Steel beams are one of primary member and those carries the horizontal load and floor load to axial member. To avoid structural failure when the steel beams are exposed to fire, fire resistance performance requires. Till now, the evaluation for fire resistance of the beam was conducted using the maximum load and standard fire curve defined in the KS F 2257. But recently the constructional patterns are changing toward multi-function performance to get a better structural performance and fire resistance as well. In this paper to get the databases for fire resistance, limiting temperatures of the beam, load-bearing fire tests according to load ratios, two grades of compressive concrete strengths were applied.
In this paper, in order to analyze the response characteristics of the smoke detectors which is suitable with the residential fire detector, the paper fire and flammable liquid fire experiment came to be accomplished according to UL Standard for safety for smoke detector for fire alarm signaling systems, UL 268. Also Photoelectric smoke detector, the Analog smoke detector and the single station alarm device came to be used with the specimen and the response characteristics of the smoke detectors which follows in these two types(paper, flammable liquid) test fire came to be analyzed. As a result, according to test fire there was some difference to response characteristics of the smoke detectors.
This paper examined the structure, fire resistance of brass fittings type CSST employed in gas appliances and the reliability verification. Brass fittings of type CSST consisted of cladding, tubing, nut, clamp ring, socket, and ball valve. The applicable JIA standard regulates the maximum working pressure to be 4.2 kPa, which is the highest pressure of the relevant standards and the KS D 3625 stipulates the maximum pressure to be 3.24 kPa. With a normal product, the average resistance within the confidence interval was found to be $7.36m{\Omega}$. The average resistance within the confidence interval was $6.67m{\Omega}$ after the fire resistance tests. The analysis indicated that the AD was 1.584 and the standard deviation was 0.3972 with respect of a normal product. Compared to the normal product, however, the damaged product after the fire resistance test showed better features, such as an AD of 1.145 and a standard deviation of 0.2467. Moreover, the average resistance of the normal product was $7.359m{\Omega}$ and the standard deviation in histogram analysis was 0.3972. The average resistance of the damaged product after the fire resistance test in the histogram was $6.67m{\Omega}$ and the standard deviation was 0.2467.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.27
no.5
/
pp.89-94
/
2013
The fire testing performed for smoke detector model approval in Korea tests only one kind of fire smoke. A photoelectric spot-type smoke detector using Mie scattering is affected by the wavelength of light beam and the particle diameter. According to UL (Underwriters Laboratories Inc.) 268 standard, this paper analyze the characteristic of the response for a photoelectric spot-type smoke detector on sale in Korea using various fire smokes. Probability that the response time is included in non-defective range is 100% in paper fire, 90% in wood fire and 75% in flammable liquid fire, 90% in wood fire and 75% in flammable liquid fire. According to the estimation for population mean of the response time choosing a confidence level of 99%, a maximum of 19% for wood fire and that of 38% for flammable liquid fire are defective. As the result of analysis of smoke particle, this paper is found that these results are caused by the smoke particles are wide variations in size or have very black.
Proceedings of the Korea Institute of Fire Science and Engineering Conference
/
1997.11a
/
pp.439-449
/
1997
Studies have been carried out to determine the effect of sprinklers on fires typical of a number of occupancies including simulated of office furniture, supermarkets, carpet displays, libraries, video stores and liquor stores. After surveys of actual fire loads, the experiments were conducted in a specially designed sprinklered fire-calorimeter with a collecting hood 6 m x6 m leading to a vertical duct 1 m in diameter. Details of the rig are given elsewhere [1]. Only well ventilated fires were studied. Rate of heat release and production of various toxic chemicals were monitored during the tests. Both sprinklered and unsprinklered fires were used. The results were used to establish the unsprinklered burning behaviour and the fire-control effects of sprinklers. Before sprinkler operation, the rate of fire growth could be modelled as 12_fires as given in NFPA 92B (1991 Edition) [2]. It was found that operation of sprirnklers controlled but did not extinguish the fires. This was expected as parts of the fire load were shielded from the spray. Also there were significant increases in the concentration of carbon monoxide when the sprinklers operated. Sprinklers had little effect on the concentrations of other toxic products measured. The results from the tests were extrapolated to large single storey buildings for the same occupancy classes and the results used to compare the required and the available escape times for different occupancies, particularly whether the use of sprinklers would improve the chances of escape from those premises. It was found that in most of the cases studied, adequate escape times will be available without any special measures. For very rapid fire growths, however, special measures, such as availability of trained staff may be needed. Standard response sprinklers will have little impact.
