• Title/Summary/Keyword: the 2 million housing construction project

Search Result 11, Processing Time 0.022 seconds

A Study on Mutual Relationship between Korean Income Distribution during 1980s-1990s and Huge-scale Housing Supply Policy (한국의 80~90년대 소득분배와 대규모 주택공급정책의 상호관계에 관한 연구)

  • Lim, Jae-Bin
    • Land and Housing Review
    • /
    • v.11 no.3
    • /
    • pp.11-19
    • /
    • 2020
  • This study aims to examine the relationship between the improvement of the income distribution index from the late 1980s to the 1990s and large-scale housing supply projects such as the 2 million housing construction project. Looking at Korea's economic development in terms of income growth and distribution, GDP has continuously increased since the establishment of the government, especially in the late 1980s. The Gini Index, a representative income inequality index, rapidly deteriorated in the early 1970s, and gradually improved from the late 1980s. The 2 million housing construction project, announced in 1988, supplied a third of the existing nationwide housing stock of 6.5 million units in three years. The project cost was 65 trillion won, equivalent to 50% of Korea's GDP at the time. This study questioned whether the ratio of the number of employed workers in the construction industry was a variable directly affecting the Gini Index. To verify this, the causal relationship between the proportion of employed workers in the construction and manufacturing industries and the Gini Index from 1979 to 2008 was statistically analyzed. For this, the ARIMA model was established for each variable, and the correlation of their residuals was verified. The 2 million housing construction project had the effect of improving income inequality in terms of rising wages for production workers and creating jobs for the low-educated and low-income class. During the project period, the number of middle-income earners increased sharply, and the income gap between the high-income and low-income earners greatly decreased. The expansion of the construction volume can be used as a powerful and direct policy tool for improving income distribution. However, the effect may be limited. When the proportion of workers exceeds the threshold, the effect is weakened.

The Analysis on the Value of Yongsan National Park and its Economic Effect

  • Chang, In-Seok;Cho, Young-Tae;Lee, Mi-Hong;Park, Shin-Won
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.491-501
    • /
    • 2011
  • This study estimated economic value and benefits of Yongsan National Park, which will be constructed by financial investment of the government and objectively estimated the real value of it by understanding the value of the park from a user's view of the park. For this, the value of Yongsan National Park is divided into using value such as carbon reduction and the function of relieving urban heat island as an environmental material and non-using value based on willingness to pay of the public according to the construction of the park. As a result of the analysis, it was found out that the using value of Yongsan National Park would reach 130 million won up to maximum level of 450 million won per year, and the non-using value was analyzed to be worthy of 2,344 won per capita every month. Besides, economic ripple effect that can be expected in the process of the park construction project was analyzed to be a national policy that creates effect on production inducement of 2.6 trillion won and value added of 809.6 billion won and new jobs for 25,620 persons. Considering the value of Yongsan National Park and the effect of the project based on the result of this study, it was found that it could sufficiently secure the validity of implementing the project compared to the financial investment by the government. Therefore, it must be emphasized that diffusion strategy is necessary for national understanding and for a nation to make it understood its appropriateness widely in respect to the construction of Yongsan National Park for the successful construction of Yongsan National Park and to raise its using value in the future.

A Feasibility and Survey Study on the Hanok housing complex project within Seoul Metropolitan Area (수요자 설문조사 및 사업성분석을 통한 수도권 신도시 내 한옥단지 조성사업 타당성 검토)

  • Kim, Yong-Soo
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.3
    • /
    • pp.101-108
    • /
    • 2012
  • The purpose of this study was to set and analyze the feasibility and survey of the Hanok(The traditional Korean style house) housing complex project within Seoul metropolitan area. The results of this study were as follows. First of all, a survey was carried out to find out the optimum Hanok style. The survey showed that many people chose a frond and back yard garden as a merit of Hanok and pointed out the weak crime prevention as a weakness of Hanok. The optimum size for a Hanok was from $264m^2$ to $330m^2$ and living space was from $100m^2$ to $132m^2$. And people considered about 120% of what the apartment sells for as the reasonable price of a Hanok. Based on the survey, this study planned a Hanok housing complex on a lot that has competitive price and analysed the feasibility of the housing plan. The result was that Hanok's construction cost per $3.3m^2$ to be a marketable product has to be below about 6 million Won. As a result, the construction cost-saving through the advanced technology and planning to meet the changing customers' needs are needed to vitalize Hanok's supply.

