Abstract
This study was planned to develop monitoring system of cable force to resolve cable force of cable-stayed bridge efficiently in a long-term plan. In the proposed monitoring system, firstly data are sampled from real-time acceleration record, secondly these sampled data are frequency analyzed by using the FFT(Fast Fourier Transform) algorism and lastly the analyzed results are averaged and generalized. For evaluating the applicability of this monitoring system, field loading test has performed in real cable-stayed bridge. In comparison with cable force by field manual calculation and cable force of monitoring system by semi-automatic calculation, the difference of calculated cable forces has within 1% error range and it is acceptable range. Additionally within negligible 5% error range of difference has occur between field manual calculation and monitoring system by automatic calculation. so monitoring system in this study has been verified to be reliable.
본 연구에서는 사장교의 케이블 장력을 장기적인 관점에서 보다 효과적으로 분석하고 모니터링할 수 있는 케이블 장력 모니터링 시스템을 개발하는 연구를 수행하였다. 제안된 모니터링 시스템에는 실시간 동적 데이터에서 일정 대상시간 동안의 가속도 데이터를 선정하고, 이를 고속 푸리에 변환 알고리즘에 적용하여 주파수 분석한 결과를 평균하여 일반화시키는 신호해석이론이 적용되었다. 제안된 케이블 장력의 모니터링 시스템의 적용성을 평가하기 위하여 실제 공용중인 사장교에 대한 현장재하시험을 실시하였다. 현장계측을 통한 수동으로 계산된 장력과 모니터링 시스템의 강제저장 기능을 통해 저장된 데이터를 수계산하여 반자동으로 계산된 장력을 비교한 결과, 장력차이가 1% 이내로 발생하였고, 제안된 모니터링 시스템에서 자동으로 계산된 장력을 비교한 결과에서는 약 5% 범위의 무시할만한 차이로 나타나 본 연구에서 제안된 사장교 케이블 장력 모니터링 시스템의 신뢰도를 검증하였다.