Park, Jeong-Hwa;Oh, Cheon-Young;Kwark, Ji-Heon;Son, Bong-Sei
Fire Science and Engineering
/
v.30
no.3
/
pp.55-61
/
2016
In this study, to determine whether it is possible to apply Polyethylene (PE) compound pipe, which was developed to solve the problem caused by the corrosion of the fire protection piping currently in usein water based fire extinguishing systems, we performed an actual mockup fire test. Since no test standard was available related to the developed compound pipe, we compared and analyzed domestic and international technical materials and test standards and selected suitable fire test standards to evaluate the performance of the PE compound pipe. we applied two fire test standards to the PE compound pipe, viz. those for CPVC and metallic pipes, and conducted a total of 6 experiments to evaluate its performance. According to the results of the first and second fire tests based on the test standard for the CPVC pipe, neither the fitting nor the piping was damaged or deformed and no leakage was observed in the pressure test, which was performed for 5 minutes. For the fire test based on the metallic pipe test standard, a total of 4 experiments were conducted. The first two experiments were conducted to simulate the wet piping system. In the results of this fire test, neither leakage nor rupture was observed from the PE compound pipe and no damage was caused, such as the secession of the PE material. However, in the next two experiments, which simulated the dry system, the PE compound pipe suffered damage and rupture, including deformation before the fire fighting water was discharged. Therefore, we found that the piping performance of the PE compound pipe did not undergo any deterioration, including fusion, deformation, or damage, in the wet piping system simulated fire test.
On the result of load-bearing fire test to confirm the fire resistance of a composit beam, if the composit beam has lower fire resistance than required standard, it can be improved by section change. But if there are many types of section change, it takes much time and cost owing to conducting many tests. On this study, it was confirmed which part of the asymmetric H-section composit beam affected most on fire resistance by heat-transfer analysis. Then, we checked the tendency of improving fire resistance depend on section change by heat-transfer and non-linear structural analysis and suggested a changed section having 1-hour fire resistance.
The purpose of thisanalytical study of an iTECH composite beam subjected to fire conditions is to determine the beam's fire resistance performance using its load ratio and fire protection as parameters. A composite structural system is expected to have a safer and more economical fire safety design than a mere collection of isolated members.heat transfer analysis was performed on the basis of the finite element program ANSYS 10.0 using an ISO834 standard fire, following the main guidelines proposed by EC1 Part 2.2 and EC4 Part 1.2. To validate the analytical simulation of the iTECH composite beam, comparison of the experimental tests was proposed.
This paper discusses the results and observations from a large-scale fire test conducted on a slim floor system, comprising asymmetric beams, rectangular hollow section beams and a composite floor slab. The structure was subjected to a fire where the fire load (combustible material) was higher that that found in typical office buildings and the ventilation area was artificially controlled during the test. Although the fire behaviour was not realistic it was designed to follow as closely as possible the time-temperature response used in standard fire tests, which are used to assess individual structural members and forms the bases of current fire design methods. The presented test results are limited, due to the malfunction of the instrumentation measuring the atmosphere and member temperatures. The lack of test data hinders the presentation of definitive conclusions. However, the available data, together with observations from the test, provides for the first time a useful insight into the behaviour of the slim floor system in its entirety. Analysis of the test results show that the behaviour of the beam-to-column connections had a significant impact on the overall structural response of the system, particularly when the end-plate of one of the connections fractured, during the fire.
Lim, Ohk Kun;Choi, Sengkwan;Kang, Sungwook;Kwon, Minjae;Choi, J. Yoon
Steel and Composite Structures
/
v.32
no.6
/
pp.743-752
/
2019
Steel and concrete composite structures are commonly applied in multi-story buildings as they maximise the material strength through composite action. Despite the popularity of employing a trapezoidal deck slab, limited experimental data are available under elevated temperatures. The behaviour of the headed shear stud embedded in a transverse trapezoidal deck and solid slab was investigated at both ambient and fire conditions. Twelve push-out tests were conducted according to the ISO 834 standard fire utilising a customised electric furnace. A stud shearing failure was observed in the solid slab specimen, whereas the failure mode was changed from a concrete-dominated failure to the stud shearing in the transverse deck specimen with an increase in temperature. Comparisons between the experimental observations and design requirements are presented. The Eurocode design guidance on the transverse deck slab gives a highly conservative estimate for shear resistance. A new design formula was proposed to determine the capacity of the shear connection regardless of the slab type when the stud shearing occurs at high temperatures.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.