FUTURE STRATEGY FOR KOREAN FIRMS INVOLVED IN OVERSEAS MARKETS

  • Rak-Keun Jeon;Jin-Woo Park;Jun-Youl Choi;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.389-396
    • /
    • 2005
  • Despite very good reputation that Korean construction industrial firms had enjoyed until early 1990's in overseas markets, their participation abroad drastically declined after the delivery of two(2) million unit-housing project in the early 1990's and the foreign currency crisis that took place in the late 1990's. The revival of booming construction industry in domestic market is far beyond the expectation due to the long recession of the construction economy and government's severe restriction against real estate development. Under such crucial circumstances, the construction industrial firms' strategy to survive is the more active business promotion in overseas markets. However, the Korean construction industrial firms have to abandon the labor intensive strategy, through that they have enjoyed until the early 1990's, and turn to management oriented strategy which may be a new prosperous horizon and a new challenge as well, because the labor cost of newly developing countries is much more competitive. The aim of this study is to suggest how to cope with current market situations through a chronological survey based on the cost data prevailed during four decades from the 1960's until the 1990's in overseas markets.

  • PDF

Automated Data Analysis of Floor Plans for the Remodeling of Apartment Housing

  • Seo, Wonseok;Kim, Seongah;Park, Junseok;Kim, Jinyoung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1059-1066
    • /
    • 2022
  • In 2020, it was estimated that more than 2.4 million households in South Korea are over 30 years old. That is, more than 40% of all houses in Korea are old and that they require proper rehabilitation. The two options to improve poor living conditions are reconstruction and remodeling. Compared to reconstruction, remodeling has advantages in terms of the construction period, cost, and environmental impact. As such, the current Korean regulations are more favorable for remodeling than reconstruction. Typically, several candidate floor plans are presented in the early stages of an apartment remodeling project. Extracting information about bearing walls and other structural elements from the multiple plans to compare those plans quantitatively is one of the essential tasks during the early stage of a project. To cope with this task, an automated data extraction method for walls and slabs from before and after remodeling plans is developed. Through the developed program, load-bearing walls, non-bearing walls, slabs, and weight changes after remodeling can be analyzed and visualized in a fast and automated manner.

  • PDF

The Change of Outdoor Space in Apartment Complex and Its Causes (아파트 단지 옥외공간 변천 및 요인 연구)

  • Kim, Dae-Hyun;Kim, Dae-Soo;Sin, Ji-Hoon;Kim, Soon-Boon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.6 s.107
    • /
    • pp.52-67
    • /
    • 2005
  • The purposes of this study were to classify the changing periods of apartment outdoor space in Korea and to clearly understand the specific characteristics of each period. The study has been done through on-site observation of apartment complexes, and through the analysis of housing estate planning techniques, rules and regulations affecting outdoor spaces during the rapidly developing era. The results of this study shows that three major periods with distinct characteristics were found, which were as follows: 1) The first well defined period spans from 1960 to 1990. In this period, apartment construction was rapid, and as a result, quality of housing environments were sacrificed. As little attention was given to the landscapes in apartment complex, they were constructed very simple and identical in outdoor space of apartment complex. This period can be referred to as the 'commonly universal period in apartment outdoor space'. 2) The second period spans from 1991 to 1996, during which time a housing construction project for two million residences was completed in order to significantly stimulate the provision of houses to the general public. As a result, regulations were relaxed causing housing environments to deteriorate. Although apartments were constructed very close together, there was some diversification and experimentation in outdoor styles. This period can be referred to as the 'congestion period of apartment outdoor space'. 3) The third period spans from 1997 to the present. During this time the number of unsold apartments has grown considerably throughout the country. Many different apartment complex marketing strategies have been employed to reduced the glut of unsold apartments. This experimental trend has continued and been well-received since the IMF period. The distinguishing characteristics of this period are the introduction of a rich natural landscape, the increase in communications among residents, the human oriented design, and the refined and elegant design for the outdoor street furnitures. As a result, this period can be named the "differentiation period of apartment outdoor space".

