• Title/Summary/Keyword: supply rate

Search Result 2,638, Processing Time 0.039 seconds

Population growth and vermicomposting rate of earthworm (Eisenia fetida) according to amounts of feed supply and initial densities of earthworm populations (줄지렁이(Eisenia fetida) 입식 밀도 및 먹이 급이량에 따른 지렁이 개체군 생장 및 먹이 섭식효율)

  • Bae, Yoon-Hwan;Park, Kwang-Il
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.14 no.4
    • /
    • pp.104-112
    • /
    • 2006
  • Population growths of earthworm were investigated when the earthworm populations with different levels of initial densities per unit area were fed with cow dung mixed with paper mill sludge. The tested levels of earthworm densities were as follows; $1kg/m^2$, $2kg/m^2$, $3kg/m^2$, $5kg/m^2$. There were no significant differences in population growth rates 60 and 90 days after feed supply among the tested densities of earthworm. Therefore, it was suggested that initial densities of earthworm populations per unit area higher than $3kg/m^2$ should not be favorable because of the cost for purchasing earthworm. Vermicomposting rates of earthworm on feed were also investigated when different amounts of feed were supplied repeatedly to unit area of nursery bed with $5kg/m^2$ of initial densities earthworm populations. The tested amounts of feed at each supplying time were as follows; $16kg/m^2$, $24kg/m^2$, $32kg/m^2$, $40kg/m^2$. The more the amount of feed at each supplying time, the higher vermicomposting rate and population growth rate. Therefore, it should be more favorable for earthworm breeders to supply more than $40kg/m^2$ of feed at each supplying time, because it would reduce time and labor cost.

  • PDF

Characteristics of Radon Reduction of Small-scale Water Supply System (소규모수도시설 지하수의 라돈저감 특성)

  • Cho, Byong-Wook
    • The Journal of Engineering Geology
    • /
    • v.29 no.1
    • /
    • pp.37-50
    • /
    • 2019
  • It is possible that radon removal in groundwater of small-scale water supply system (SWSS) is caused by atmospheric storage and aeration facilities installed in the water tank. Radon removal rates at water tank and tap of the 32 SWSS during summer season ranged from -69.3% to 62.7% (average 25.7%) and from -64.3% to 83.1% (average 30.3%) while those of 16 SWSS during autumn season ranged from 21.3% to 78.0% (average 42.8%) and from 17.7% to 66.9% (average 44.8%). The reason of higher radon removal rate in the autumn season compared with the summer season is due to higher atmospheric storage effect by lower groundwater use rate. The radon removal rates at the water tank from 12 SWSS were 47.4~94.0% (average 78.9%), in which the removal rates at the atmospheric storage are also included. Atmospheric storage and aeration can be used to reduce radon concentration in SWSS groundwater. For more efficient use of radon reduction, further studies are necessary to assess the radon removal rate considering variation conditions of radon concentration in groundwater, size and forms of water tank, change in groundwater usage rate, aeration capacity and ventilation facilities.

Issues and Improvement Strategies on the Supply of the Public Housing Supplied through the Purchase of Existing Housing Units with Emphasis on Seoul (매입임대주택 공급의 문제점과 개선 방안: 서울을 중심으로)

  • Choi, Eun-Young;Park, Shin-Young
    • Land and Housing Review
    • /
    • v.7 no.2
    • /
    • pp.67-75
    • /
    • 2016
  • This research suggests improvement strategies for the problems of 'public housing supplied through the purchase of existing house' by understanding the situation of supply to lowest income class in Seoul where there are many demands. Due to the heavy housing expenditure burden, in spite of the fact that the needs for affordable housings are increasing, the number of 'public housing supplied through the purchase of existing house' which has been supplied to Seoul by LH & SH has decreased since 2009. It is caused by the low standard purchasing price set by government especially Seoul. Since 'the public housing supplied through the purchase of existing house' is targeted for indigenous inhabitants, different supply stocks among different regions cause equity problem. Generally regions with low income class are in short supply, on the contrary the supply is especially concentrated specific regions in outskirts of Seoul. The main reason of such new supply stagnation and regional concentration is the low standard purchasing price. Therefore, it is necessary to increase the government's standard price according to the actual transaction price. Also it is needed to associate actual transaction price's increasing rate with the government's standard price. The housing supply based on demands must be established. In addition, the provision of 'public housing supplied through the purchase of existing house' should be expanded to low-middle income inhabitants and low income youth in the regions where the supply of the affordable housing excess demands.

Effect of Oxygen Supply on the Production of Interferon ${\alpha}$-1 by Recombinant Escherichia coli in Fed-batch Fermentation (유가식 배양에서 재조합 대장균으로부터 Interferon ${\alpha}$-1 생산에 산소 공급이 미치는 영향)

  • Yi, Jong-Ghil;Moon, Seok-Young;Kim, Young-Jun;Shin, Chul-Soo;Koo, Yoon-Mo
    • Microbiology and Biotechnology Letters
    • /
    • v.35 no.3
    • /
    • pp.226-230
    • /
    • 2007
  • In order to achieve high-level expression of interferon-${\alpha}1$ (IFN-${\alpha}1$) during fed-batch fermentation of recombinant E. coli, effects of oxygen supply and induction temperature on the expression of recombinant proteins were evaluated. Supplementation of oxygen and its transfer into cells is one of the most important parameters involved in the design and operation of mixing-sparging equipment for bioreactors. Generally, higher oxygen supply stimulates cell growth of aerobic microorganism and consequently the amount of products is increased. In this study, the optimum aeration strategy for the higher production of IFN-${\alpha}1$ during fed-batch fermentation of recombinant E. coli was surveyed. The growth of the cells was also monitored with four different concentrations of dissolved oxygen (DO; limiting, 20%, 35%, 50%) conditions. The DO was controlled by varying aeration rates of air and pure oxygen. Oxygen uptake rate (OUR) and specific oxygen uptake rate (SOUR) were evaluated and compared for the enhanced growth and induction of the cells and IFN-${\alpha}1$, respectively. We confirmed that increased DO by additional oxygen supply, up to 35%, can improve the production of IFN-${\alpha}1$ during the fermentation.

Evaluation of Field Feasibility and Efficiency of Hydraulic Ram Pump (수격펌프의 효율성 및 현장 적용성 평가)

  • Lee, Soo-Hyoung;Yoon, Heesung;Kim, Dong-Hun;Shin, Esther;Kim, YongCheol;Ko, Kyung-Seok;Ha, Kyoochul
    • Economic and Environmental Geology
    • /
    • v.49 no.3
    • /
    • pp.243-248
    • /
    • 2016
  • This study was conducted to evaluate the applicability and efficiency of water supply using hydraulic ram pump. Study area is the Imgok-ri, Hwanam-myeon, Sanju-si, Kyeongsangbuk-do. There is an abandoned coal mine, where groundwater is discharged from its entrance with a flow rate of approximately $260m^3/day$. Hydraulic ram pump uses the waterhammer phenomenon and utilizes the power of falling water for pumping part of that water to a higher elevation than the water sources without electric power. To determine the efficiency of hydraulic ram pump, the flow rate was measured at three points according to the altitude difference (${\Delta}h=19m$ (point 1), 30 m (point 2), 40 m (point 3)). Flow rate measured at 1, 2, and 3 were about $8.6{\sim}10.8m^3/day$, $3.98{\sim}4.39m^3/day$, and $2.35{\sim}2.59m^3/day$, respectively. The current results suggested that, hydraulic ram pump could be applicable for the water supply system in mountain areas without external power supply.

Effect of Propellant-Supply Pressure on Liquid Rocket Engine Performance (추진제 공급압력이 액체로켓엔진의 성능에 미치는 영향)

  • Cho, Won-Kook;Park, Soon-Young;Nam, Chang-Ho;Kim, Chul-Woong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.4
    • /
    • pp.443-448
    • /
    • 2010
  • In this paper, the changes in performance parameters, e.g., the combustor pressure, turbine power, engine mixture ratio, temperature of gas generator, and product gas, of a liquid rocket engine employing gas generator cycle with the variations in propellant-supply pressure have been described. Engine performance is numerically calculated using the 13 major system-level variables of the rocket engine. The combustor pressure and turbine power increase with an increase in the oxidizer-supply pressure and decrease with an increase in fuel-supply pressure. The lower mixture ratio of gas generator for increased fuel mass flow rate decreases the gas generator gas temperature and deteriorates the gas material properties as the turbine working fluid. The turbine power decreases with an increase in fuel-supply pressure; this results in a decrease in the main-combustor pressure, which is directly proportional to engine thrust.

Prediction of Daily Water Supply Using Neuro Genetic Hybrid Model (뉴로 유전자 결합모형을 이용한 상수도 1일 급수량 예측)

  • Rhee, Kyoung-Hoon;Kang, Il-Hwan;Moon, Byoung-Seok;Park, Jin-Geum
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.4
    • /
    • pp.157-164
    • /
    • 2005
  • Existing models that predict of Daily water supply include statistical models and neural network model. The neural network model was more effective than the statistical models. Only neural network model, which predict of Daily water supply, is focused on estimation of the operational control. Neural network model takes long learning time and gets into local minimum. This study proposes Neuro Genetic hybrid model which a combination of genetic algorithm and neural network. Hybrid model makes up for neural network's shortcomings. In this study, the amount of supply, the mean temperature and the population of the area supplied with water are use for neural network's learning patterns for prediction. RMSE(Root Mean Square Error) is used for a MOE(Measure Of Effectiveness). The comparison of the two models showed that the predicting capability of Hybrid model is more effective than that of neural network model. The proposed hybrid model is able to predict of Daily water, thus it can apply real time estimation of operational control of water works and water drain pipes. Proposed models include accidental cases such as a suspension of water supply. The maximum error rate between the estimation of the model and the actual measurement was 11.81% and the average error was lower than 1.76%. The model is expected to be a real-time estimation of the operational control of water works and water/drain pipes.

Evolution of Water supply system! Smart Water Management for customer - Smart Water City Pilot Project - (수도 서비스의 진화! 소비자 중심의 스마트 물 관리 - Smart Water City 시범사업 -)

  • Kim, Jae-Bog
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.4
    • /
    • pp.511-517
    • /
    • 2015
  • Korea's modern waterworks began with construction of DDukdo water treatment plant in 1908 and has been growing rapidly along with the country's economic development. As a result, water supply rates have reached 98.5% based on 2013. Despite multilateral efforts for high-quality water supply, such as introduction of advanced water treatment process, expansion of waterworks infrastructure and so on, distrust for drinking tap water has been continuing and domestic consumption rate of tap water is in around 5% level and extremely poor comparing to advanced countries such as the United States(56%), Japan(52%), etc. Recently, the water management has been facing the new phase due to water environmental degradation caused by climate change, aging facilities, etc. Therefore, K-water has converted water management paradigm from the "clean and safe water" to the "healthy water" and been pushing the Smart Water City(SWC) Pilot Project in order to develop and spread new water supply models for consumers to believe and drink tap water through systematic water quality and quantity management combining ICT in the whole water supply process. The SWC pilot projects in Pa-ju city and Go-ryeong county were an opportunity to check the likelihood of the "smart water management" as the answer to future water management. It is needed to examine the necessity of smart water management introduction and nationwide SWC expansion in order to improve water welfare for people and resolve domestic & foreign water problems.

A Study on the Development of Supply-Demand Outlook Model for Jeju Winter Radish (제주 월동무 중장기 수급전망 모형의 개발)

  • Kim, Bae-Sung;Ko, Bong-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.3
    • /
    • pp.1471-1477
    • /
    • 2014
  • This paper addresses the development on supply-demand outlook model of Jeju winter radish and introduces a projection of supply-demand and market prices during 2014-2018 using the model. The supply-demand outlook model is specified as a partial equilibrium model of Jeju winter radish. Each equation in the model is estimated by using the econometric techniques. A review of the model stability is also carried out by the references based on RMSPE, MAPE, and Theil's inequality coefficients. According to the reference of RMAPE, the error rates of the forecasting values of the cultivation ares, production quantity, and consumption quantity show less than 4% and the error rate of market price is below 10%. The cultivation area and production quantity are projected respectively to be increased to 6,650ha and 433,310MT in 2018.

Benefit of the Drinking Water Supply System in Office Building by Rainwater Harvesting: A Demo Project in Hanoi, Vietnam

  • Dao, Anh-Dzung;Nguyen, Viet-Anh;Han, Mooyoung
    • Environmental Engineering Research
    • /
    • v.18 no.2
    • /
    • pp.103-108
    • /
    • 2013
  • Vietnam is a developing country with the rate around 5%-6% per year, especially in urban areas. Rapidly developed urban areas lead to stress for infrastructure and the water supply is also stressed. In Hanoi city, total water capacity from the manufactories is around one million cubic meters per day and almost the entire main water source is groundwater but it is not enough to supply all of Hanoi's people, especially in the summer. A demo project is implemented in Hanoi University of Civil Engineering (HUCE) to produce drinking water by using the rainwater and membrane system and supply for people. In this project, rainwater is collected on the rooftop of the lecture building with an area of around $500m^2$ and $100m^3$ volumetric rainwater tanks. Afterwards, the rainwater is treated by the micro-membrane system and supplied to the tap water. Total cost for construction, technology and operation in the first year is around USD 48,558. In the long-term (15 yr) if HUCE invests in the same system, with $20m^3$ volumetric storage tank, it can provide drinking water for 500 staffs in every year. The cost of investment and operation for this system is lower than 30% compared to buying bottled water with the price USD 1.8/bottle. The drinking water parameters after treatment are pH, 7.3-7.75; turbidity, 0.6-0.8 NUT; total dissolved solids, 60-89 mg/L; coliform, 0; heavy metal similar with water quality in the bottle water in Vietnam.