• Title/Summary/Keyword: standby demand

Search Result 20, Processing Time 0.026 seconds

A Study on Smart Home Power-Control System with Power-Saving Green Adapter (전력절감 그린어뎁터를 이용한 스마트홈 전력 통제시스템)

  • Yoo, Seung-Jae;Park, Hee-Dong;Kim, Song-Gang
    • Convergence Security Journal
    • /
    • v.13 no.4
    • /
    • pp.85-92
    • /
    • 2013
  • Today we have an obligation to pass the beautiful earth and enrich people's lives to next generations. According to the keynote, governments have a lot of resources to support the smart grid policies. Also the demand of the implementation of smart home applied the concept of smart grid is increasing rapidly. But the construction of smart home is centered on a new public housing except the pre-existing house which is counted for most of more than 90% of total. In this study, we suggest the implementation solution to make smart-homelike for the pre-existing houses without additional wiring or construction. We develop the technology reducing the unnecessary standby power 800mW to 20mW drastically. If we apply this technology, by the power off of main IC the actual power depends on the consumption of minimal devise located on the AC input side. Then the standby power becomes approximately 20mW(110ac).

A Study on Current Status Survey and Utilization of Emergency Generator Installation (비상발전기 설치 실태조사 및 활용 방안에 대한 고찰)

  • Lim, Hyun-Sung;Han, Un-Ki;Jung, Jin-Soo;Park, Chan-Eom;Song, Young-Sang;Choi, Jong-Soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.10
    • /
    • pp.34-38
    • /
    • 2015
  • Recently, the power supply situation has deteriorated and the plan has issued to utilize of emergency generators for securing standby power. If a part of Emergency Generators was utilized by peak shaving, it can be avoiding over-investment in supply power facility. In this paper we investigate management of Emergency Generator and understand the current situation. So, we verify demand response resource possibility of Emergency Generator.

PoMP : Power conscious Multimedia Player (저전력 멀티미디어 재생 기법)

  • Park, Jung-Wan;Won, You-Jip
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04d
    • /
    • pp.253-255
    • /
    • 2003
  • Electricity is the prime commodity in mobile device, e.g. smart phone, PDA, MP3 player and etc. This strict restriction on power consumption requirement of the mobile device puts unique demand in designing hardware and software components of the device. In this paper, we address the issue of minimizing the power consumption in retrieving the continuous media data from the disk drive for real-time playback purpose. Different from the legacy text based data, real-time multimedia playback requires that the storage supplies the data block continuous fashion. This may put immense burden on the power scarce environment since the disk Is required to be active for the entire playback duration. We develop elaborate algorithm which carefully analyzes the power consumption profile of the disk drive and which establishes the data retrieval schedule for the given playback. It computes the amount of data blocks to read, the length of active and standby period. According to our simulation result, the ARM algorithm exhibits superior performance in continuous media retrieval from the aspect of power consumption to legacy playback scheme.

  • PDF

Tall Buildings and Elevator Technologies: Improving Energy Efficiency

  • Kheir Al-Kodmany
    • International Journal of High-Rise Buildings
    • /
    • v.12 no.2
    • /
    • pp.169-177
    • /
    • 2023
  • The massive increase in elevator usage and a severe demand for energy efficiency have prompted manufacturers to develop various innovative technologies, including AC and gearless motors, machine-room-less (MRL) technologies, regenerative drives, elevator ropes, and LED lighting. In addition, manufacturers are providing software solution systems such as destination dispatching systems, people flow solutions, standby mode, and predictive maintenance applications. Future technologies include electromagnetic levitation, circulating multi-car elevator systems, robotization, and drones. This article outlines elevators' technological advancements. It discusses how to harness new technologies and apply them to aging, modern, and future buildings.

A Study on the Problems in Exercising Buyer's Right to Claim Damages for the Breach of Contract by the Seller in International Sales Contract - Focusing on CISG and UNIDROIT Principles(2010) - (국제물품매매계약에서 매도인의 계약위반에 대한 매수인의 손해배상청구권 행사의 문제점 - CISG와 UNIDROIT Principles(2010)을 중심으로-)

  • Oh, Won Suk;Youn, Young Mi;Lim, Sung Chul
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.58
    • /
    • pp.3-33
    • /
    • 2013
  • The purpose of this paper is to examine the problems in exercising buyer's right to claim damages for the breach of contract by the seller in international sales contract and to suggest reasonable counter-measures. The main contents are as follows: First, this author analyzed the principles of the seller's liability for damages in detail and examined the methods for the calculation of damages on the basis of Arts.74~77. As these articles are found to be insufficient in practical application, this author further examined the UNIDROIT Principles(2004) to confirm whether these Principles can fill the gaps of CISG or not, which turned out their gap-filling functions. Second, this author tried to find any expected problems when the buyer resorts to the right to claim damages in case of the seller's breach of contract including the estimation of damages, the burden of proof, causation, the proof of appropriateness for avoidance, the proof of buyer's obligation to mitigate the loss and so on. The reason is that these problems may cause a lot of difficulties in real business. As result, many buyers have given up their reasonable rights to claim damages so far. Finally, from the buyer's perspective, this author would like to suggest a liquidated damage clause(LD Clause) which gives the buyer to received a specified sum in case of seller's non-performance and/or a demand guarantee(or standby L/C) which guarantees buyer to secure unconditional payment independent of the underlying contract. For these purposes, the buyer should try to insert the LD Clause and/or Guarantee Clause in the contract when the buyer and the seller negotiate the sales contract. Also there are a lot of considerations and limitations in using the LD Clause and the Guarantee Clause in their real business, mainly dependent up bargain power between the seller and the buyer, for which this author promise to examine in detail in the future.

  • PDF

Single-Inductor, Multiple-Input-Single-Output Converter Based Energy Mixer for Power Packet Distribution System

  • Reza, C.M.F.S.;Lu, Dylan Dah-Chuan;Qin, Ling;Qi, Jian
    • Journal of Power Electronics
    • /
    • v.18 no.5
    • /
    • pp.1479-1488
    • /
    • 2018
  • Power packet (PP) distribution system distributes power to different loads that share the same distribution cable in a packetized form. When compared with conventional power systems, a PP distribution system (PPDS) can reduce standby power, eliminate Point-of-Load (PoL) power conversion, and intelligently control the load demand from the source side. Due to the absence of PoL conversion, when multiple power sources at different voltage levels and conditioning requirements jointly send power to various loads at different voltage ratings, the generated voltage has an irregular shape. A large filter at each of the load sides is required to reduce such a large voltage ripple. In this paper, a single-inductor, multiple-input-single-output converter structure based multiple-energy-source mixer is proposed. It combines PP generation, maximum power point tracking (MPPT) of renewable energy sources (RESs) and filtering at the source side. To demonstrate the possible renewable energy integration, a PV panel is used as a power source together with other constant voltage sources. The PV power is approximately tracked using the constant voltage method and it is used for each of the PP generations. The proposed PP distribution system is experimentally verified and it is shown that a conventional PI controller is sufficient for stable system operation.

Multi-Phase Buck Converter with Fast Transient Response (빠른 응답을 갖는 멀티페이스 벅 변환기)

  • Lee, Yoon-Jae;Roh, Jeongjin
    • Journal of IKEEE
    • /
    • v.20 no.3
    • /
    • pp.314-317
    • /
    • 2016
  • Recently, efforts to maximize battery life in progress with an increase in the demand for portable devices. In this paper, we propose multi-phase buck converter with fast transient response. Multi-phase buck converter may be used for the output capacitor of small size because the ripple cancellation effect, it is possible to use an inductor having an inductance less. The portable device for quick change from standby mode to active 4-phase design structure was given a fast transient response. The proposed multi-phase buck converter was fabricated using a 0.18 um CMOS process and the supply voltage ranges from 2.7V to 3.3V, the maximum load current is 500mA and settling time is 10us.

EXPERIMENTAL INVESTIGATIONS RELEVANT FOR HYDROGEN AND FISSION PRODUCT ISSUES RAISED BY THE FUKUSHIMA ACCIDENT

  • GUPTA, SANJEEV
    • Nuclear Engineering and Technology
    • /
    • v.47 no.1
    • /
    • pp.11-25
    • /
    • 2015
  • The accident at Japan's Fukushima Daiichi nuclear power plant in March 2011, caused by an earthquake and a subsequent tsunami, resulted in a failure of the power systems that are needed to cool the reactors at the plant. The accident progression in the absence of heat removal systems caused Units 1-3 to undergo fuel melting. Containment pressurization and hydrogen explosions ultimately resulted in the escape of radioactivity from reactor containments into the atmosphere and ocean. Problems in containment venting operation, leakage from primary containment boundary to the reactor building, improper functioning of standby gas treatment system (SGTS), unmitigated hydrogen accumulation in the reactor building were identified as some of the reasons those added-up in the severity of the accident. The Fukushima accident not only initiated worldwide demand for installation of adequate control and mitigation measures to minimize the potential source term to the environment but also advocated assessment of the existing mitigation systems performance behavior under a wide range of postulated accident scenarios. The uncertainty in estimating the released fraction of the radionuclides due to the Fukushima accident also underlined the need for comprehensive understanding of fission product behavior as a function of the thermal hydraulic conditions and the type of gaseous, aqueous, and solid materials available for interaction, e.g., gas components, decontamination paint, aerosols, and water pools. In the light of the Fukushima accident, additional experimental needs identified for hydrogen and fission product issues need to be investigated in an integrated and optimized way. Additionally, as more and more passive safety systems, such as passive autocatalytic recombiners and filtered containment venting systems are being retrofitted in current reactors and also planned for future reactors, identified hydrogen and fission product issues will need to be coupled with the operation of passive safety systems in phenomena oriented and coupled effects experiments. In the present paper, potential hydrogen and fission product issues raised by the Fukushima accident are discussed. The discussion focuses on hydrogen and fission product behavior inside nuclear power plant containments under severe accident conditions. The relevant experimental investigations conducted in the technical scale containment THAI (thermal hydraulics, hydrogen, aerosols, and iodine) test facility (9.2 m high, 3.2 m in diameter, and $60m^3$ volume) are discussed in the light of the Fukushima accident.

A Study on Electric Power Monitoring System per Appliance (기기별 전력 모니터링 시스템 개발에 관한 연구)

  • Park, Sung-Wook;Kim, Jong-Shick;Lim, Su-Jin;HwangBo, Sea-Hee;Son, Joon-Ik;Lee, In-Yong;Wang, Bo-Hyeun
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.20 no.5
    • /
    • pp.638-644
    • /
    • 2010
  • This paper presents ideas of service scenarios for home residents using electric power monitoring system per appliance, the implementation of the monitoring system, and analysis of acquired electric power usage pattern. By acquiring and analyzing electric power usage pattern, home residents can get information of power usage pattern of every legacy (non-Demand Response-ready) appliance. Further they can get pieces of recommendation how to reduce energy consumption, intelligent standby power blocking service, and alarming service to abnormality of appliances. In order to check the feasibility of the ideas, a system that can acquire electric power pattern per appliance is implemented, and electric power pattern of some appliances are stored to a database and it was analyzed to show if auto-identification of a type of a device is possible, which is a basic required function for the scenarios presented.

A Study on the Unfair Calling under the Independent Guarantee (독립보증상의 수익자에 의한 부당청구(unfair calling)에 관한 연구)

  • Oh, Won-Suk;Son, Myoung-Ok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.42
    • /
    • pp.133-160
    • /
    • 2009
  • In International trade the buyer and seller are normally separated from on another not only by distance but also by differences in language and culture. It is rarely possible for the performance of obligations to be simultaneous and the performance of contracts therefore calls for trust in a situation in which the parties are unlikely to feel able to trust each other unless they have a longstanding and successful relationship. Thus the seller under an international contract of sale will not wish to surrender documents of title to goods to the buyer until he has at least an assurance of payment, and no buyer will wish to pay for goods until he has received them. A gap of distrust thus exists which is often bridged by the undertaking of an intermediary known and trusted by both parties who will undertake on his own liability to pay the seller the contract price in return for the documents of title and then pass the documents to the buyer in return for the reimbursement. This is a common explanation of the theory behind the documentary letter of credit in which the undertaking of a bank of international repute serves as a "guarantee" to each party that the other will perform his obligations. The independence principle, also referred to as the "autonomy principle", is at the core of letter of credit or bank guarantee law. This principle provides that the letter of credit or bank guarantee is independent of the underlying contractual commitment - that is, the transaction that the credit is intented to secure - between the applicant and the beneficiary ; the credit is also independent of the relationship between the bank and its customer, the applicant. The most important exception to the independence principle is the doctrine of fraud in the transaction. A strict interpretation of the rule that the guarantee is independent of the underlying transaction would lead to the conclusion that neither fraud nor manifest abuse of rights by the beneficiary would constitute an objection to payment. There is one major problem related to "Independent guarantees", namely abusive or unfair callings. The beneficiary may make an unfair calling under the guarantee. The countermeasure of beneficiary's unfair calling divided three cases. First, advance countermeasure namely by contract. In other words, when the formation of the contract, the parties must insert the Force Majeure Clause, Arbitration Clause to Contract, and clear statement to the condition for demand calling. Second, post countermeasure namely by court. Many countries, including the United States, authorize the courts to grant an order enjoining the issuer from paying or enjoining the beneficiary from receiving payment under the guaranty letter. Third, Export Insurance. For example, the Export Credit Guarantees Department is prepared, subject to certain conditions, to cover the risk of unfair calling. Of course, KEIC in Korea is cover the risk of the all things for guarantees. On international projects, contractor performance is usually guaranteed by either a standby letters of credit or Independent guarantee. These instruments will be care the parties.

  • PDF