The Business Model & Feasibility Analysis of the Han-Ok Residential Housing Block (한옥주거단지 사업모델구상 및 타당성 분석)

  • Choi, Sang-Hee;Song, Ki-Wook;Park, Sin-Won
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.453-461
    • /
    • 2011
  • This study is to derive a project model based on potential demand for Korean-style houses, focusing on new town detached housing sites that LH supplies and to test validity of the derived model and to present the direction and supply methods of the projects. The existing high-class new town Korean-style housing developments that have been considered were found to have little business value due to problems in choice of location and discordance of demand, so 6 types of projects were established through the methods of changes in planned scale, combined use, and subdivision of plot of land based on the results of survey. The type that has the highest business value among the project models was block-type multifamily houses, and this can be interpreted as the increase in total construction area leading to increase inrevenues of allotment sales due to economies of scale. The feasibility of mass housing model in which small-scale Korean-style houses are combined with amenities was found to be high, and if the same project conditions as those of the block-type multifamily houses are applied, the business value of the Korean-style tenement houses was found to be high. Besides, the high-class housing models within block-type detached housing areas are typical projects that the private sector generally promotes, and the construction cost was found to be most expensive with 910 million won per house. In order to enhance the business value of the Korean-style housing development, collectivization such as choice of location, diversification of demand classes, optimization of house sizes, and combination of uses is needed. And in order to adopt Korean-style houses in the detached housing sites, the adjustments and division of the existing planned plots are needed, and the strategies to cope with new demand through supplying Korean-style housing types of sites can be suggested. Also breaking away from the existing uniform residential development methods, the development method through supplying original land that is natural land not yet developed besides basic infrastructures (main roads and water and sewage) can be considered, and as the construction of more than 1~2 stories building is impossible due to the structure of Korean-style house roof and furniture. So it can be suggested that original land in the form of hilly land is considered to be most suitable to large-scale development projects.

Recent Status on the Recycling of Construction Waste and Research Trends - The Current Situation of Recycling Technology for Waste Resources in Korea(4) - (건설폐기물(建設廢棄物)의 리싸이클링 현황(現況)과 연구동향(硏究動向) - 국내자원(國內資源)의 유효이용(有效利用)을 위한 처리(處理) 및 회수기술동향(回收技術動向)(4) -)

  • Oh, Jae-Hyun;Kim, Mi-Sung;Shin, Hee-Duck;Min, Ji-Won
    • Resources Recycling
    • /
    • v.17 no.2
    • /
    • pp.16-29
    • /
    • 2008
  • According to the statistical data of the Ministry of Environment, 47million tons of construction waste were generated, and 96.7% of them was recycled in 2005. However, the recycled products seem to be remained under low quality. Because mixed demolition and construction waste, so called DC Waste, including concrete, brick, plaster, lumber, plastics building materials, paper and some dirt and stone, is very variable and difficult to estimate its exact composition, it is regarded as having little or no value to the construction industry. 'The Research group on recycling of construction waste' was started by the Housing & Urban Research Institute(KNHC), which is sponsored as a large scale national project by the Ministry of Construction and Transportation. This research group intends to establish recycling system through planing, processing, developing practical technology, and eventually contribute to save natural resource and to vitalize the industry. In this paper an overview of DC waste management and recycling technology is given in some detail. Particularly, "recycling law of construction waste" and recent research trends on recycling of construction waste are discussed.

