• Title/Summary/Keyword: test system

Search Result 26,704, Processing Time 0.049 seconds

Auto_Test Management System for LBS Mobility Test in Wireless Mobile Networks (무선 모바일 네트워크상에서 LBS 이동성 테스트를 위한 Auto_Test 관리 시스템)

  • Lee, Chong-Deuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.3060-3069
    • /
    • 2010
  • LBS is service technique to provide several service which are required to user by user's location information for mobile. This paper presents Auto_Test system of testing the mobility performance of mobile clients in wireless mobile networks. In spite of importance of mobility management, currently the study of mobility management is not enough, therefore we have developed modulated Auto_Test management system for resolve the mobility management. The proposed system is composed of distance-based monitoring, location-based monitoring, scenario management, mobility management and statistic management, it makes the control by individual module. Simulation results show that the proposed system outperforms the existing systems.

Flow Network Analysis for the Flow Control of a Main Cooling Water System in the HANARO Fuel Test Loop (하나로 핵연료 시험 루프 주냉각수 계통의 유량 제어에 대한 유동 해석)

  • Park, Young-Chul;Lee, Yong-Sub;Chi, Dae-Yong
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.5
    • /
    • pp.7-12
    • /
    • 2009
  • A nuclear fuel test loop(after below, FTL) is installed in the IRI of an irradiation hole in HANARO for testing the neutron irradiation characteristics and thermo hydraulic characteristics of a fuel loaded in a light water power reactor or a heavy water power reactor. There is an in-pile section(IPS) and an out-pile section(OPS) in this test loop. When HANARO is operated normally, the fuel loaded into the IPS has a nuclear reaction heat generated by a neutron irradiation. To remove the generated heat and to maintain the operation conditions of the test fuel, a main cooling water system(MCWS) is installed in the OPS of the FTL. The MCWS is composed of a main cooler, a pressurizer, two circulation pumps, a main heater, an interconnection pipe line and instruments. The interconnection pipeline is a closed loop which is connected to an inlet and an outlet of the IPS respectively. The MCWS is under a cold function test during a start-up period. This paper describes the system flow network analysis results of the flow control of a main cooling water system in the HANARO fuel test loop. It was confirmed through the results that the flow was met the system design requirements.

A Study on the Reliability Demonstration for Korea High Speed Train Control System (한국형고속철도 열차제어시스템 하부구성요소 신뢰도입증에 관한 연구)

  • Lee, Jae-Ho;Lee, Kang-Mi;Kim, Young-Kyu;Shin, Duc-Ko
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.6 s.37
    • /
    • pp.732-738
    • /
    • 2006
  • This research provides a scheme for Highly Accelerated Stress Test that is necessary to demonstrate reliability prediction of Korean Rapid Transit Railway Train Control System sub-equipment, which is calculated by a relevant standard for failure rate prediction of electronic products. Although determining failure information generated in the process of trial running by statistic analysis is widely accepted as a measure of confirmation for reliability prediction, this research suggests the modeling for System Life Test determined by accelerating stress factors as a measure of confirmation for reliability prediction of sub-equipment unit that is generated ahead of a trial running in System Life Cycle. Consequently, the research demonstrates sub-equipment unit reliability test, which is based on the model derived from Accelerated Stress Test, according to accuracy level and the number of samples, and conducts an official experiment by making out a reliability test procedure sheet based on test time as well.

Major Reforms and Issues of the Medical Licensing Examination Systems in Korea (의사면허 필기시험 제도의 성과와 과제)

  • Baik, Sang-Ho
    • Korean Medical Education Review
    • /
    • v.15 no.3
    • /
    • pp.125-135
    • /
    • 2013
  • Since the establishment of the national medical licensing examination board in 1992, the medical licensing examination system has changed enormously and this has had a number of impacts on examination services. All those reforms were aimed at improving the relevance and reliability of the test. Several attempts of the testing system have appeared in the new examination service, and which have also brought about the changes in the medical school curriculum such as introducing integrated courses instead of traditional subjects, using test scores as a reference to the post-graduation selection test. Some examples of changes in the examination system are as follows: 1) choosing three integrated test subjects and outlines of their reference content instead of 15 academic subjects, 2) adjusting the ratio of multiple choice question items to focus more on the problem solving level, 3) introduction of 'one-best answer' single set and 'extended matching type items, 4) item construction based on real clinical cases and real clinical materials. Recently, a clinical skill test system has been introduced to measure examinees' basic clinical skills competencies. Despite continuing efforts, the examination system still has many issues remaining to be solved. These problems include the differential weighting of test items, appropriate threshold for passing, and practicality of pre-testing to stabilize the passing rate and avoid the hazards of newness and undesirably difficult test items.

A Standard Test Methods of Resistance to Root Penetration for Waterproofing and Rootproofing Membrane Using Green Roof System (인공지반녹화용 멤브레인 방수 및 방근재료의 방근성능 평가 방법 제안 연구)

  • Lee, Jung-Hoon;Seon, Yun-Suk;Kwak, Kyu Sung;Oh, Sang-Keu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.141-148
    • /
    • 2009
  • The purpose of this paper is to propose a standard test methods of resistance to root penetration for waterproofing and rootproofing membrane using green roof system. Green roof system is considered to be an important subject in construction industry for green growth project. At the same time, we have to consider the counterplan for protection the damage of waterproofing layer and concrete substrate from the penetration of plant root. But many kinds of materials for protection from root penetration are using in construction field. But the performance of those materials is not clear, and there is not test methods for the evaluation of performance. So in this paper, based on the research results of 4 institutes during four years and foreign cases, we made a standard test methods of resistance to root penetration for waterproofing and rootproofing membrane using green roof system. This test method deals with about environmental condition of laboratory, experimental facilities, kinds of plant, specimen of test, management methods, evaluation duration and documents, etc.

  • PDF

Development and Application of New Evaluation System for Ride Comfort and Vibration on Railway Vehicles

  • Yoo Wan-Suk;Lee Chang-Hwan;Jeong Weui-Bong;Kim Sang-Hyun
    • Journal of Mechanical Science and Technology
    • /
    • v.19 no.7
    • /
    • pp.1469-1477
    • /
    • 2005
  • Vibrations related to ride comfort should be considered at the beginning of design stage. In general, ride comfort of human is mainly affected by vibration transmitted from the floor and seat. Also, vibration level is very important regarding with running safety on freight wagon. To ensure ride comfort for passenger coach and vibration level for freight wagon, tests had been repeated by different test procedures with several equipments. With different measuring and evaluations for these results, it took much time to evaluate test results. In this paper, a new evaluation procedure was developed combining several software for ride comfort and vibration level test on railway vehicles. In addition, this developed system is capable of ride comfort test and vibration test by a single integrated system that is capable of immediate reporting the test result. With this developed system, the comfort in a passenger coach and the vibration in a freight car were evaluated. And the simulation results from the proposed system are verified by a field test.

Economic Analysis of the Piezoelectric Power using the California Standard Test (캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.

Real-time Fault Detection Method for an AGPS/INS Integration System

  • Oh, Sang-Heon;Yoon, Young-Seok;Hwang, Dong-Hwan
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.974-977
    • /
    • 2003
  • The GPS/INS integration system navigation can provide improved navigation performance and has been widely used as a main navigation system for military and commercial vehicles. When two navigation systems are tightly coupled and the structure is complicated, a fault in either the GPS or the INS can lead to a disastrous failure of the whole integration system. This paper proposes a real-time fault detection method for an AGPS/INS integration system. The proposed fault detection method comprises a BIT and a fault detection algorithm based on chi-square test. It is implemented by real-time software modules to apply the AGPS/INS integration system and van test is carried out to evaluate its performance.

  • PDF

Pharmacist Education and National License Examination System in North Korea (북한의 약사교육 시스템과 시험제도(국가면허) 연구)

  • Lee, Hye Kyoung
    • Korean Journal of Clinical Pharmacy
    • /
    • v.25 no.4
    • /
    • pp.216-222
    • /
    • 2015
  • Unity, understanding our pharmacist pharmacy education and training and their ecosystems rather then overwrite the system will get you ready to integrate and balance searching for contacts. Since 2015 we started the 6-year pharmacy education in the North were already carried out (the current 5.5 years). This chemist (or pharmacist) educate university education and vocational school and health officials made in the training school in jimyeo. Duration of each is to the University of 5.5 years, college three years, health officer training school two years and various types of training methods (weekly, communication, special) is applied is positive. License test system is also in favor of the state graduation test graduation test committee of professors in the university college diploma than the national notification system, and pharmacists 'qualifications' - are licensed is granted. The North Korean education system pharmacists and pharmacist review and analysis test system for the future reunification of Korea oriented education system pharmacists and pharmacists in health care personnel office systems through correct understanding and awareness-will be a useful resource integration plan designed to pharmacists.

Study on the Liquid Rocket Engine Health Monitoring and Emergency Protection System (액체로켓엔진 상태진단/비상보호시스템 연구)

  • Kim, Seung-Han;Nam, Chang-Ho;Seol, Woo-Seok
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2007.11a
    • /
    • pp.178-182
    • /
    • 2007
  • This paper reviews on the LRE health monitoring and emergency protection system to protect test object engine system and engine test facility, in case of various fault occurrence at LRE testing. General composition and major technical consideration of LRE health monitoring system and emergency protection system are reviewed. Moreover, some application of LRE health monitoring/emergency protection system to development test of major LRE component such as turbopump testing, gas generator and combustion chamber test are reviewed.

  • PDF