• Title/Summary/Keyword: test plan

Search Result 1,805, Processing Time 0.023 seconds

Design of a Life Test Sampling Plan Based on the Cost Model

  • Kwon, Young-Il
    • International Journal of Reliability and Applications
    • /
    • v.6 no.1
    • /
    • pp.31-39
    • /
    • 2005
  • An economic life test sampling plan for products with exponential lifetime distribution is developed. To reduce test time, a test plan with curtailed Type II censoring is considered. A cost model is constructed which involves three cost components; test cost, accept cost, and reject cost. Determination of optimal plan minimizing the expected average cost per lot is discussed with a constraint related to consumer's risk. Some numerical examples are provided.

  • PDF

Improving Reuse of Test Strategy based on ISO/IEC Standards

  • Min, Kyeongsic;Lee, Jung-Won;Lee, Byungjeong
    • Journal of Internet Computing and Services
    • /
    • v.20 no.6
    • /
    • pp.37-46
    • /
    • 2019
  • A test plan is a high level document detailing objectives, processes, schedules and so on for verifying a developed software. And a test strategy, a component of a test plan, is about how to test software products to guarantee its quality and find bugs in the software in advance. Therefore, establishing effective and suitable test strategies is important for elaborating test processes. However, these tasks are difficult for project managers who write a test plan if they were not trained well in software test processes. And mis-designed test strategies will also mislead entire testing behaviors that testers would do. As a result, there would be a low quality software product in the end. To solve this problem, we propose a new test strategy reuse technique in this paper. By utilizing test plans of already completed software development projects, we lead test planer to reuse suitable and effective test strategies which were used in previous projects. To do so, we evaluate existing test strategies by utilizing ISO/IEC 25010 quality model for evaluating the suitability of test strategies and also use effectiveness metrics for test strategies. And from these evaluations, we predict completeness of new test plan that is written by reused test strategies. It can help the project manager to write an appropriate test plan for the quality characteristics which are selected as objectives for testing and software product. We show the possibility of our approach by implementing a prototype into the existing framework in a case study.

A Study on the Standard Establishment of Test-Bed Master Plan for Successful Realizations of U-City (U-City의 성공적 구현을 위한 테스트베드 기본계획의 기준 수립에 관한 연구)

  • Lee, Jae-Yong;Pi, Min-Hee;Jung, Ju-Young;Shin, Dong-Bin
    • Spatial Information Research
    • /
    • v.18 no.1
    • /
    • pp.1-10
    • /
    • 2010
  • Even after many constructions of test-beds to verify R&D results, there is no standard to set up a consistent and systematic test-bed master plan. Therefore, this research derives standards of a u-city test-bed master plan. To verify these standards, the research constructs the potential U-City master plan targeting Cheongna district in Incheon. Standards of a test-bed master plan which is suggested by this research will bring strengths to construct a test-bed such as clear construction procedures from presenting directions of planning, saving cost, effective management of equipments, and so on.

Compound Linear Test Plan for 3-level Constant Stress Tests

  • Kim, In-Ho
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.3
    • /
    • pp.945-952
    • /
    • 2006
  • Several accelerated life test plans use tests at only two levels of stress and thus, have practical limitations. They highly depend upon the assumption of a linear relationship between stress and time-to-failure and use only two extreme stresses that can cause irrelevant failure modes. Thus 3-level stress plans are preferable. When the lifetime distribution of test unit is exponential with mean lifetime $\theta_i$ at stress $x_i$, i=0, 1, 2, 3, we derive the optimum quadratic plan under the assumption that a quadratic relationship exists between stress and log(mean lifetime), and propose the compound linear plans, as an alternative to the optimum quadratic plan. The proposed compound linear plan is better than two other compromise plans for constant stress testing and nearly as good as the optimum quadratic plan, and has the advantage of simplicity.

  • PDF

A Study on the Rectifying Inspection Plan & Life Test Sampling Plan Considering Cost (소비자 보호를 위한 선별형 샘플링 검사와 신뢰성 샘플링 검사의 최적설계에 관한 연구)

