively assessed. The research findings offer practical insights for successful management of PMO.

A Study on Effective Management for Measuring Instrument (측정기의 효율적 운영에 관한 실증적 연구)

  • Yoo, Hyun-Jong;Jung, Soo-Il
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.1
    • /
    • pp.183-190
    • /
    • 2008
  • Measurement is a essential part in all kinds of industry, especially in manufacturing. But until now, measurement hasn't been located to the core of manufacturing in domestic. This study suggests improvement guide line for the multilateral problems of measuring instrument operation based on the investigation of small and medium-sized enterprises. To use measuring instrument correctly, man who treat it must be accustomed with the structure, the performance, the method. The measuring instrument must be corrected periodically. The correcting-schedule is established with environments with considering accuracy, stability, purpose, condition, and frequency.

Implementation of Simulated Annealing for Distribution System Loss Minimum Reconfiguration (배전 계토의 손실 최소 재구성을 위한 시뮬레이티드 어닐링의 구현)

  • Jeon, Young-Jae;Choi, Seung-Kyo;Kim, Jae-Chul
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.4
    • /
    • pp.371-378
    • /
    • 1999
  • This paper presents an efficient algorithm for loss reduction of distribution system by automatic sectionalizing switch operation in large scale distribution systems of radial type. Simulated Annealing algorithm among optimization techniques can avoid escape from local minima by accepting improvements in cost, but the use of this algorithm is also responsible for an excessive computation time requirement. To overcome this major limitation of Simulated Annealing algorithm, we may use advanced Simulated Annealing algorithm. All constaints are divided into two constraint group by using perturbation mechanism and penalty factor, so all trail solutions are feasible. The polynomial-time cooling schedule is used which is based on the statistics calculation during the search. This approaches results in saving CPU time. Numerical examples demonstrate the validity and effectiveness of the proposed methodology.

  • PDF

Development of a Product Arrangement Scheduling System for Plant Industry (플랜트 생산공장의 제품별 작업장사용계획시스템 개발)

  • Koh, Shie-Gheun;Chae, Young-Myung
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.266-272
    • /
    • 2000
  • This paper deals with a computer-aided product arrangement system in the plant industry. The arrangement schedule may be performed manually. But this is inadaptable to change and difficult to store the results, which eventually requires time consuming and ineffective works. Using computerbased scheduling system, problems mentioned above can be resolved. In the system, the products can be arranged in a workarea with an automatic algorithm as well as manual operation using mouse dragging. In the automatic scheduling algorithm, the position of a product is determined by considering the existing products and material handling costs. Then the scheduled results are stored in DB and can be manipulated at any time.

  • PDF

Automatic Alignment System for Group Schedule of Event-based Real-time Response Web Processing using Node.js

  • Kim, Hee-Wan
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.11 no.1
    • /
    • pp.26-33
    • /
    • 2018
  • A web application running on the Internet is causing many difficulties for a program developer, and it requires to process multiple sessions at the same time due to the occurrence of excessive traffic. Web applications should be able to process concurrent requests efficiently and in real time. Node.js is a single-threaded server-side JavaScript environment implemented in C and C ++ as one of the latest frameworks to implement event models across the entire stack. Nodes implement JavaScript quickly and robust to achieve the best performance using a JavaScript V8 engine developed by Google. In this paper, it will be explained the operation principle of Node.js, which is a lightweight real-time web server that can be implemented in JavaScript for real-time responsive web applications. In addition, this application was practically implemented through automatic alignment system for group scheduling to demonstrate event-based real-time response web processing.

Risk Monitor Development for On-Line Maintenance (가동중 정비를 위한 Risk Monitor 개발)

  • 김길유;한상훈;김태운
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.21-26
    • /
    • 1997
  • Korea Atomic Energy Research Institute (KAERI) developed a risk monitor called Risk Monster which supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Risk Monster can update the plant risk continuously according to the change of system/component configuration since Risk Monster reevaluates the plant risk based on the Probabilistic Safety Assessment (PSA) results. A brief description of Risk Monster is provided. The PSA model of UCN 3, 4 nuclear power plant was converted by KAERI to Risk Monster model. Using this Risk Monster model, a feasibility study of the on-line maintenance of an Essential Service Water (ESW) pump was performed. On-line maintenance of one ESW pump has been shown to be acceptably safe, and has economic benefits. In addition, it is not a violation of technical specification to continue plant operation with an out-of-service ESW pump.

  • PDF