• Title/Summary/Keyword: structural evaluation

Search Result 4,836, Processing Time 0.025 seconds

Experimental Evaluation of Reserve Capacities for Connection Details between Steel Pipe Pile and Concrete Footing of Type-B (Type-B방식의 강관말뚝과 확대기초 연결부 상세에 따른 보유내력의 실험적 평가)

  • Han, Sang-Hoon;Hong, Ki-Nam;Kwon, Yong-Kil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.1
    • /
    • pp.183-192
    • /
    • 2008
  • Generally, application of steel pipe pile as deep foundation member needs special requirement for the connection method between steel pipe pile and concrete footing. Even though two types of connection method are suggested in the korea highway bridge code, type-B method is prevalent. In this study, vertical, lateral, and tension loading test are done for two types of type B connection to review stress concentration, formation and behavior of imaginary RC column in the footing. Welding type and hook type as the connection method are considered in this study. Test results show that welding type have the more reserve capacity than hook type and the specimens connected by the welding type behave as the imaginary RC column in the footing. However, the specimens connected by the hook type did not behave as the imaginary RC column in the footing but behave as the hinge.

Load-Carrying Capacity Evaluation of the Composite Beam Strengthened by Multi-Stepwise Thermal Prestressing Method Using Cover-Plate (커버플레이트를 이용한 다단계 온도프리스트레싱으로 보강된 합성보의 하중-저항성능 분석)

  • Ahn, Jin-Hee;Jung, Chi-young;Choi, Kyu-Tae;Kim, Sang-Hyo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.4 s.56
    • /
    • pp.159-169
    • /
    • 2009
  • In this study, static loading tests and numerical analyses of the composite beam strengthened by multi-stepwise thermal prestressing method were carried out to evaluate the prestressing effect of the thermal prestressing prestress and the sectional effect of the installed cover-plate on the increase in the load-carrying capacity of composit beam. From this study, the strengthening method using multi-stepwise thermal prestressing method (TPSM) can be applied to reduce the deflection of the composite beam as well as to strengthening the composite beam by inducing the prestress in case of the occurrence in the large deflection by the insufficiency of the section properties of the composite beam. because of the expectation of the increase in the yield load and the sectional properties of the composite beam.

Evaluation of Applicability of Cable Force Monitoring System of Cable-stayed Bridge by Field Loading Test (재하시험을 통한 사장교의 케이블 장력 모니터링 시스템의 적용성 평가)

  • Kim, Jeong-Hoon;Song, Jae-Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.1 s.53
    • /
    • pp.205-213
    • /
    • 2009
  • This study was planned to develop monitoring system of cable force to resolve cable force of cable-stayed bridge efficiently in a long-term plan. In the proposed monitoring system, firstly data are sampled from real-time acceleration record, secondly these sampled data are frequency analyzed by using the FFT(Fast Fourier Transform) algorism and lastly the analyzed results are averaged and generalized. For evaluating the applicability of this monitoring system, field loading test has performed in real cable-stayed bridge. In comparison with cable force by field manual calculation and cable force of monitoring system by semi-automatic calculation, the difference of calculated cable forces has within 1% error range and it is acceptable range. Additionally within negligible 5% error range of difference has occur between field manual calculation and monitoring system by automatic calculation. so monitoring system in this study has been verified to be reliable.

A Study on the Development of Flat-Ring Type Restrained Test Method and Performance Evaluation for Evaluating Shrinkage Cracking Properties of Concrete in Early Age (콘크리트 초기 수축균열특성 평가를 위한 판상-링형 구속시험방법의 성능평가에 관한 연구)

  • Kim, Gyu-Yong;Choi, Hyeong-Gil;Lee, Eui-Bae;Nam, Jeong-Soo;Han, Min-Ki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.188-196
    • /
    • 2009
  • In Concrete, shrinkages occur like plastic shrinkage and drying shrinkage in the early age because of evaporation and transfer of moisture. Within the country, the crack test standardized by KS is used to test the drying shrinkage of the concrete by using the restricted drying shrinkage of Dumbbell type mold, but this test is for the cracking-point and the restricted shrinkage stress. Thus it is difficult to valuate the crack quantitative test. In this study, it is intended to develop the Flat-ring type restrained test method for the shrinkage deformation movement of the concrete and to provide the quantitative data for evaluating the cracks in concrete. And it suggest the proper specimen diameter and quantitative test method about shrinkage crack properties on Flat-ring type restrained test method. And Verified the suitability.

Evaluation on the Lost Prestressing Force of an External Tendon Using the Combination of FEM and HGA: I. Theory (FEM과 HGA의 조합을 이용한 외부 긴장재의 손실 긴장력 평가: I. 이론)

  • Park, Taehyo;Jang, Hang-Teak;Noh, Myung-Hyun;Park, Kyu-Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.5 s.57
    • /
    • pp.109-120
    • /
    • 2009
  • This paper introduces a new method to estimate the loss of prestressing force for the externally prestressing tendon. The proposed method that combines of HGA and FEM is able to identify the lost tensile force of a externally prestressed tendon. The identification variables of the proposed method is a exteranlly prestressed tendon of tension, effective nominal diameter, mass per unit length and Rayleigh damping coefficients. First of all, a finite element model system is constructed to consider the effect of damping, and these variables are identified using inverse analysis technique - updating algorithm. Finally, throughout total 3 cases of numerical tests, the numerical propriety of the proposed method is verified. Here, it is seen that the errors in the estimated variables by the proposed method are about 1% except in the case of Rayleigh damping coefficients.

An Experimental Study on the Performance Evaluation of Repair Method of RC Structure Using Fire Resistance Engineered Cementitious Composites(FR-ECC) (고인성 내화·보수 모르타르를 활용한 RC구조물 보수공법의 성능평가에 관한 실험적 연구)

  • Kim, Jeong-Hee;Kim, Jae-Whan;Park, Sun-Gyu;Kwon, Young-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.6 s.58
    • /
    • pp.88-96
    • /
    • 2009
  • In this Study, FR-ECC(Fire Resistance Engineered Cementitious Composites) in which at same time it can improve the endurance and fire-resistance efficiency of a Structure was developed, and the experimental study such as thermal characteristic, Fire-resistance efficiency, and etc was performed for using FR-ECC as the repair materials for building and civil Structure. Moreover, it was evaluated about the field applicability of FR-ECC. As a result, FR-ECC is superior to the existence fire resistance repair mortar in strength and durability property. Also, FR-ECC was exposed to have the characteristic of being excellent than existence fire resistance mortar in the field applicability.

Performance Evaluation of Organic and Inorganic Fiber Reinforced Concrete in Tunnel Lining Structure (유·무기 섬유 혼입 터널 라이닝 콘크리트 부재의 성능 평가)

  • Lee, Jong-Eun;Kim, Tae-Won;Kim, Su-Man;Jeon, Joong-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.110-118
    • /
    • 2009
  • The tunnel structure is widely used for transportation in the mountain area. To reduce the duration of construction and thus the expense, a tunnel excavation is often performed simultaneously with a tunnel lining in in-situ. However, cracking of the tunnel lining may occur arising from the vibrating impact in the excavation process. The present study concerns the role of steel fiber and nylon fibers in tunnel lining concrete to reduce the vibrating impact. As a result it was found that both the nylon fiber and steel fiber improved the durability and physical properties of concrete.

Evaluation on the Lost Prestressing Force of an External Tendon Using the Combination of FEM and HGA: II. Experimental Verification and Field Applications (FEM과 HGA의 조합을 이용한 외부 긴장재의 손실 긴장력 평가: II. 실험적 검증 및 현장적용)

  • Jang, Hang-Teak;Noh, Myung-Hyun;Park, Kyu-Sik;Park, Taehyo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.5 s.57
    • /
    • pp.121-132
    • /
    • 2009
  • This paper introduces an experimental verification and a field application of the proposed technique using the combination of FEM and HGA about the loss prestressing force of an exteranl tendon by above same authors. The vibration tests have been conducted by using a laboratory models and the externally prestressed tendon at the field and the natural frequencies are extracted from the vibration tests. The proposed technique based on the extracted natural frequencies is applied. It is seen that the errors in the tension and lost prestressing force by proposed technique are about 4% from a laboratory model test. For the model verification at field, exact modeling has beem made with Rayleigh damping. It is seen that the error in the tension by proposed technique is less than 1% and the estimated lost prestressing force converges less than the exact value.

Evaluation of the Bonding Behavior of the Rehabilitation Method Applying Carbon Fiber Subjected to the Variation of Environmental Condition (탄소섬유 접착 보강공법의 환경변화에 따른 부착특성 평가)

  • Han, Cheon Goo;Byun, Hang Yong;Park, Yong Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.2
    • /
    • pp.67-74
    • /
    • 2008
  • This paper provides the test results of bonding behavior of the interface between concrete substrate and carbon fiber in the rehabilitation method applying carbon fiber with epoxy based resin adhesive. The difference in each components was gradually increased subjected to the repetition of temperature variation, regardless of the strength of the substrate concrete, while the ultrasonic interface between each component occurred. An increase in difference of the temperature resulted in a decrease in bond strength of each component. Associated failure mode was shown to be interfacial failure and substrate concrete failure. No remarkable changes were found in the deformation and ultrasonic velocity of each component until the four cycles of the dry and moisture test. Hence, the moisture condition may not affect the bonding behavior of each component. After the repetition of dry and moisture test, corresponding bond strength was reduced to 40% of that before test. For the effect of freeze and thaw test, the cycle of freeze and thaw within 4 cycles resulted in debonding of each component.

The Evaluation for Stability at Joint Part in Composition Dam (복합댐 접합부의 안정성 평가)

  • Kim, Jae-Hong;Oh, Byung-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.3
    • /
    • pp.155-166
    • /
    • 2008
  • Research dam is consisted of concrete gravity dam that right bank department is built to concrete material, left bank department is composition dam that is consisted of rockfill dam that consist of rockfill material In domestic case, composition dam form of storage of water facilities of about 17,000 does not exist hardly in dam of irrigation water industry drinking water purpose that manage local government or other institution, Even if exist, is real condition that there is total nonexistence administrator fare of facilities, Choose unique dam of domestic multipurpose dam and analyzed conduct special quality of con'c gravity dam and rockfill dam joint part To analyze dynamic conduct special quality of composition dam by analytic method in this research, Do modelling via axis of dam and achieved static(Psuedo-static, modify Psuedo-static) and dynamic analysis, When achieving earthquake response analysis, analyzed seismic response analysis between concrete part and rockfill's part.