Journal of the Korean Institute of Landscape Architecture
/
v.31
no.1
/
pp.66-77
/
2003
The purpose of this study is to propose a standard putting green management program to prepare fast green suitable for international golf tournaments, and to conform whether the reported green speed model can be applied to the real field situations. The west course of Lakeside Country Club was selected for the case study. This study was initiated on August 1st, 2001 and continued through October 4th, 2001. The results are summarized as follows: 1. Following the long-term schedule, 'penncross' creeping bentgrass turf was mowed at 5.0mm(37days), 4.5mm(8days), 4.0mm(4days), 3.5mm(2days), 3.2mm(2days), 3.0mm(2days), 2.8mm(2days) and the mowing direction was changed daily. Variation of mowing height was reduced to a minimum range. Core aerification with deep tines was applied 19 days prior to the first practice round. Dry sand maintenance was top-dressed 2 times at 1.5mm/$m^2$ on the 17th day and 1.0mm/$m^2$ on the 10th day. Minimum irrigation was applied to keep the turf alive. During the tournament preparation week, dew on the putting greens was removed by using a sponge roller. Following the dew removal, the greens were cut once each morning at a height of 2.8mm. The mower used was the 21 inch working behind mower equipped with a tournament bedknife and 11 reel blades. Following the mowing, the peens were rolled with a light-weight roller in one direction in the morning. Rolling was used as a finishing technique to ensure that the surface was as smooth as possible, and to provide true ball roll and maximum green speed. In conclusion these management practices satisfied the daily green stimpmeter readings required for USGA championship play. 2. During the period of tournament preparation, no damage was observed on the green, but scalping in green edge appeared in about 0.39% of the total area of 18 greens in the west course.
This study was carried out to propose low types of green speed expectation models for fast putting green management by changing mowing height($4.0{\sim}2.5$ mm) and timing of rolling, dew removal and dew removal+rolling. Ball roll distance data were taken from the creeping bentgrass(Agrostis palustris Huds. 'Penncross') practice green of east course at the Lakeside C.C. in October 18, 2001 and May 25, 2002. Data were subjected to multi-regression analysis using Statistical Package for the Social Science. Among four types of green speed expectation models, the best multiple-regression equation for fast green management was as follows; $Y_4=4.171-0.225{\cdot}X_1-0.038{\cdot}X_2$ (where, $Y_4$ : green speed(m) after single dew removal+single rolling, $X_1$ : mowing height($4.0{\sim}2.5,\;X_2$ : passage of time ($0{\sim}8$ h.)). The equation[single dew removal by using sponge roller $\rightarrow$ single mowing at 3.0 mm height or less $\rightarrow$ single rolling] explained to provide fast green over 3.2 m (Stimpmeter readings required for USGA championship play) until the end of first round. Therefore, this cultural practice system was believed to provide fast putting green condition for professional golf tournament
This studies was carried out to estimate the influence of mowing height, time lapse, rolling, and dew removal on green speed of putting green in Lake Side C. C. on 29, 30 Jun. 1998. The results were as follows. As mowing height increased, green speed tended to be decreased. After mowing, green speed tended to be decreased over the time, and appeared to be decrease significantly on the next day[Y=3.206-0.127.X1-1.41$\times$10-2.X4(Y=green speed, X1=mowing height, X4=time lapse)]. This suggests that the frequency of mowing must be increased to maintain the green speed. But, frequent mowing cause the turfgrass of putting green to be stressed. Rolling tended to increase green speed[Y=3.555-0.202.X1+0.111.X2(Y=green speed, X1=mowing height, X2=rolling)]. Thus, rollers is thought to be an tool used to increase green speed and rolling is expected to be able to decrease turfgrass stress while maintaining the performance level of the putting green. Dew removal appeared to increase green speed significantly[Y=2.499-0.125.X1+0.366.X3(Y=green speed, X1=mowing height, X3=dew removal)]. Thus, dew removal is expected to maintain the green speed in the morning.
Journal of the Korean Institute of Landscape Architecture
/
v.31
no.3
/
pp.91-106
/
2003
The objective of this study is to present management methods for Korean golf courses to achieve fast green that satisfies international golf tournament standards during an official golf tournament. The results of both the research and the comparative study on putting green management of 24 tournaments hosted in Korea and 12 tournaments hosted in overseas countries in 2002 are as follows: 1. As for the putting greens in Korean and foreign golf courses where official golf tournaments were held, Korean of official golf tournaments were mainly opened in two-green system golf courses contrary to the foreign cases, and the average size of the greens in Korean golf courses was shown to be greater than that of foreign golf courses to some extent, although there was no difference between the types of turf varieties. 2. Results have shown that unlike foreign golf courses, Korean golf courses were managing putting greens by using greens mowers mostly for general (non-tournament) management, and elaborate rolling attempts failed during official tournament flay week because of an insufficient number of rollers to be input. Therefore, Korean golf courses are required to make efforts to secure 21-inch working-behind greens mowers equipped with tournament bedknifes and 11 blades, which is the greens mowing equipment for professional tournaments, and rollers above all things in order to achieve fast green during tournament play week 3. In attempting to achieve green as fast as that of foreign golf courses, Korean golf courses need to consider the method of performing mowing at 3.0mm height or less with greens mowers for professional tournaments. This needs to be done more than two times, followed by a continuous practice of rolling for proper management.
The purpose of this study is to find the suitable putting green maintenance equipment for improving the quality of putting green. This study was carried out to investigate the green speed(i.e., ball roll distance) by different the types of greens mower(between work-behind greens mower and riding greens mower), the types of reel blades(between 9 blades and II blades) and the types of roller(between riding soil sprayer and lightweight roller). Green speed of golf course putting greens is assessed by use of Stimpmeter. The west course of Lakeside Country Club was selected for the case study. The results are summarized as follows; 1. The green speed was faster in 3.8 mm moving height treatment plot using work-behind greens mower than in 3.8 mm moving height treatment plot using riding greens mower right after the moving and even after eight hours had passed, and it was statistically significant at a 95% confidence level. Therefore, work-behind greens mower was judged to be a proper equipment type for the fast green management practice than riding greens mower. 2. The green speed was faster in 3.2 mm mowing height treatment plot using work-behind greens mower equipped with II blades than in 3.2 mm mowing height treatment plot using work-behind greens mower equipped with 9 blades, and this result was statistically significant at a 95% confidence level. Therefore, II-blade was judged to be a proper blade type for the fast green management practice than 9-blade. 3. The difference in green speed (green speed increased after rolling) between a treatment plot mowed at 3.0 mm mowing height with the work-behind greens mower and then rolled a single time with riding soil sprayer and a treatment plot mowed at 3.0 mm mowing height with the work-behind greens mower and then rolled once with lightweight roller was not statistically significant at a 95% confidence level. However, the difference in green speed (green speed decreased after rolling) between two treatment plots measured after eight hours had passed was statistically significant at a 95% confidence level. Therefore, the lightweight roller was judged to be a proper roller type for the fast green management practice than the riding soil sprayer.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.