  • 강보철;조재립
    • Journal of Korean Society for Quality Management
    • /
    • v.30 no.1
    • /
    • pp.74-96
    • /
    • 2002
  • The objectives of this study is to suggest the rectifying sampling inspection plan considering quality cost. Limiting quality level(LQL) plans(also called LTPD plans) and outgoing quality(OQ) plans are considered. The Hald's linear cost model is discussed with and without a beta prior for the distribution of the fraction of nonconforming items in a lot. It is assumed that the sampling inspection is error free. We consider the design of reliability acceptance sampling plan (RASP) for failure rate level qualification at selected confidence level. The lifetime distribution of products is assumed to be exponential. MIL-STD-690C and K C 6032 standards provide this procedures. But these procedures have some questions to apply in the field. The cost of test and confidence level(1-$\beta$ risk) are the problem between supplier and user. So, we suggest that the optimal life test sampling inspection plans using simple linear cost model considering product cost, capability of environment chamber, environmental test cost, and etc. Especially, we consider a reliability of lots that contain some nonconforming items. In this case we assumed that a nonconforming item fail after environmental life test. Finally, we develope the algorithm of the optimal sampling inspection plan based on minimum costs for rectifying inspection and RASP. And computer application programs are developed So, it is shown how the desired sampling plan can be easily found.

A Failure-Censored Accelerated Life Test Sampling Plan with Both Life Specification Limits (수명의 양쪽규격을 고려한 정수중단 ALT 샘플링검사 계획)

  • 류근중;강창욱
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.45
    • /
    • pp.319-328
    • /
    • 1998
  • In this paper, the design of ALT(Accelerated Life Test) requires a sampling plan based on failure-censored(Type II censored) ALT with lognormal life distribution. Specially the environmental effect of products has been emphasized, so we considered the upper life limit as well as lower life limit in the ALT sampling plan. The optimal plan with a high stress and a low stress is used as test plan, and the total sample size for test and lot acceptability constant which minimize an asymptotic variance of maximum likelihood estimator of assumed model parameters and satisfy the given producer's risk and customer's risk are drawn out. These values can be acquired by means of the computer program that we coded for resolving the difficulty and complexity of calculation.

  • PDF

Design of Accelerated Life Test Plans for the Lognormal Failure Distribution under Intermittent Inspection (대수정규분포와 간헐적 검사하에서 가속수명시험방식의 설계)

  • Seo, Sun-Keun;Cho, Ho-Sung
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.2
    • /
    • pp.25-43
    • /
    • 1996
  • This paper presents the optimal and practical constant-stress accelerated life test plans for the lognormal lifetime distribution tinder assumptions of intermittent inspection and Type-I censoring. In an optimal plan, the low stress level and the proportions of test units allocated at each stress are determined under given inspection scheme and number of inspections such that the asymptotic variance of the maximum likelihood estimator of a certain quantile at use condition is minimized. Although the practical plan adopts the same design criterion, it involves three rather than two overstress levels in order to compromise the practical deficiencies of the optimal plan. Computational experiments are conducted to choose an allocation plan and a inspection scheme of the practical plan and to compare with test plans over a range of parameter values.

  • PDF

Optimum multi-objective modified step-stress accelerated life test plan for the Burr type-XII distribution

  • Srivastava, P.W.;Mittal, N.
    • International Journal of Reliability and Applications
    • /
    • v.15 no.1
    • /
    • pp.23-50
    • /
    • 2014
  • This paper deals with formulation of optimum multi-objective modified step-stress accelerated life test (ALT) plan for Burr type-XII distribution under type-I censoring. Since it is impractical to estimate only one objective parameter after conducting costly ALT tests; also, it is not desirable to assume instantaneous changes in stress levels because of limited capacity of test equipments and the presence of undesirable failure modes, therefore, an optimum multi-objective modified step-stress ALT plan has been designed. The optimal test plan consists in determining the optimum low stress level and optimal time at which stress starts linearly increasing from low stress by minimizing the weighted sum of the asymptotic variances of the maximum likelihood estimator of quantile lifetimes at design constant stress. The method developed has been illustrated using an example. Sensitivity analysis has been carried out. Comparative study has also been done to highlight the merits of the proposed model.

  • PDF

A Layout Plan of a Pressure-fed Hot-firing Test Facility for the Performance Evaluation of a Combustion Chamber (연소기 성능평가를 위한 가압식 연소시험설비의 배치 계획)

  • Lee, Kwang-Jin;Cho, Nam-Kyung;Han, Young-Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.465-467
    • /
    • 2012
  • A layout plan of a pressure-fed test facility to carry out hot-firing test of liquid rocket engine combustion chamber and purpose of rooms located in the test building were proposed. The layout plan of suggested infrastructure in this paper was determined depending on the design of a vertical test facility to use the natural lay of the land and simulate the initial position of flight model.

  • PDF

A Review of Instrumentation System and Construction of Korea Highway Test Road (시험도로 건설과 계측시스템 구축)

  • 최준성;김도형;김성환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF