• Title/Summary/Keyword: team projects

Search Result 380, Processing Time 0.025 seconds

A Study on the Change of Learning Satisfaction and Comprehension of Team Project Instruction Using Creative Capstone Design (창의적 캡스톤 디자인을 활용한 팀 프로젝트수업 운영에 따른 학습만족도 및 이해도 변화에 관한 연구)

  • Kim, Changhee
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.13 no.4
    • /
    • pp.179-191
    • /
    • 2017
  • The purpose of this study is to investigate the change of comprehension degree about learning satisfaction and capstone class by applying the subject which draws idea for team project task in college to creative capstone design program. The Capstone Design Program is designed to train fieldworkers with creative problem solving skills and is widely applied as a problem-solving course in team-based projects. In this paper, based on the case study of the 'fusion capstone design' operated in the first semester of 2015 ~ 2017, the capstone design course was established in the course of designing ideas for problem solving. The results of this study are as follows: First, the questionnaire about capstone design instruction process, instruction method, and learning achievement satisfaction were analyzed. As a result, understanding of capstone design was found to be higher than that of class before class, and satisfaction of performance course, method of teaching performance and learning outcome were obtained.

A New Team Forming Method in Engineering Design Course

  • Kim, Jongwan
    • Journal of Multimedia Information System
    • /
    • v.4 no.4
    • /
    • pp.243-248
    • /
    • 2017
  • In a basic engineering design class, first year engineering department students learn about engineering design relevant theories and carry out simple projects in teams. By doing a group project in this subject, students develop basic skills such as creativity, teamwork, communication, and problem solving. Before, class proceeded in a way where teams were randomly configured in the beginning of semester and students began working on their project immediately. However, this research introduces a new method where at the beginning of the semester, students are assigned group assignments. Teammates are randomly chosen and constantly switched so that students get a chance to work with different people and experience diverse styles and characteristics. Then, they autonomously form into teams with people they work best and carry out their project. We present the behavior of a monkey robot that recognizes emotions as a case of applying the proposed method. The feedback from the students suggest that this proposed team forming method serves to be effective especially since students who were not aware of other students' characteristics can get to know one another better and form a productive team.

Final Assessment Year of Realized on Forecasting Studies of the Literature Sector on Traditional Korean Medicine (2000-2010) (한의학 미래예측(2000년~2010년) 문헌 분야 실현 최종 평가)

  • Shin, Hyeun-Kyoo;Kim, Yong-Jin
    • Journal of Korean Medical classics
    • /
    • v.26 no.1
    • /
    • pp.85-98
    • /
    • 2013
  • Objectives : Final assessment of realized on forecasting studies of the literature sector on traditional Korean medicine (2000-2010) revealed results as follows. Methods : We investigated the related peer-reviewed papers and research project reports through Oriental Medicine Advanced Searching Integrated System(OASIS) of Korea Institute of Oriental Medicine(KIOM) and several publishers. Results : Of total five projects, two were realized and three were partially done. The projects 'It wil be standardized by establishing the concept of traditional Korean medical terms' and 'CDs containing traditional medicine books from China, Japan and Korea wiil be released' were decided to be realized. In addition to those, the projects 'Systematic database will be build up for TKM books', 'translation and annotation versions on TKM old books will be completed', and 'A wide range of literature related to traditional medicine of each Asian countries' were concluded to be partially realized. Five projects on predicting TKM in the year 2006-2007 analyzed in 1996 were evaluated as realized or partially realized. Likewise, the five predictions should be reviewed whether it will be necessary in the future after assessment on their realization. Conclusion : Furthermore, it should be studies if the new projects are needed for the future in addition to the existing challenges.

A study on the Effectiveness of Urban air temperature Through Citizen Participation (시민참여형 도시온도 모니터링의 실효성에 관한 연구)

  • Kim, Eun-Sub;Lee, Dong-Kun;Won, Ji-Eun;Choi, Sun-Kyung;Kim, Mi-Hwa;Bae, Chae-Young;Park, Sang-Jin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.23 no.5
    • /
    • pp.87-98
    • /
    • 2020
  • At the point of implementing policies related to urban heat through the overall environmental assessment of the city using national data, citizen science projects that can collect data in a wide range are emerging for effective policy establishment. Although the utility of citizen data is improving, data quality is a primary concern for researchers employing public participation in scientific research. In this study, validation was conducted based on citizen data acquired in the "Suwon City Heat Map Project", and the applicability to temperature monitoring was confirmed based on the results. As a result of analyzing the validity verification of citizen data using three methods, the data result value is 0.843, RMSE: 0.683℃, and a meaningful value was found within 3km of national data. We found that citizen data utilization is high through the results of this study and These projects are expected to be used as basic data for establishing effective policies or can be reflected in the various planning.

Quantitative Analysis of Magnitude of Rework by Project Types and Sources of Rework

  • Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.202-211
    • /
    • 2006
  • Rework in the construction industry can adversely affect project cost and schedule performance. Based on direct rework costs recorded on 359 construction projects, this paper presents an assessment of the magnitude of rework by various types of projects and sources of rework. The results from this paper establish that on average 4.5% and 2.5% of actual construction costs were spent on rework for owner and contractor projects, respectively. Furthermore, this paper determines that the direct rework costs differ by project types and sources of rework. Finally, it permits the development of rework reduction initiatives. By quantifying and recognizing the different magnitude of rework, the industry can be aware of the waste from rework and develop effective plans for managing rework, ultimately improving project cost performance.

Estimating Cost Adjustment Factors of Software Development Projects using Analytic Hierarchy Process (AHP를 이용한 소프트웨어 개발비 보정계수 산정)

  • Kim, Woo-Je;Park, Chan-Kyoo;Shin, Soo-Jeong
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.1-10
    • /
    • 2004
  • The purpose of this paper is to reorganize cost adjustment factors of software development projects in estimating software development cost, and derive adjustment coefficients of application types and language types by analytical hierarchy process. We constructed a decision-making hierarchy of various criteria which determine the complexity of application types and language types, and conducted a survey on the pairwise comparison among alternatives. Finally, the cost adjustment coefficients of application types and language types were derived by analytic hierarchy process. This paper is the first study in which the analytic hierarchy process was applied to the field of estimating cost adjustment factors of software development projects.

Introduction of Detailed Design of Rach Gia Bypass Project in Vietnam (기술사마당_기술해설 - 베트남 락지아(Rach Gia) 우회도로 사업 실시설계소개)

  • Kang, Hee-Chul
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.4
    • /
    • pp.44-49
    • /
    • 2010
  • Th Rach Gia Bypass Project, to be implemented under EDCF Loan VNM-12, constitutes a strategically important part of the Greater Mekong Sub-region Southern Coastal Corridor Project(the GMS-SCCP). The main goal of the GMS strategy is to promote sustainable economic growth, improve employment, and achieve poverty reduction by tapping the comparative advantages of Vietnam, Cambodia and Thailand. As a project manager who once took a responsible position for the completion of RGBP's detailed design, I would like to briefly introduce what our design team including the local sub-contractors had performed for the D/Design of this Project last year, especially in the field of highway, bridge and soft soil treatment method widely used in Mekong Delta area. With the performance of nearly two Projects due to the V.O. in one year on the prescribed time, it was a hard year but a rewarding one. To expand our horizon more about overseas projects, several recommendations for the brighter future of overseas projects are shown herein this paper.

  • PDF

Development and Validation of a Behaviorally Anchored Rating Scale for Peer Evaluation in Group Projects (조별 과제 동료평가 행동기준평정척도 개발 및 타당화 연구)

  • Shin, Tae Seob
    • Journal of Engineering Education Research
    • /
    • v.21 no.5
    • /
    • pp.32-39
    • /
    • 2018
  • The purpose of this study was to develop and validate a behaviorally anchored rating scale for peer evaluation in group projects based on social interdependence theory. A mixed method involving a qualitative and quantitative approach was used in this study. In the qualitative study, both the individual and group interviews were conducted to college students regarding their cooperative learning experiences. Data from this qualitative research was analyzed based on 5 elements of cooperative learning and 'critical incidents' were extracted from students' own voices that would serve as specific rating criteria in the scale. Once the 'critical incidents' have been incorporated into the scale, validation from 3 independent experts was conducted. In the quantitative study, correlations with relevant variables were analyzed to examine the criteria-referenced validity. Findings suggest that the behaviorally anchored rating scale for peer evaluation in group projects can be used in various team-based learning contexts.

THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

Global Collaboration During Front End Planning of Capital Projects

  • Gibson, G. Edward Jr.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.15-18
    • /
    • 2015
  • Front end planning is arguably the most impactful process in the successful delivery of capital projects. Organizations expend substantial effort in this planning process, intending to minimize risk and promote project success. This process has been well documented, including critical technical components, as well as the importance of team collaborative components. As organizations continue to pursue large projects with multi-national participation from sponsors, designers, contractors and suppliers, the importance of collaboration on a global scale during front end planning becomes more important, not less. This paper will outline research performed over the past two decades giving the basic components of the process and the value of global collaboration. It will provide guidance to project participants in pursuing successful planning.

  • PDF