Improvement Strategy & Current Bidding Situation on Apartment Management of Landscape Architecture (공동주택 조경관리 입찰 실태와 개선방안)

  • Hong, Jong-Hyun;Park, Hyun-Bin;Yoon, Jong-Myeone;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.48 no.4
    • /
    • pp.41-54
    • /
    • 2020
  • This study was conducted to provide basic data for a transparent and fair bidding system by identifying problems and suggesting improvement measures through an analysis of the bidding status for construction projects and service-related landscaping of multi-family housing. To this end, we used the data from the "Multi-Family Housing Management Information System (K-apt)" that provides the history of apartment maintenance, bidding information, and the electronic bidding system to examine the winning bid status and amount, along with the size and trends of the winning bids by year, and the results of the selection of operators by construction type. As a result, it was found that out of the total number of successful bids (36,831), 4.4% (16,631) were in the landscaping business, and the average winning bid value was found to be about 24 million won. According to the data, 73% of the landscaping cases were valued between 3 million won and 30 million won, and 58.6% of the cases were in the field of "pest prevention and maintenance". 36% of the total number of bids were awarded from February to April, with "general competitive bidding" accounting for 59.8% of the bidding methods. As for the method of selecting the winning bidder, 55% adopted the "lowest bid" and "electronic bidding method," and 45% adopted the "qualification screening system" and "direct bidding method." As an improvement to the problems derived from the bidding status data, the following are recommended: First, the exception clause to the current 'electronic bidding method' application regulations must be minimized to activate the electronic bidding method so that a fair bidding system can be operated. Second, landscaping management standards for green area environmental quality of multi-family housing must be prepared. Third, the provisions for preparing design books, such as detailed statements and drawings before the bidding announcement, and calculating the basic amount shall be prepared so that fair bidding can be made by specifying the details of the project concretely and objectively must be made. Fourth, for various bidding conditions in the 'business operator selection guidelines', detailed guidelines for each condition, not the selection, need to be prepared to maintain fairness and consistency. These measures are believed to beuseful in the fair selection of landscaping operators for multi-family housing projects and to prepare objective and reasonable standards for the maintenance of landscaping facilities and a green environment.

Overview of Seismic Loads and Application of Local Code Provisions for Tall Buildings in Baku, Azerbaijan

  • Choi, Hi Sun;Sze, James;Ihtiyar, Onur;Joseph, Leonard
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.1
    • /
    • pp.65-71
    • /
    • 2014
  • Baku, the capital of Azerbaijan, has seen a boom in construction in recent years. The old Baku city has been rapidly transforming into a new hub of high-rise buildings and lively cultural centers hosting the Euro Vision Song Contest in 2012 and European Games in 2015. A major population shift to Baku from its suburbs and the countryside has resulted in the doubling of Baku's population in the 4 years between 2009 and 2013. As of January 2013, Baku's population reached four million people, 43% of the citizens in Azerbaijan according to The State Statistical Committee of Azerbaijan. With this trend, the city needs more high-rise buildings to accommodate rapidly increasing demands for more housing and business space. Until the Azerbaijan Seismic Building Code was published in 2010 and became effective, many different seismic criteria, in terms of building codes and seismic intensities, were used for all new high-rise projects in Baku. Some designers used the SNIP (Russian) code with seismic level 9 or level 8 with 1 point penalty. Others used the Turkish code with Seismic Zone 1, UBC 97 with Zone 2 through 4, or IBC with Sa = 0.75 g through 1.0 g. The seismic intensity is now clarified with the Azerbaijan Seismic Building Code. However, the Azerbaijan Seismic Building Code is appropriate for low-rise buildings applications but may be inappropriate for high-rise project applications. This is because the code-defined response spectrum yields unrealistically conservative seismic forces for high-rise buildings with long periods, as compared to those determined by other internationally accepted building codes. This paper provides observations and recommendations for code-based seismic load assessment of high-rise buildings in the Baku area.